【正文】
) Rhythm FP Client Rhythm FP Client Rhythm FP Client Data Files Rhythm FP Server Rhythm FP Server Production Planner Material Planner Report Reader Production Server Whatif Server Rhythm FP Framework (Input amp。 Forecast Orders BOM Unassigned inventory Routing data Vendor Info Resource data Resource calendar data WIP data Finished Goods Part Numbers Mfg Orders Rhythm FP Planning Concept FP Planning Concept ? BTO (Buildtoorder) engine: use Demands as the driver to create plan ? Consider both material and capacity constraints at the same time ? Consider both Sales Orders and Forecasts as the demand input with different priorities ? Start as an Infinite Capacity Plan and progress to a Finite Capacity Plan FP Planning Concept (cont.) ? Materials are assigned according to the BOM explosion from the finish good level – also consider Time factors ? Raw Materials (Procured Parts) are supplied by onhand inventory or . from vendors. ? Manufactured parts (finish goods and intermediate parts) are supplied by WIP or manufacturing orders (work orders). Process Flow in FP Infinite Capacity Planning Finite Capacity Planning CAO (constraint anchor optimization) Detail Scheduling ? Identify Material and Capacity Problems ? Fix Material Problems ? Attempt to fix Capacity Problems ? Create detailed schedules FP Infinite Capacity Planning (ICP) ? Build factory model phase ? Inventory Assignment phase ? Planned start time phase ? Capacity utilization phase ? Presents plan through user interface (client) ICP Build Factory Model ? Read files into memory and create resident memory model