【正文】
總結(jié)分析出目前橋梁樁基施工技術(shù)存在的欠缺,為今后的橋梁樁基施工提供了一些可以借鑒的觀點(diǎn)。歸納質(zhì)量控制點(diǎn),總結(jié)常見(jiàn)質(zhì)量問(wèn)題,分析質(zhì)量事故發(fā)生的原因,研究相應(yīng)的處理對(duì)策,找出了質(zhì)量控制的途徑,從而保證樁基施工質(zhì)量。本文通過(guò)分析橋梁樁基施工質(zhì)量保證的五大要點(diǎn):橋梁樁基施工前的準(zhǔn)備、挖孔、灌注樁及成樁質(zhì)檢。往往由于工藝不當(dāng)、管理不嚴(yán)、斷樁、堵管、夾泥、蜂窩、少灌等質(zhì)量問(wèn)題時(shí)有發(fā)生。樁基具有入土深、能入巖、剛度大、承載力高、樁身變形小,可方便進(jìn)行水下施工等優(yōu)點(diǎn),已被廣泛應(yīng)用到工程建設(shè)中。s quality is more difficult to control, but quality has a direct impact on the overall quality of the bridge pile foundation. Pile foundation with buried deep in rock, high rigidity, high bearing capacity, deformation of the pile, can facilitate the advantages of underwater construction, has been widely applied in construction. Due to the increasing application of pile, how to ensure the quality of engineering bees a primary concern. Improper, ineffective management and often broken, blocked pipes, mud, honeybs, less irrigation problems have occurred. Therefore, using scientific technology, strengthen process control to ensure the quality of projects is extremely important. Bridge pile foundation construction quality assurance through analysis of five main elements: getting ready for a bridge pile base construction, digging holes, piles and pile quality control. Briefly analyzed from these four aspects of bridge pile foundation construction and qualityassured priority link. Antibody quality control points, summarize the mon quality problems and analyze the causes of accidents and study on corresponding countermeasures, identify a quality control approach, so as to ensure the quality of pile foundation construction. Construction technology for bridge pile foundation in accordance