【正文】
DATE 日期 PROJECT/PROGRAM 項目名稱 SUPPLIER 供應商 PART NO 零件號 MANUFACTURING LOCATION 制造場所 PART DESCRIPTION零件描述 Section 1. Customer Requirements 第一部分 顧客要求 1. Does the supplier understand the applications and intended end use of the parts/materials for all customer? 供方是否理解所有顧客的零件 、材料的 應用和最終用途 ? Yes 是 No 否 Explain:理由: 2. Does the supplier have the latest information about program timing (example: Drawing release, Prototype – series, Matching, Pilots/MVB, SOP)? Review Program Milestones with supplier 供方是否有關于項目進度的最新信息(如:圖紙發(fā)放,系列樣件,匹配,試生產(chǎn),開始正式生產(chǎn))? 與供方評審項目節(jié)點。 Total of Samples 樣品 數(shù) ________ Samples per Cavity 每個型腔樣品數(shù) ________ Total of Cavities 型腔數(shù) ________ 37. Name the GM person that you will send PPAP documentation and samples to PPAP 文件和樣件將提交給 GM 的下述人員 : 38. Will Pilot/MVB (and prepilot, if applicable) parts be produced from 100% production tools? 試生產(chǎn)樣件(包 括預試生產(chǎn),如適用)是否需要由 100%工裝生產(chǎn)? Yes 是 No 否 Explain:說明: 39. Does the supplier understand the GP12 procedure? 供應商是否理解 GP12 程序? Yes 是 No 否 Explain:說明: 40. Does the supplier understand the GP12 exit criteria? 供應商是否理解 GP12 的退出準則? Yes 是 No 否 Explain: 說明: Run Rate amp。 October 20xx 1/7 GM192714 APQP KickOff Meeting APQP 啟動會議 The purpose of this meeting is to develop a mon understanding concerning the total requirements of the part/material by assuring that proper munication and buyin occurs between GM and the supplier. This form enpasses questions from the AIAG Advanced Product Quality Planning and GM APQP Manual GM1927 manuals. Its intent is to ensure advanced product quality planning activities occur at the appropriate time and establish customer requirements for part qualification, part availability, quality, packaging, scheduling, and tooling information. Current revisions of all GM documents listed can be found in the GM Supply Power web site. 本次會議旨在建立雙方在對零件、材料的所有要求方面一致理解。 Capacity Related 與按節(jié)拍生產(chǎn)有關的問題 41. Fill in the following capacity information 填入下列能力信息 : A. What is the Daily Contracted Capacity 每日合同產(chǎn)能 October 20xx 6/7 GM192714 B. Number of tool sets required 要求的工裝套數(shù) C. Number of machines/lines/cells required 要求 的機器 /生產(chǎn)線 /生產(chǎn)區(qū)域數(shù) D. Capacity