【正文】
s. The main land character is designed for mercial office space. The general contractor of this project is Jiang Su Su Zhong Construction Group , which is one of the first batch that qualified for national enterprises of the Housing Construction quality of a contractor. This pany has right to primary signature with outside. Its industry involves housing construction, decoration, erection of the equipment, construction of classical garden, real estate development, domestic trade and overseas project etc. The pany began in February, 1949. After carring on a reform on shareholding system in December, 1998, it established as a standard limited pany approved by Jiang Su Provincial Government. II 南京工業(yè)大學(xué)本科生畢業(yè)設(shè)計(jì) (論文 ) The pany was founded under the name of Jiang Su Su Zhong Construction Group in 1999. And in October of this year, it was figured into national pilot enterprises. The conceptual master paln and architectural design is mainly aimed at the construction sections of the project of Nanjing Lian Ziying prehensive building. This project is a frame structure, which is a prehensive building with six stories above groud and three stories underground. At the beginning of the schedule and program, information about this construction must be collected and prepared. Than the design statement and the structural design are in demand. Another essential is checking through the list of drawings and descriptions carefully. The total area is approximately 20 thousand square meters. The construction covers with some dimensions, such as construction measure, earthwork, concrete works, reinforced concrete work, formwork construction, scaffold engineering, waterproof project, masonry engineering, installation work and construction anization and design etc.. Key Word: Design construction (engineering) project construction anization III 南京工業(yè)大學(xué)本科生畢業(yè)設(shè)計(jì) (論文 ) 第一章 綜合說(shuō)明 (1) 我公司是具有國(guó)家特級(jí)房屋建筑施工資質(zhì)的大型施工總承包企業(yè),是一支擁有雄厚施工技術(shù)力量和機(jī)械裝備的、富有施工經(jīng)驗(yàn)的專(zhuān)業(yè)性建筑施工隊(duì)伍。 (6) 我公司通過(guò)認(rèn)真研究招標(biāo)文件和圖紙后,對(duì)本工程的各分部分項(xiàng)工程,雨季和冬季施工,現(xiàn)場(chǎng)分階段平面布置和大型機(jī)械設(shè)備的投入使用,工程測(cè)量和檢驗(yàn)試驗(yàn),質(zhì)量保證措施,工程進(jìn)度計(jì)劃的安排和進(jìn)度計(jì)劃保證措施,確保安全、文明施工和環(huán)境保護(hù)的保證措施,對(duì)各專(zhuān)業(yè)承包商的工 程總承包管理和協(xié)調(diào),與業(yè)主、設(shè)計(jì)、監(jiān)理和政府部門(mén)的配合與協(xié)作等工程重點(diǎn)、難點(diǎn)進(jìn)行了認(rèn)真細(xì)致的方案設(shè)計(jì)論證和方案研究比選,這將是本工程施工組織設(shè)計(jì)的重點(diǎn)內(nèi)容。