【正文】
No smoking and alcohol during working period.6) 施工前做好技術(shù)交底和安全交底,對工人講明工作中的安全注意事項(xiàng),并做好 JHA。To implement certified operating system, special types of work must have a permit to operate. Those without certificate are not allowed to enter site, records must be made. Continuously improve the working conditions and keep the safety measures for each worker.3) 所有工作機(jī)具都經(jīng)過業(yè)主驗(yàn)收合格后,貼上標(biāo)簽,方可使用。Alignment measure map十三. 安全生產(chǎn)、文明施工要求和措施 Safety and Civilized Construction Requests and Measures 1) 堅(jiān)持貫徹國家勞動(dòng)法規(guī)政策和公司現(xiàn)行安全規(guī)章制度,采取切實(shí)可行的預(yù)防措施,杜絕安全事故發(fā)生,進(jìn)入施工現(xiàn)場必須統(tǒng)一著裝,正確使用個(gè)人勞保用品(勞保鞋、保護(hù)眼睛、手套、安全帽) 。 Install doors and windows and lock on cable both ends, to prevent loss or damage.十二. 質(zhì)量記錄 Quality Record 質(zhì)量保證資料 Quality Assurance Information 1) 電纜產(chǎn)品合格證 Cable product certification2) 電纜絕緣搖測記錄或耐壓試驗(yàn)記錄 Cable insulation test rolling or voltage withstand records14 / 143) 隱蔽工程驗(yàn)收記錄 Concealed project acceptance 施工記錄 Construction of Record1) 自互檢記錄。如已提前將電纜敷設(shè)完,其它地下工程施工時(shí),應(yīng)加強(qiáng)巡視。應(yīng)嚴(yán)格按規(guī)范和工藝要求施工。 take protection flame proof, heat insulation and corrosion matures.2) 電纜的埋置深度應(yīng)符合下列要求:①電纜表面距地面的距離不應(yīng)小于 ,且電纜應(yīng)埋在凍土層以下。Test Method: Check test records.2) 電纜敷設(shè)必須符合以下規(guī)定:電纜嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺損,直埋敷設(shè)時(shí),嚴(yán)禁在管道上面或下面平行敷設(shè)。The signs should indicate cable numbers, specifications, models and voltage level. 3) 直埋電纜進(jìn)出建筑物及電纜終端頭應(yīng)掛標(biāo)志牌。電纜直線段每隔 50100m處應(yīng)加設(shè)間距適當(dāng)?shù)穆窂綐?biāo)樁。Ask construction unit, supervision and quality supervision departments accept concealed project, make records and do the signature. 2) 電纜上面與電纜下面一樣,覆蓋 10cm 砂土或軟土,然后用磚或電纜蓋板將電纜蓋好,覆蓋寬度應(yīng)超過電纜兩側(cè) 5cm。同一電纜溝內(nèi)敷設(shè)的不同回路的電纜中心間距為 20cm。Make temporary signs at both ends of cables. Identify cable loop and yellow, green, red phases. 電纜敷設(shè)、固定 Cable Laying and Fixing 1)電纜彎曲半徑應(yīng)符合規(guī)范要求,在溝內(nèi)敷設(shè)應(yīng)有適當(dāng)?shù)纳咝螐?,電纜的兩端、中間接頭、穿管處、垂直位差處均應(yīng)留有適當(dāng)?shù)挠嘧?。Pull cable from the upper plate to avoid friction on the ground. Armored cable may not be crushed. Do not have cable twisted, retaining layer fracture and other not eliminated mechanical damage. 4)人員合理配備。 L is cable length (m) 實(shí)際施工中,考慮實(shí)際情況,μ 取 ,R 1 取 ,R2 取 , R3 取 The actual construction should consider actual circumstances, μ takes , R1 takes , R2 takes , R3 takes 35KV W1=8900kg/m3*300*106m2*1m+=11 / 1410KV W2=8900kg/m3*95*3*106m2*1m+=W3=8900kg/m3*185*3*106m2*1m+= 令 T1=F1=2100N,則 L1=2100/(**)=428mT2=F2=2850N,則 L2=2850/(**)=600mT3=F3=5550N,則 L3=5550/(**)=733mP1=2100/=4200N P2=2850/=2192NP3=5550/=3700N 所以,采用塑料護(hù)套直接拉動(dòng)電纜時(shí),35KV 電纜每次允許拉 428m 電纜,其側(cè)壓力為4200N;10KV 95mm 2 的電纜每次允許拉 600m,其側(cè)壓力為 2192N;10KV 185mm2 的電纜每次允許拉 733m,其側(cè)壓力為 3700N。