with what is, four key points of the quality of pile foundation construction of bridge, the four points of how it will be used to guarantee quality of bridge construction, Kaizen bridge described in the order. Analysis of construction technology for bridge pile foundation at present lack of bridge pile base construction for the future provides some useful ideas.隨著社會(huì)發(fā)展,市場(chǎng)經(jīng)濟(jì)不斷深化,我國(guó)高速公路及城市建設(shè)發(fā)展迅猛。也希望本文能對(duì)今后的橋梁樁基施工有一定的積極作用。一個(gè)沒(méi)有嚴(yán)謹(jǐn)作風(fēng)的團(tuán)隊(duì)是沒(méi)有資格進(jìn)行這種重大項(xiàng)目的,所以施工質(zhì)量保證的核心與其說(shuō)是四大要點(diǎn)的實(shí)施,不如說(shuō)是整個(gè)施工團(tuán)隊(duì)對(duì)整個(gè)工程的責(zé)任心。發(fā)展的動(dòng)力是技術(shù),但掌舵的永遠(yuǎn)是人。不論是前期的工程準(zhǔn)備,施工中對(duì)挖孔、灌注樁的技術(shù)實(shí)施還是工程結(jié)束后的質(zhì)量檢測(cè),任何一個(gè)步驟都不容許忽視。(1)樁基施工任務(wù)書(shū)、技術(shù)要求;(2)樁基巖土工程報(bào)告;(3)樁基施工圖,樁位測(cè)量放線圖(包括工程樁位線復(fù)核簽證單);(4)樁位竣工平面圖(基坑開(kāi)挖至設(shè)計(jì)標(biāo)高的樁位圖);(5)經(jīng)審定的施工組織設(shè)計(jì)、施工方案及執(zhí)行中的變更情況;(6)圖紙會(huì)審紀(jì)要、設(shè)計(jì)變更單及材料代用通知單、事故處理記錄等;(7)構(gòu)件與材料(預(yù)制樁、鋼管樁、鋼筋、鋼材、水泥及焊條等)質(zhì)量保證書(shū)、出廠證及檢驗(yàn)報(bào)告;(8)灌注樁用材料(鋼筋、鋼材、水泥、砂、石、外加劑、焊條及商品混凝土等)的試驗(yàn)報(bào)告及混凝土配合比、坍落度等試驗(yàn)報(bào)告;(9)樁的工藝試驗(yàn),包括:試打(對(duì)于打入式樁)、試壓(對(duì)于壓入式樁)或試成孔(對(duì)于灌注樁)的記錄;(10)樁施工日志;(11)樁與承臺(tái)的施工記錄或施工記錄匯總表以及質(zhì)量檢查表;(12)隱蔽工程驗(yàn)收記錄;(13)樁的靜載試驗(yàn)、動(dòng)測(cè)試驗(yàn)和原位測(cè)試報(bào)告;(14)施工監(jiān)理記錄;(15)樁基施工承包合同書(shū)。當(dāng)樁頂設(shè)計(jì)標(biāo)高低于施工場(chǎng)地標(biāo)高,送樁后無(wú)法對(duì)樁位進(jìn)行檢查時(shí),對(duì)打入樁可在每根樁樁頂沉至場(chǎng)地標(biāo)高時(shí),進(jìn)行中間驗(yàn)收,待全部樁施工結(jié)束,承臺(tái)或底板開(kāi)挖到設(shè)計(jì)標(biāo)高后,再做最終驗(yàn)收。要把質(zhì)量管理的重點(diǎn),從產(chǎn)品質(zhì)量轉(zhuǎn)到工作質(zhì)量上來(lái),只有搞好工作質(zhì)量,才能保證提高產(chǎn)品質(zhì)量。