我們將以一流的質(zhì)量、一流的速度、一流的服務(wù)向業(yè)主交一個(gè)滿(mǎn)意的工程,以?xún)?yōu)異的業(yè)績(jī)來(lái)回報(bào)業(yè)主厚愛(ài)。 、標(biāo)準(zhǔn)、法規(guī)、規(guī)程、規(guī)范 4 南京工業(yè)大學(xué)本科生畢業(yè)設(shè)計(jì) (論文 ) 第三章 工程概況 5 第三章 工程概況 6 南京工業(yè)大學(xué)本科生畢業(yè)設(shè)計(jì) (論文 ) 7 第四章 施工部署 第四章 施工部署 ( 1)質(zhì)量目標(biāo): 工程質(zhì)量目標(biāo)達(dá)到合格標(biāo)準(zhǔn),爭(zhēng)創(chuàng)優(yōu)良,嚴(yán)格按照合同條款要求及現(xiàn)行規(guī)范標(biāo)準(zhǔn)進(jìn)行組織施工,工程一次驗(yàn)收合格率達(dá) 100%,優(yōu)良率達(dá)到 90%以上。 本工程項(xiàng)經(jīng)部組織機(jī)構(gòu)如下圖所示: 8 南京工業(yè)大學(xué)本科生畢業(yè)設(shè)計(jì) (論文 ) ( 2)項(xiàng)目部班子主要成員及各主要人員的職責(zé) ① 項(xiàng)目經(jīng)理崗位責(zé)任 a.根據(jù)工程的工期及質(zhì)量特點(diǎn)以及施工現(xiàn)場(chǎng)周邊的環(huán)境,充分發(fā)揮組織機(jī)構(gòu)和各職能人員的作用,落實(shí)質(zhì)量、安全、工期、文明施工各項(xiàng)責(zé)任制。 ,并對(duì)其工作和質(zhì)量負(fù)責(zé)。 d. 參與項(xiàng)目檢測(cè)、質(zhì)量驗(yàn)收。 c. 負(fù)責(zé)進(jìn)行分部、分項(xiàng)工程的質(zhì)量評(píng)定。 、新 工藝、新設(shè)備時(shí),制定相應(yīng)的安全技術(shù)措施。 ⑦ 施工班組崗位責(zé)任 a. 保證按規(guī)范、規(guī)程和交底文件要求執(zhí)行。 ⑥ 本公司將上述內(nèi)容作為本公司向業(yè)主的承諾,及作為項(xiàng)目經(jīng)理的工作紀(jì)律,常駐現(xiàn)場(chǎng)的保證,兢兢業(yè)業(yè),扎扎實(shí)實(shí),認(rèn)真負(fù)責(zé)完成本工程建設(shè)。提高一次成優(yōu)率,降低裝修占用比例與工程量,并留充裕的時(shí)間用于裝飾及室外工程的施工。 充分利用時(shí)間和空間的工作面,連續(xù)、均衡、有節(jié)奏地組織流水施工,實(shí)行各分部分項(xiàng)專(zhuān)業(yè)工種間的平行流水,立體交叉作業(yè)?,F(xiàn)場(chǎng)設(shè)一棟木工加工間,負(fù)責(zé)模板及配件的制作。 ③ 施工方案和施工組織設(shè)計(jì) 15 第四章 施工部署 根據(jù)施工圖紙、合同要求、規(guī)范規(guī)程及交底紀(jì)要的內(nèi)容,結(jié)合工程實(shí)際情況,盡快地編制施工方案和組織設(shè)計(jì),施工組織設(shè)計(jì)必須在工程實(shí)施前,逐級(jí)上報(bào)各級(jí)有關(guān)部門(mén),并由集團(tuán)公司總工程師審批,施工組織設(shè)計(jì)要按審批意見(jiàn)修改完善后,再次上報(bào)同意,并送交監(jiān)理、業(yè)主審閱,方可進(jìn)行施工。經(jīng)認(rèn)可后作為今后工程測(cè)量、放線(xiàn)、復(fù)核的依據(jù)。 16 南京工業(yè)大學(xué)本科生畢業(yè)設(shè)計(jì) (論文 ) ④ 組織施工機(jī)械進(jìn)場(chǎng)、安裝、調(diào)試,做好開(kāi)工前準(zhǔn)備工作。 ③ 抓緊與地方政府各有關(guān)部門(mén)接洽,疏通關(guān)系 ,辦理開(kāi)工前各項(xiàng)手續(xù),保證施工順利進(jìn)行。 ⑤ k裝飾、裝修、安裝階段采用二臺(tái)施工升降機(jī)作垂直運(yùn)輸機(jī)械。 ④ 成品及構(gòu)件 所有成品材及構(gòu)配件按編制計(jì)劃分批進(jìn)場(chǎng),甲供的構(gòu)、配件及成品,我公司負(fù)責(zé)提供計(jì)劃,并協(xié)助采運(yùn)、 裝卸、保管,同時(shí)做好成品、半成品保護(hù)工作。 ( 3)安全技術(shù)措施: ① 所有臨時(shí)施工均采用橡套電纜供電,臨時(shí)干線(xiàn)采用五蕊電纜,實(shí)行埋地的線(xiàn)纜,套管保護(hù),架空線(xiàn)跨越主要 通道時(shí),線(xiàn)纜最低點(diǎn)與地面凈高不小于 5M。 ⑨ 各供電干線(xiàn)、支線(xiàn),須在控制電器上寫(xiě)字標(biāo)識(shí)清晰。 ( 1)施工現(xiàn)場(chǎng)平面布置原則 施