【正文】
excluding system erection, debugging expenses, the costs of relevant assistant projects such as fundamentals of civil engineering, power distribution, firefighting, heat ventilation, drainage, lighting, weather shed the engineers are needed for guidance of the erection and debugging, the buyer shall pay the roundtrip tickets of the engineers, acmodation and technical services fees of 250USD day/)The load capacity for all above ground levels, and for all pit levels, all go through plates with cable reels3)Nameplate: No any Logo on the Products4)Colour to be Hsiang Gu standard colour5)Swipe cards included for all )Gate controls have to be integrated by Hsiang Gu into the board for the )All packing lists are to have the weights of each item )Hsiang Gu need to supply the necessary covers for motor chains or any other exposedmoving parts which are a safety risk to )Photos of the ma