工作質(zhì)量是與產(chǎn)品質(zhì)量有關(guān)的工作對(duì)于產(chǎn)品質(zhì)量的保證程度,前者是后者的基礎(chǔ)和保證。樁也是產(chǎn)品,符合技術(shù)標(biāo)準(zhǔn)的就是合格品,反之就是不合格品。對(duì)于樁基工程而言,所依據(jù)的技術(shù)標(biāo)準(zhǔn)有:(1)國(guó)家標(biāo)準(zhǔn):(JTJ0412000)[S].北京:人民交通出報(bào)社,2000。1)確定項(xiàng)目質(zhì)量目標(biāo);2)編制項(xiàng)目質(zhì)量計(jì)劃;3)實(shí)施項(xiàng)目質(zhì)量計(jì)劃;4)項(xiàng)目質(zhì)量持續(xù)改進(jìn)與檢查、驗(yàn)證。C質(zhì)量控制應(yīng)堅(jiān)持“質(zhì)量第一,預(yù)防為主”的方針,堅(jiān)持以人為控制的核心,堅(jiān)持質(zhì)量標(biāo)準(zhǔn),堅(jiān)持全面控制;還應(yīng)實(shí)施“計(jì)劃、執(zhí)行、檢查、總結(jié)”(P它涉及質(zhì)量形成全過(guò)程的各個(gè)環(huán)節(jié),其內(nèi)容涉及專(zhuān)業(yè)技術(shù)和管理技術(shù)兩個(gè)方面。因此,推行樁基施工全面質(zhì)量管理時(shí),也應(yīng)該注意做到“三全、一多樣”,即全員、全過(guò)程、全企業(yè)的質(zhì)量管理,所運(yùn)用的方法必須多種多樣,因地制宜。埋管一旦發(fā)生,應(yīng)用手動(dòng)葫蘆,或千斤頂試拔,如仍拔不出,若砼未初凝且樁孔徑較大,可另下導(dǎo)管,按前述導(dǎo)管滲水的辦法來(lái)處理,若已初凝,作斷樁處理。a、專(zhuān)人測(cè)量,保證導(dǎo)管埋深任何時(shí)候不得大于6m。a、導(dǎo)管埋入砼過(guò)深。b、若由第“”種原因引,可抖動(dòng)導(dǎo)管,或長(zhǎng)桿沖搗,仍不下,則視澆注開(kāi)始的時(shí)間來(lái)定措施,如剛開(kāi)始或開(kāi)始不久,澆入砼量很小,可采用上述“a”的辦法處理,如澆注開(kāi)始時(shí)間很久或澆入的砼量很大,無(wú)法清理干凈,應(yīng)按導(dǎo)管進(jìn)水糾正措施第“Cb”條處理。c、澆注前應(yīng)檢查各種機(jī)械的情況,嚴(yán)禁帶病作業(yè),砼供應(yīng)要及時(shí),禁止?jié)沧⑦^(guò)程等待砼情況的發(fā)生。 a、嚴(yán)格控制導(dǎo)管底口標(biāo)高,管口與孔底距離應(yīng)保持30~50cm;隔水栓不可做得過(guò)大,應(yīng)比導(dǎo)管直徑稍小。b、砼中夾有大石塊卡管,或砼拌合不勻,運(yùn)輸中產(chǎn)生離析,粗骨料集中卡管。c、若由第“”種原因引起,重新插入導(dǎo)管,按上述第2條辦理。注意:砼澆注前應(yīng)準(zhǔn)備兩套導(dǎo)管及潛水泵、吸泥機(jī),如出現(xiàn)導(dǎo)管漏水,應(yīng)以盡可能的速度拔出舊管,插入新管,抽水、吸泥應(yīng)在砼初凝前完成各項(xiàng)任務(wù)。b、若由第“”種原因引起,應(yīng)更換新導(dǎo)管,將其插入砼下50cm以上,抽出導(dǎo)管內(nèi)的水并掏出管底已混入泥漿的砼,繼續(xù)澆注。提升導(dǎo)管時(shí)不得猛提,應(yīng)緩緩提升,防止將導(dǎo)管拔離砼面。換后,重做水壓試驗(yàn),直至合格。b、準(zhǔn)確測(cè)量護(hù)筒頂及孔底標(biāo)高,據(jù)此來(lái)確定導(dǎo)管長(zhǎng)度,導(dǎo)管底口距孔底應(yīng)為3050cm。d、導(dǎo)管提升過(guò)猛,將底口拔離砼頂面。