【正文】
. Since April 1981, attorneys Joseph Z. Fleming, Joseph W. Landers, marine biologist Dr. Anitra Thorhaug, ornithologists Dr. Oscar Owre and Meri Cummings, mammal expert Dr. Daniel Odell, marine engineer John Michel, 4 consulting engineers, and buildercontractor, Ted Dougherty of A and H Builders, Inc. had been working on the preparation of the Surrounded Islands. The marine and land crews picked up debris from the eleven islands, putting refuse in bags and carting it away after they had removed some forty tons of varied garbage: refrigerator doors, tires, kitchen sinks, mattresses and an abandoned boat. From November 1982 until April 1983, 6,500,000 square feet of woven polypropylene fabric were sewn at the rented Hialeah factory, into 79 different patterns to follow the contours of the 11 islands. A flotation strip was sewn in each seam. At the Opa Locka Blimp Hangar, the sewn sections were accordion folded to ease the unfurling on the water. The outer edge of the floating fabric was attached to a centimeter (12 inch) diameter octagonal boom, in sections, of the same color as the fabric. The boom was connected to the radial anchor lines which extended from the anchors at the island to the 610 specially made anchors, spaced at meter (50 foot) intervals, 76 meters (250 feet) beyond the perimeter of each island, driven into the limestone at the bottom of the Bay. Earth anchors were driven into the land, near the foot of the trees, to secure the inland edge of the fabric, covering the surface of the beach and disappearing under the vegetation. The floating rafts of fabric and booms, varying from to meters (12 to 22 feet) in width and from 122 to 183 meters (400 to 600 feet) in length were towed through the Bay to each island. There were 11 islands, but on two occasions, two islands were surrounded together as one configuration. As with Christo and JeanneClaude39。6 in their exercisebooks. 。, Berlin 197195 After a struggle spanning through the Seventies, Eighties and Niies, the wrapping of the Reichstag was pleted on June 24th, 1995 by a work force of 90 professional climbers and 120 installation workers. The Reichstag remained wrapped for 14 days and all materials were recycled. Ten panies in Germany started in September 1994 to manufacture all the various materials according to the specifications of the engineers. During the months of April, May and June 1995, iron workers installed the steel structures on the towers, the roof, the statues an