【正文】
We hearby submit the main management staff/special profession/special work staff namelist and their qualification certificates for verification. If any adjustments during construction the form will be rectified and resubmitted. 附件:相關(guān)資格證件 Encl.: relevant quality certificates. 承包單位(章): Contractor(stamp): 項(xiàng)目經(jīng)理: Project manager: 日 期: Date: 姓名 name 崗位 /工種 Post/profession 證件名稱 Certificate name 證件編號(hào) Certificate no. 發(fā)證單位 Issued by 有效期 Expiry date 項(xiàng)目監(jiān)理 機(jī)構(gòu) 審查意見: Supervision anization’s verification: 項(xiàng)目監(jiān)理 機(jī)構(gòu) (章): Supervision anization(stamp): 專業(yè) 監(jiān)理工程師: Specialty supervision engineer: 日 期: Date: 填 報(bào) 說(shuō)明 : 本表一式 份,由承包單位填報(bào),建設(shè) 單位、 項(xiàng)目監(jiān)理機(jī)構(gòu)、 承包單位各一份。 ? Laboratory’s certificate.(certification level、 test scope、 experiment instruments’ measuringinspection certificate issued by authorized measuring anization) (資質(zhì)等級(jí)、試驗(yàn)范圍、法定計(jì)量部門對(duì)試驗(yàn)設(shè)備出具的計(jì)量檢定證明) ? 供貨商的資質(zhì)證明文件。 Filling note: 1. This table is of sets, the table shall be filled by Contractor. The employer、 supervision anization and contractor each one set. 2. in case no subcontract, the contractor’s confirmation still needed. 表 單位資質(zhì)報(bào)審表 Table anization’s certification verification form (試驗(yàn)檢測(cè)單位 /主 要 材 料 、 構(gòu) 配 件 及 設(shè) 備 供 貨 商 ) (experiment anization/major material、 steel structureamp。 After investigation, we believe pany (subcontractor) are certified and qualified for the following project, construction as per contract can be assured. However, we still bear the whole responsibilities for the whole project after subcontract. Please kindly verify. 附: 分包單位資質(zhì)材料。 Filling note: This table is of sets, the table shall be filled by Contractor. The employer、 supervision anization and contractor each one set. Special construction technical scheme shall be approved by Contractor’s chief engineer。 附 件 : 施工組織設(shè)計(jì) ( 項(xiàng)目管理實(shí)施規(guī)劃 ) We have finished the construction management plan pilation of Project, the same has been approved by our technical incharge, please kindly verify the same. 承包單位(章): Contractor(stamp): 項(xiàng) 目經(jīng)理: Project manager: 日 期: Date: 專業(yè)監(jiān)理工程師 審查意見: specialty supervision engineer’s verification: 專業(yè)監(jiān)理工程師: Specialty supervision engineer: 日 期: Date: 總監(jiān)理工程師審核意見: chief supervision engineer’s verification: 項(xiàng)目監(jiān)理機(jī)構(gòu) (章): Supervision anization(stamp): 總監(jiān)理工程師 : Chief supervision engineer: 日 期: Date: 建設(shè)單位審批意見: employer’s verification: 建設(shè)管理單位(章): Employer(stamp): 項(xiàng)目 代表 : Project representa