【正文】
工程設(shè)計領(lǐng)域長期以來沒有做到這點。技術(shù)人員缺乏經(jīng)濟觀念,設(shè)計思想保守,使設(shè)計成果的經(jīng)濟性得不到充分體現(xiàn)。(3)做好工程竣工結(jié)算。工作地區(qū): 深圳項目經(jīng)驗教育經(jīng)歷2007/09 2011/06 湖南大學(xué) | 市場營銷 | 本科在校學(xué)習(xí)情況曾獲 院校級三等獎 在校實踐經(jīng)驗2008/03 2010/10 大學(xué)生英語周刊衡陽市推銷員到衡陽市區(qū)域經(jīng)理 *2008年推銷員,在學(xué)校新生開學(xué)期間向?qū)W生和家長推銷《學(xué)生英語報》*20092010年《學(xué)生英語報》衡陽地區(qū)區(qū)域經(jīng)理,負(fù)責(zé)在衡陽各高校組建團隊銷售《學(xué)生英語報》,團隊培訓(xùn),團隊維護,最后指導(dǎo)團隊銷售。通過健全法規(guī),規(guī)范行為,政企分開,建立自主經(jīng)營的合伙制、股份制、有限責(zé)任制等多種組織形式,一業(yè)為主、多種經(jīng)營服務(wù)的綜合性工程項目咨詢顧問公司,建立和發(fā)展與改革相適應(yīng)的工程造價中介服務(wù)機構(gòu),使建設(shè)項目管理逐步過渡到由一個獨立的專業(yè)化中介機構(gòu)負(fù)責(zé)對工程造價進行全過程跟蹤管理,真正在業(yè)主與承包商之間起中介作用。這種“限額設(shè)計”能有效地控制整個項目的工程造價。 while in the construction phase, through the optimization of construction organization design, construction cost saving the possibility of only 5% to 10%. We should put the focus shifted to the design stage, in order to get twice the result with half the effort.Pay attention to the technical and economic optimization bination. The bination of technology with economy is most effective way to control engineering cost. China engineering fields for a long time did not do this. The lack of technical personnel economy idea, design thought is conservative, the design of the oute of the economy are not fully reflect. Therefore, we should solve the problem is to improve economic efficiency as the goal, in the construction process, organization, technology and economy organic ground union rises. Through the economic analysis, parative study and effect evaluation, correct processing of advanced technology and reasonable in economy between the relation of unity of opposites, strive to advanced technology under the conditions of economic rational, reasonable in economy based on advanced technology.Carry out limitation is designed method. To be consciously put the application of value engineering to the specific design, actively promote quota design in engineering design contract, by way of bidding. This has been proven in practice is an effective way, it is not only an economic problem, more precisely a technical and economic problems. This limitation is designed to effectively control the project cost. In order to make the limitation