freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

中國潛水打撈行業(yè)協(xié)會沉船打撈標準合同--中英文(留存版)

2024-11-16 23:40上一頁面

下一頁面
  

【正文】 reasonably promised arising from injury or death occurring during the services hereunder to any of the following persons:any servant or agent of the pany any other person at or near the site of the operations for whatever purpose on behalf or at the request of the pany.13.2.1 Neither the pany nor its servants or agents shall have any liability to the Contractor for loss or damage of whatsoever nature sustained by the Contractor39。否那么將會失去本合同下的索賠權利和訴訟權利。12.擔保 應在簽署本合同時以雙方協(xié)商同意的形式和數(shù)額提供不可取消和無條件的擔保。 船舶交付地點對打撈方自有或者租用的船艇以及船舶的進入和操作應該是平安的并且應該是打撈方經或者相關當允許交付或者處置船舶的地方。5. 4 在合同履行前或履行間假設船舶或者作業(yè)工地的位置情況發(fā)生重大變化導致原打撈方案見附件2〕無法施行打撈方有權變更方案但打撈方應將方案的變更情況書面。本合同下所有應向打撈方支付的費用應該沒有任何折扣、扣除、抵銷、留置、索賠或者反索賠。3.價格和支付條款3.1 打撈總承包價大小寫〕: 3. 2 延誤費率: 元/天3.3 支付方式:第一 第二 第三 第四 3.4 所有向打撈方支付的款項應按照以下約定的銀行帳戶和貨幣進展支付:行: 名: 帳: 貨幣 : 3. 5總承包價的每付款都應按本合同約定在合理限內完全并不可撤銷地由打撈方獲得。在提交仲裁的過程中打撈方應繼續(xù)提供本合同下的效勞同時保存其對額外費用的索賠權。10.船舶交付10.1 交船地點: 10. 2 或其授權代表應當在收到打撈方的書面交船后 小時內在交船地點承受并且接收船舶。 假設以上費用實際上已經由打撈方或者打撈方代表進展了支付在收到打撈方時應根據打撈方實際發(fā)生的費用補償給打撈方。訴訟應當在向被索賠方提出索賠懇求的一年內提出。 11.5 all costs incurred due to requirements of governmental or other authorities over and above those costs whi would otherwise be reasonably incurred by the Contractor in the execution of the Agreement。應支付的最低租金寫明租金天數(shù)〕: 天。s owned or hiredin craft。打撈方或應充當上述人員、實體和船舶的代理人或受托人并代表他們的利益但目的僅限于為了將利益擴大給上述人員、實體和船舶。11.額外費用 以下所有的費用/本錢當其到時應該由支付:11.1所有港口費用、引航費用、港務和運河費以及對打撈方擁有或者租用的船艇進展征收或者應支付的所有其他相似性質的費用。終止時應支付 的終止合同費用。此情況下打撈方有權根據本合同的規(guī)定在終止時獲得全部應得費用。2.效勞打撈方同意在履行合同時做到應有的慎重并盡量在0條規(guī)定的地點交付或處置船舶。但是打撈方對其行使救濟權利應至少提早3個工作日。6.3在獲得同意 (不得不合理地回絕)并征得主當?shù)娜菰S的情況下假設打撈方認為是為完成合同目的所合理必須的打撈方有權從船舶上移除、處置或者拋棄貨物、船舶部件或設備。 應按照第3條規(guī)定的延誤費率并根據此款所使用的額外時間對打撈方予以補償并應對打撈方在此款規(guī)定下發(fā)生的任何額外費用負責。13.1.2在履行合同間由于以下人員傷亡所裁定應負責任或經過合理調解的索賠打撈方應保障不受損害:———打撈方的效勞人員或其代理人;———代表打撈方或應打撈方的懇求不何種目的處在或靠近作業(yè)工地的其別人員。s Method of Work shall be as described in Annex II, utilising the Personnel, Craft and Equipment described in Annex I.3. Price and Conditions of Payment3.1 Lump Sum Price (in figures and s): 3.2 Delay Payment Rate: 3.3 Payments:1st Installment 2nd Installment 3rd Installment 4th Installment 3.4 All payments to the Contractor shall be made in the currency and to the bank account stipulated hereunder.Bank: Account Name: Account Number: Currency: 3. 5 Ea installment of the lump sum shall be fully and irrevocably earned at the moment it is due as set out in this Clause. All monies due and payable to the Contractor under this Agreement shall be paid without any discount, deduction, setoff, lien, claim or counterclaim.3.6 The Contractor shall promptly invoice the pany for all sums payable under this Agreement. If any sums whi bee due and payable are not actually received by the Contractor within 3 banking days after due, they shall attract interest at annual rate of ______.3.7 If any amount payable under this Agreement has not been paid within seven (7) days of the due date, or if the security required in accordance with Clause 12 is not provided within five (5) banking days following the request by the Contractor, then at any time thereafter the Contractor shall be entitled to terminate this Agreement without prejudice to the sums already due to the Contractor and to any further rights or remedies whi the Contractor may have against the pany. Provided always that the Contractor shall give the pany at least three (3) working days notice of its intention to exercise this right.4. pany Representative If reasonably required by the Contractor a representative of the pany will be available during the operations with the full authority to act on behalf of the pany. The pany will use its best endeavours to provide all information required by the Contractor.In addition, the pany will provide at its sole risk and expense sufficient officers or their equivalents, who are fully conversant with the cargo system and layout of the Vessel, and who should be in attendance when reasonably required during the operations in order to provide advice as and when requested by the Contractor.5. ange of Method of Work and/or Personnel, Craft and Equipment5.1 The Contractor shall forthwith give notice in writing thereof to the pany and of the estimated additional costs to effect the services, if before or during performance of this Agreement, , there is a substantial ange in the work to be done under this Agreement, or in the Personnel, Craft and Equipment required to undertake the services due toprovided always that su anges are not caused by fault on the part of the Contractor〕:5.1.1 any error in the information or specification on whi the Contractor has relied caused by the neglect of the pany.
點擊復制文檔內容
公司管理相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1