【正文】
,也是作為PM的驕傲,當(dāng)然我們本來就是家里的寶貝嘛/ 2第四篇:PM PE 項目管理 項目工程師英文簡歷自我介紹My name is ***.I e from ******* graduated from ***University of **** in June specialty is *****.In one’s life, I think, impossible is I do something I will do it , I am the project engineer in ************** 1)Be responsible for project(Keypad,lens, Decofilm and so on)review, including the technology and structure review, I will be charged of the sample arrangements, track, and resolve the problem,until the project in mass production,the tooling: plastic toolingTPT tooling and theassembledjigtooling,thetechnologyhasinjection,hard coating,printing,spray,laser cutting ,CNC,TPT,hot melting and so on 2)The sample schedule confirmed, dealing with the quality issue and customer plain ,Work out the SOP,BOM、APQP、PPAP、ECN report which is related to the project(also in English), 3)Hold on the meetings about the project plan,customer plaining,pilot run,the massproduction ,dealing with about the process unusual and product I am the product engineer in *********Be responsible for the project management, including the tooling and the jig, from the sample making to mass production, working out the Flow chat、SOP、PPAP ,etcMy advantage I think I am honest ,serious,and work hard , When I do something I will do it disadvantage I think , cannot leave a job halfdone and usually find myself thinking of possible solutions to problems while I am driving to work or in the also know I spend too much time in my work., I can39。捷為項目管理系統(tǒng)能夠在項目實施過程中根據(jù)實際情況動態(tài)對資源分配做成調(diào)整,修改項目計劃。現(xiàn)在我要考慮的是,如果存在這樣的無為的項目管理方式,需要怎樣的條件去實現(xiàn)?最少應(yīng)該是在項目的各個參與方都按照項目的特點和項目管理的規(guī)則在工作,在我鄙陋的想象中,中國國情下的今天,還是很難想象這樣美妙的場景的。當(dāng)我們立足現(xiàn)實展望理想化的項目管理時,有很大的一條鴻溝橫亙在兩者之間。目標(biāo)管理思想 任何管理都含有目標(biāo)管理內(nèi)容,所有的活動都是為了實現(xiàn)這個目標(biāo)。t get enough leisure time.”Advantages: get along well with others, open, polite to people, work : easy to forget things, stubborn, rush and sometimes less correct shortings: so