b、導(dǎo)管底口與孔底距離過(guò)大,第一斗砼不能埋住導(dǎo)管下口。c、出現(xiàn)縮孔可采用上、下反復(fù)掃孔的方法以擴(kuò)大孔徑至設(shè)計(jì)要求。a、鉆頭出現(xiàn)磨損,及時(shí)補(bǔ)焊。b、鉆頭磨損,未及時(shí)補(bǔ)焊,會(huì)出現(xiàn)縮孔。b、水中鉆孔的護(hù)筒接縫焊接良好,如既已發(fā)生,可潛水用棉絮堵塞。b、深水鉆孔的護(hù)筒接縫不嚴(yán)密;護(hù)筒埋設(shè)太淺。g、如卡鉆嚴(yán)重,小錐沖擊無(wú)效時(shí),可試用水下爆破提鉆,炸藥量應(yīng)采用小量,能振動(dòng)鉆頭即可,以防炸坍鉆孔。d、停鉆時(shí),應(yīng)將鉆頭提出,不得放于孔中,以防埋鉆。b、防止落物入孔。c、停鉆時(shí),將鉆頭放于孔底。、埋鉆、埋鉆原因a、鉆頭磨損未及時(shí)補(bǔ)焊,鉆孔直徑逐漸變小,而新鉆頭或補(bǔ)焊過(guò)的鉆頭直徑過(guò)大。c、如出現(xiàn)卡鉆,應(yīng)查明卡鉆的原因,有針對(duì)性地采取措施,不得強(qiáng)提強(qiáng)扭。a、經(jīng)常檢查鉆具,鋼繩和聯(lián)接裝置,如有損壞及時(shí)更換;機(jī)械應(yīng)由有相應(yīng)資質(zhì)的人員操作;卷?yè)P(yáng)機(jī)軸上的鋼絲繩在任何情況下,不得少于3圈。b、卡鉆時(shí),強(qiáng)提強(qiáng)扭。如偏斜嚴(yán)重,應(yīng)回填砂和粘土(或砂礫和黃土)至偏斜處,待沉積密實(shí)后再行鉆進(jìn)。鉆頭中心、鋼索、護(hù)筒中心三者應(yīng)在一條豎直線上,并經(jīng)常檢查校正。c、鉆進(jìn)過(guò)程中,沖擊要均勻,不得時(shí)快時(shí)慢,使鉆頭擺動(dòng)。b、在有傾斜的軟、硬地層鉆進(jìn)時(shí),應(yīng)低速鉆進(jìn),或回填片、卵石沖平后再鉆進(jìn)。d、鉆機(jī)底座未安置水平或產(chǎn)生不均勻沉陷。b、在有傾斜度的軟硬地層交界處,巖面傾斜處鉆進(jìn);或粒徑大小懸殊的砂卵層中鉆進(jìn),鉆頭受力不均。g、如發(fā)生孔內(nèi)坍塌,判明坍塌位置,回填粘土混合物到坍孔處以上1~2m,如坍孔嚴(yán)重時(shí)應(yīng)全部回填,待回填物沉積密實(shí)后再行重鉆。e、控制好沖擊鉆的松繩長(zhǎng)度及沖擊頻率,避免沖擊鉆頭或掏渣筒撞擊孔壁。d、在松散粉砂土或流砂中鉆進(jìn)時(shí),應(yīng)控制進(jìn)尺速度,選用較大比重、粘度、膠體率的泥漿。b、搗渣或清孔時(shí)指定專(zhuān)人補(bǔ)水,保證孔內(nèi)水頭必要的高度;供水管不要直接插入鉆孔中,應(yīng)通過(guò)水槽或水池使水流速減慢后流入孔中。h、吊入鋼筋骨架時(shí)碰撞孔壁。f、沖擊鉆或掏渣筒傾倒,撞擊孔壁。c、護(hù)筒埋置太淺,下端孔口漏水,坍塌或孔口附近地面受水浸濕泡軟,或鉆機(jī)裝置在護(hù)筒上,由于振動(dòng)使孔口坍塌,擴(kuò)展成較大坍孔。a、泥漿比重不夠及其它泥漿性能指標(biāo)不符合要求,使孔壁未形成堅(jiān)實(shí)的泥皮。常見(jiàn)的鉆孔(包括清孔時(shí))事故及處理方法分述如下鉆孔樁施工中如出現(xiàn)下列現(xiàn)象即可判定為坍孔:a、孔內(nèi)水位突然下降,孔口冒細(xì)密的水泡。下鋼筋籠,為此可設(shè)置防護(hù)三角形加勁板或設(shè)置錐形法蘭護(hù)罩;導(dǎo)管適用前應(yīng)試拼裝、施壓,.使用的隔水栓應(yīng)有良好的隔水性能,保證順利排出。