freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

gmgp5供方質(zhì)量過程和測量程序(專業(yè)版)

2025-03-29 11:04上一頁面

下一頁面
  

【正文】 Discrepant Parts Date Changes to FMEA will be Complete field to current system date.First labeling offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the supplier (Quantity nonconforming and estimated quantity nonconforming = 1) Major Disruptions (Spills, Downtime, Stockouts) Root Cause drop list field to the value Other.Third offense (at a particular Duns location, in last 15 months) Issuer counts all parts against the supplier. The supplier will also be placed on Controlled Shipping Level 2. Page 11Supplier TrainingChanges to GP5Quantities for Label Issues (example section )A PRR is written to a supplier for mislabeling a pallet of ten boxes of screws, each box containing 1,000 screws.If this is the supplier’s first labeling offense:Quantity Checked: 1000Quantity Nonconforming: 1Quantity Suspect: 1000Est. Quantity Nonconforming: 1If this is the supplier’s second labeling offense:Quantity Checked: 1000Quantity Nonconforming: 1Quantity Suspect: 1000Est. Quantity Nonconforming: 1If this is the supplier’s third labeling offense:Quantity Checked: 1000Quantity Nonconforming: 1000Quantity Suspect: 1000Est. Quantity Nonconforming: 1000Page 12Supplier TrainingChanges to GP5PRR Closure (section )? A PRR is considered closed after the customer has moved the PRR from an “Open or “Rejected” status to an Approved status.? A new status field is being added to GQTS.Page 13Supplier TrainingChanges to GP5Timeliness of Final Response (section )? Suppliers will be measured on the timeliness of their final response.? The following timestamps will be captu
點擊復(fù)制文檔內(nèi)容
外語相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1