當(dāng)采用機(jī)械牽引時(shí),用機(jī)械的最大牽引強(qiáng)度宜滿足下表的規(guī)定,其速度不宜超過 15m/min,且應(yīng)在牽引頭或鋼絲網(wǎng)套與牽引鋼纜之間裝設(shè)防捻器。Select a proper setup place as per convenient to pave. Generally place it near the start or end point of cable. Be aware of rolling direction of cable axle, and keep payoffrack steady. Cable rack should be placed securely, and the steel shaft intensity and length should match the cable tray weight and width. Check and debug the cable laying and have reliable brake devices 卷揚(yáng)機(jī)與滑輪的布置 Winch and Pulley Arrangement在線路的另一端布置好卷揚(yáng)機(jī),并準(zhǔn)備好滑輪,約 ~2m 布置一個(gè)平面滑輪,每個(gè)轉(zhuǎn)角布置一個(gè)轉(zhuǎn)角滑輪,并每隔 20~30m 安排一個(gè)工人看護(hù)。Use truck or crane to transport cables. Roll cableaxis according to direction indicated by arrow sign on it. In Longdistance transportation, use truck or crane to transport heavy cable trays. If without the arrow sign, roll it according to its wrapping direction.2) 電纜支架的架設(shè)地點(diǎn)應(yīng)選好,以敷設(shè)方便為準(zhǔn),一般應(yīng)在電纜起止點(diǎn)附近為宜。Site clean up the roads unimpeded放電纜用的設(shè)備安置完畢,且符合安全要求,電纜沿線照明照度滿足施工要求。 Winches, bracket and shaft for cable laying, cable roller, transfer guide wheel, hanging chain, pulleys, wire rope, large hemp rope, jacks. 絕緣搖表、皮尺、鋼鋸、電纜端接線工具、手錘、扳手、電氣焊工具、電工工具、彎管機(jī)、砂輪機(jī)、電纜走向牌打印機(jī)、電纜號牌機(jī)、噴燈。 When cable testing is pleted, cover it with rubber materials immediately. 5) 按設(shè)計(jì)和實(shí)際路徑計(jì)算每根電纜的長度,合理安排每盤電纜,無電纜接頭。電纜外皮及絕緣展無老化及裂紋。Construction workers have prehensive understanding antecedents, destination, and laying path of laying cables. 材料準(zhǔn)備 Material Preparation1) 所有材料規(guī)格型號及電壓等級應(yīng)符合設(shè)計(jì)要求,并有產(chǎn)品合格證。Based on full study on construction characteristics and objective situation and bined with similar construction experience.3)在本方案編制過程中,嚴(yán)格執(zhí)行國家現(xiàn)行建筑和安裝工程施工及驗(yàn)收規(guī)范、規(guī)程、標(biāo)準(zhǔn)、設(shè)計(jì)規(guī)范。The current signal installed on motor in the HCL devices site passes through a buried armored control cable direct access to 10KV switchgear.由變壓器出線柜去 C581 以外的變壓器,采用兩根分別為 10*、4* 2 屏蔽鎧裝控制電纜,由中壓轉(zhuǎn)接柜引出,與中壓電纜同路徑敷設(shè)至相關(guān)變壓器室。10 10kV lines led from C581 are used to supply power to A50739?;芈凡捎?10kV 截面為95mm2 的三芯鎧裝電纜,由 B301S 南面現(xiàn)有的電纜井引出直埋至裝置。去 C581 的兩路 35kV 線路,敷設(shè)時(shí)沿不同路徑,以避免兩回線路同時(shí)受損。Project name: TDI Train Plant Medium Voltage Cable Pulling Work.3 / 14本工程涉及三個(gè)變電站,分別是現(xiàn)有的 220/35kV A472 變電站、現(xiàn)有的 35/10kV B301S 變電站以及新建的 35/10kV C581 變電站,工作內(nèi)容為三個(gè)變電站之間和從三個(gè)變電站接至 MV 用戶的電力電纜、控制電纜、接地電纜的敷設(shè)。The project involves three substations, namely the existing 220/35kV A472 substation, the existing 35/10kV B301S the 35/10kV C58