【正文】
式中: )(.?cQ ) —— 設(shè)備和用具顯熱形成的冷負(fù)荷, W; SQ. —— 設(shè)備和用具的實(shí)際顯熱散熱量, W; CLQ —— 設(shè)備和 用具顯熱散熱冷負(fù)荷系數(shù),如果空調(diào)系統(tǒng)不連續(xù)運(yùn)行,則 CLQ= 電子設(shè)備: ηη )( /11000 321. ?? NnnnQ s ( 422) 式中: N —— 電動(dòng)設(shè)備的安裝功率, kW; iK —— 內(nèi)圍護(hù)結(jié)構(gòu)的傳熱系數(shù), CmW ??2 ; ? —— 電動(dòng)機(jī)效率; 1n n—— 利用系數(shù),是電動(dòng)機(jī)最大實(shí)效功率與安裝功率之比,一般可取 ~,可用于反映安裝功率的利用程度; 2n —— 電動(dòng)機(jī)負(fù)荷系數(shù),定義為電動(dòng)機(jī)每小時(shí)平均實(shí)耗功率與機(jī)器設(shè)計(jì)最大 實(shí)耗功率之比,對計(jì)算機(jī)可取 ,一般儀表取 ~ ; 3n —— 同時(shí)使用系數(shù),定義為室內(nèi)電動(dòng)機(jī)同時(shí)使用的安裝功率與總安裝功率之比,一般取 ~ 。 集中式全空氣系統(tǒng)有以下優(yōu)缺點(diǎn) ( 1)過濾段較多,能進(jìn)行多級過濾,空氣除濕能力和空氣過濾能力高,能實(shí)現(xiàn)高品質(zhì)室內(nèi)空氣處理; ( 2)送風(fēng)量大,因而換氣次數(shù)較高,室內(nèi)空氣污染物過濾較徹底; ( 3)在春秋過渡季節(jié)當(dāng)外界溫度低于室溫要求時(shí)可不用開啟冷凍機(jī),把回風(fēng)外排實(shí)現(xiàn)全新風(fēng)運(yùn)行,節(jié)約運(yùn)行能耗; ( 4) 空氣處理機(jī)組置于專用機(jī)房內(nèi),較容易調(diào)節(jié)和維護(hù),能進(jìn)行完全的空氣過濾; ( 5)風(fēng)道尺寸較大,占用空間大,初期設(shè)備的投入成本較高; ( 6)空氣處理機(jī)組體積較大,一般占用機(jī)房,需在建筑物內(nèi)選擇合適機(jī)房位置; ( 7)采用上回風(fēng)方式對冬季氣流組織不利,熱空氣不易下降,造成制熱效果不好。在各類建筑中,大量采用先進(jìn)設(shè)備和相應(yīng)配套設(shè)備組成的中央空調(diào)系統(tǒng)已成為現(xiàn)代化建筑的一個(gè)重要標(biāo)志。冷熱源方面, 考慮建筑物類型及本地建筑要求,采用冷水機(jī)房來供給冷水,冬天供暖采用市政管網(wǎng)提供熱水作為熱源,經(jīng)濟(jì)而環(huán)保。/k) 1. 63 3 系統(tǒng)形式選擇 空調(diào)形式選擇 本設(shè)計(jì)為 賓館類建筑 的空調(diào)系統(tǒng)設(shè)計(jì), 對于其特定用途, 選定系統(tǒng) 時(shí) 應(yīng) 考慮 檔次和舒適性 的要求,按 承擔(dān) 室內(nèi) 冷熱 負(fù)荷所用的介質(zhì) 不同 來分可 分為 四種系統(tǒng) —— 全空氣系統(tǒng)、空氣 — 水系統(tǒng)、全水系統(tǒng)、冷劑系統(tǒng)。供水管根據(jù)房間負(fù)荷要求向房間提 供冷凍水或熱水。 圖 新風(fēng)不承擔(dān)室內(nèi)負(fù)荷方案圖 以 [1001]會(huì)議室為例表述具體計(jì)算過程 (1) 確定室內(nèi)狀態(tài)點(diǎn) N。 因此 ,冬季房間的熱濕比常小于夏季,也可能是負(fù)值。風(fēng)機(jī)盤管有三檔風(fēng)量可供選用,我國設(shè)計(jì)人員習(xí)慣按中速參數(shù)選擇 。 ( 6) 注意出水的保溫措施,以免夏季使用時(shí)產(chǎn)生凝露,污損室內(nèi)建筑物。送風(fēng)與室內(nèi)空氣混合充分,工作區(qū)的風(fēng)速較低,溫度濕度比較均勻,適用于小空間的賓館標(biāo)間及其他要求舒適性較高的場所。 (6) 檢查貼輻射流長度 kzx ? mz )( 42 ??????? ?????? Fhk x ????x 因此, 射流長度基本滿足要求。 本設(shè)計(jì)采用天正軟件做圖紙繪制,通過繪制風(fēng)口及設(shè)置其相應(yīng)風(fēng)量后,再合理布置管道走向,然后通過設(shè)備連管連接風(fēng)管與風(fēng)口,然后通過水力計(jì)算提取系統(tǒng)風(fēng)管圖,設(shè)置合理的計(jì)算方法及設(shè)計(jì)參數(shù),即可進(jìn)行相應(yīng)水力計(jì)算 ,在繪圖里即可對計(jì)算結(jié)果進(jìn)行對原圖風(fēng)管尺寸更改,也可導(dǎo)出風(fēng)管水力計(jì)算書。 各管段局部阻力計(jì)算公式為: ? P j =∑ ζ 2v 式中:ζ — 局部阻力系數(shù); ρ — 管道內(nèi)空氣密度; v — 管道內(nèi)氣體流速。/h。 β 2—— 揚(yáng)程儲備系數(shù)取β 2=。 ζ 值與流體的性質(zhì)、流速和配件的有效通徑等因數(shù)有關(guān)。 詳細(xì)風(fēng)管水力計(jì)算見附表 3 新風(fēng)機(jī)組的選擇 新風(fēng)機(jī)組設(shè)計(jì)步驟為: 河北工業(yè)大學(xué)城市學(xué)院 2020 屆本科畢業(yè)設(shè)計(jì)說明書 第 25 頁 共 61 頁 確定機(jī)組控制區(qū)域所需新風(fēng)量與新風(fēng)冷量; 查詢樣本選擇新風(fēng)機(jī)組,其額定風(fēng)量與制冷量不得小于設(shè)計(jì)值。 因此這里用矩形風(fēng)管。 基于以上原則, 本次設(shè)計(jì)中遵循了以下原則: ( 1) 為 讓新風(fēng)與室內(nèi)回風(fēng)混合均勻 , 新風(fēng)口應(yīng)盡量靠近風(fēng)機(jī)盤管的送風(fēng)口 ; ( 2)送風(fēng)口尺寸放大。 ( 8) 機(jī)組盤管最高處設(shè)置放氣閥。 此類問題原因主要是盤管生產(chǎn)廠家設(shè)備生產(chǎn)過程中工藝性能所導(dǎo)致,樣本參數(shù)沒得到切實(shí)測試,因此要選擇品牌性能比較好的。全年年采取固定送風(fēng)量是比較方便的,只需調(diào)整送風(fēng)參數(shù)即可。 (2) 做熱濕比線。 異 程式系統(tǒng)的原由: 由于建筑物跨度較小,水里失調(diào)出現(xiàn)的可能性不是很大, 而且布置管道妥當(dāng)時(shí)耗費(fèi)管材不多 , 節(jié)約除投資。 由于賓館 建筑的房間多、層數(shù)多,全由集中 式 空調(diào)機(jī)房輸送處理后的空氣進(jìn)入建筑物去承擔(dān)室內(nèi)熱 濕 負(fù)荷 形式會(huì)引起 風(fēng)道龐大,占空間多 等弊端,對建筑物要求較高。 