吸泥法清孔用吸泥機(jī)或簡(jiǎn)易吸泥機(jī)進(jìn)行,清孔時(shí)由風(fēng)管將高壓空氣輸進(jìn)排泥管使泥漿形成密度較小的泥漿空氣混合物,在水柱壓力下將泥漿和孔底沉渣排出,同時(shí)向孔徑內(nèi)注水,保持孔內(nèi)水位不變,直至噴出的泥漿指標(biāo)符合規(guī)定時(shí)為止,此法適用于不宜坍塌的柱樁和摩擦樁清孔。在溢水過(guò)程中孔內(nèi)的泥漿密度逐漸降低,達(dá)到所要求的標(biāo)準(zhǔn)后停止。抽渣法用抽渣筒掏出孔底沉渣,清孔時(shí)應(yīng)邊抽邊加水,保持一定的水頭高度?,F(xiàn)行規(guī)范規(guī)定,沉渣的容許厚度為:摩擦樁≤30cm,柱樁≤10cm。同時(shí)隨間歇時(shí)間的增加,后兩部分泥渣還會(huì)繼續(xù)沉淀,從而使孔底積成一層沉渣,降低樁的承載力。在清孔過(guò)程中,應(yīng)不斷置換泥漿,直至澆筑水下混凝土;澆筑混凝土前,;含沙率≤8%,粘度≤28%;在容易產(chǎn)生泥漿滲漏的土層中應(yīng)采取維持孔壁穩(wěn)定的措施。拌制泥漿應(yīng)根據(jù)施工機(jī)械、工藝及穿越土層進(jìn)行配合比設(shè)計(jì)。除能自行造漿的土層外,均應(yīng)制備泥漿。而是否設(shè)置為質(zhì)量控制點(diǎn),主要是看它對(duì)質(zhì)量特性的影響程度、危害大小以及它的質(zhì)量保證的難度大小。在樁基施工中,通過(guò)事前對(duì)施工過(guò)程進(jìn)行分析,明確其中的關(guān)鍵部位和薄弱環(huán)節(jié),確定重點(diǎn)控制對(duì)象,將其設(shè)置為質(zhì)量控制對(duì)象的不同確定將要采取的預(yù)控對(duì)策,并在施工過(guò)程中嚴(yán)格執(zhí)行,同時(shí)嚴(yán)格按照規(guī)范和規(guī)程施工,以實(shí)現(xiàn)鉆孔灌注樁施工質(zhì)量的主動(dòng)控制。50mm.質(zhì)量控制點(diǎn)是在施工過(guò)程中為了保證工程質(zhì)量而確定的重點(diǎn)控制對(duì)象、關(guān)鍵部位或薄弱環(huán)節(jié)。應(yīng)視設(shè)計(jì)要求和工程的具體情況確定。終壓:1)正式壓樁前,應(yīng)按所選樁機(jī)型號(hào)對(duì)管樁進(jìn)行試壓,以確定壓樁的終壓技術(shù)參數(shù)。焊縫應(yīng)飽滿(mǎn)連續(xù),焊接部分不得有咬邊、焊瘤、夾渣、氣孔、裂縫、漏焊等外觀缺陷,焊縫加強(qiáng)層寬度及高度均應(yīng)大于2mm。施焊時(shí),宜先在坡口周邊先行對(duì)稱(chēng)點(diǎn)焊46點(diǎn),再分層施焊,施焊宜由兩個(gè)焊工對(duì)稱(chēng)進(jìn)行。3)為保證接樁的焊接質(zhì)量,電焊條用E43,應(yīng)具有出廠合格證。接樁:1)接樁時(shí)上下節(jié)樁段應(yīng)保持順直,錯(cuò)位偏差不應(yīng)大于2mm。9)管樁的垂直度偏差應(yīng)不大于1%。截除應(yīng)采用鋸樁器截割,嚴(yán)禁用大錘橫向敲擊或扳拉截?cái)唷?)按設(shè)計(jì)要求或施工組織設(shè)計(jì),在管樁施工前,宜在場(chǎng)地上先行施工砂袋樁,袋裝砂井施工完成后進(jìn)行管樁施壓,不得交叉作業(yè)。5%以?xún)?nèi)。4)在壓樁過(guò)程中,應(yīng)隨時(shí)檢查壓樁壓力、壓入深度,當(dāng)壓力表讀數(shù)突然上升或下降時(shí),應(yīng)停機(jī)對(duì)照地質(zhì)資料進(jìn)行分析,查明是否碰到障礙物或產(chǎn)生斷樁等情況。3)合理調(diào)配管節(jié)長(zhǎng)度,盡量避免接樁時(shí)樁尖處于或接近硬持力層。2)壓好第1節(jié)樁至關(guān)重要。一般說(shuō)來(lái),應(yīng)注意