關(guān)鍵詞: 賓館 中央空調(diào)設(shè)計(jì) 風(fēng)機(jī)盤管加新風(fēng)系統(tǒng) 全空氣系統(tǒng) 第 3 頁 共 61 頁 畢業(yè)設(shè)計(jì)(論文)外文摘要 Title Design of air conditioning system for a hotel in Taiyuan Abstract Design of air conditioning system for 9 business hotels in this building faces south, the total construction area of square meters, of which the ground underground layer, eight layer. Underground layer of the equipment room, air conditioning, refrigeration room, garage, etc., 4m height。 Three to eight floors, etc, the height is . According to the construction of housing function and layout, buildings layer by all air system, using a return air in summer air treatment process. Two to eight layers of air fan coil with fresh air conditioning system, and the fresh air does not assume indoor load. Fresh air exchange system is used in the basement to meet the health needs.. Cold and heat sources, considering the type of buildings and local building requirements, the use of cold water room to provide cold water, winter heating the use of municipal pipe work to provide hot water as heat source, economic and environmental protection. This design mainly includes: building cooling load calculation, fan coil type selection, the central airconditioning wind, water system design, fresh air ventilation system design, pipeline insulation and noise elimination and shock absorption design, construction drawing and so on. 河北工業(yè)大學(xué)城市學(xué)院 2020 屆本科畢業(yè)設(shè)計(jì)說明書 第 4 頁 共 61 頁 Keywords: hotel Central airconditioning design Fan coil with fresh air system Air system 河北工業(yè)大學(xué)城市學(xué)院 2020 屆本科畢業(yè)設(shè)計(jì)說明書 第 5 頁 共 61 頁 目 錄 1 引言 .................................................................................................................................... 7 2 工程概況 ............................................................................................................................ 7 氣象資料 ......................................................................................................................... 7 室內(nèi)設(shè)計(jì)參數(shù) ................................................................................................................. 8 圍護(hù)結(jié)構(gòu)參數(shù) ................................................................................................................. 8 3 系統(tǒng)形式選擇 .................................................................................................................... 9 空調(diào)形式選擇 ................................................................................................................. 9 機(jī)組形式選擇 ............................................................................................................... 10 管路選擇 ....................................................................................................................... 12 4 負(fù)荷計(jì)算 .......................................................................................................................... 12 建筑圍護(hù)結(jié)構(gòu)引起的冷負(fù)荷 ....................................................................................... 12 室內(nèi)熱源散熱引起的冷負(fù)荷 ....................................................................................... 14 各層冷負(fù)荷匯總 ........................................................................................................... 15 5 空氣處理過程及送風(fēng)量的確定 ...................................................................................... 16 夏季風(fēng)量的 確定 ........................................................................................................... 16 建筑物二層及以上采用風(fēng)機(jī)盤管 +