freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

哈納斯變電所施工方案(完整版)

  

【正文】 r located ply with drawing, if there isn’t detailed size, it should according to the Bphase of transformer secondary outgoing cable match Bphase of MV inlet cabi. After location confirmed, fix the transformer on the support by anglesteel. 變壓器在安裝合格以后,進(jìn)行附件安裝:由于 110KV 變壓器是接線(xiàn)箱、油箱、散熱片、溫度計(jì)等附件均是分體的。 Subtransformer shape steel support of substation designed as 10 channel steel for out frame, 10 channel steel for inside, standing installation, painting and touchup after shape steel installation. 中國(guó) 第十一建設(shè)有限公司寧夏哈納斯工程項(xiàng)目部 化 學(xué) 工 程 China Eleventh Chemical Construction Company Limited NingXia Hanas Project 11 / 29 在鋼制平臺(tái)上將型鋼的平面及立面分別平整,校直,全長(zhǎng)偏差控制在 15mm 之內(nèi)(包括平面和立面)。 平臺(tái)使用前必須經(jīng)過(guò)驗(yàn)收合格,方可使用。 one is next to 110 Kv transformer on east side of substation, another one in on west side of substation, next piperack V8. Crane setup area should leveling and tamp to fit lifting. Crane setup location see DWG1 please. 吊車(chē)站位附圖 一 /DWG1(crane setup) 中國(guó) 第十一建設(shè)有限公司寧夏哈納斯工程項(xiàng)目部 化 學(xué) 工 程 China Eleventh Chemical Construction Company Limited NingXia Hanas Project 5 / 29 設(shè)備吊裝 /Lifting 吊裝施工工藝 Lifting Process 技術(shù)準(zhǔn)備→現(xiàn)場(chǎng)準(zhǔn)備及場(chǎng)地處理→設(shè)備運(yùn)輸就位→吊車(chē)達(dá)到作業(yè)條件→吊裝索具拴掛→試吊檢查及處理→吊起→設(shè)備落至道木垛→吊車(chē)摘鉤 →設(shè)備移位至安裝位臵→吊起→抽出滾杠→落下就位→吊裝完成 Technology preparation→ site preparation amp。在運(yùn)輸中車(chē)速盡量均勻,注意行車(chē)平穩(wěn),禁止急煞車(chē) DWT of trailer match the weight of HV amp。 出廠(chǎng)的有關(guān)資料及產(chǎn)品證明文件齊全。 Utility Substation 6 GIS柜 / Cabi 7 二層 /2nd Floor 立式 /vertical 110變電所 / Substation 110 中國(guó) 第十一建設(shè)有限公司寧夏哈納斯工程項(xiàng)目部 化 學(xué) 工 程 China Eleventh Chemical Construction Company Limited NingXia Hanas Project 3 / 29 4 設(shè)備的出庫(kù)及運(yùn)輸 / Equipment Handover amp。 TOOLS ................................................................25 10 勞動(dòng)力安排 /MANPOWE SCHEDULE ..........................................................................................26 11 三種吊車(chē)性能表 / MOBILE CRANE LIFTING GRAPH ....................................................................26 中國(guó) 第十一建設(shè)有限公司寧夏哈納斯工程項(xiàng)目部 化 學(xué) 工 程 China Eleventh Chemical Construction Company Limited NingXia Hanas Project 2 / 29 1 工程概況 /Project General 根據(jù) Technip 設(shè)計(jì)的哈納斯 LNG 項(xiàng)目變電所的設(shè)備布臵圖要求,在變電所安裝 110KV 變壓器 2 臺(tái),單臺(tái)質(zhì)量為 62t(除去現(xiàn)場(chǎng)組裝的附件質(zhì)量); 8 臺(tái)干式變壓器 ,2 臺(tái)自耦變壓器,最大的質(zhì)量是 8t; 153 面電氣盤(pán)柜,其質(zhì)量在 1t 以下;由于本次設(shè)備吊裝有質(zhì)量較大的設(shè)備,為保證吊裝順利進(jìn)行和設(shè)備按要求安裝,特編制此方案,以指導(dǎo) 施工。 Oil box and accessories in place, no rust and damage, seal in good condition, oil drain valve of joint between oil box and radiator don’t have leakage, oil level of oil box higher slightly than normal level. 高、中壓瓷件無(wú)損傷痕跡 ,瓷件 釉彩無(wú)撞擊脫落現(xiàn)象。 起重索具應(yīng)檢查可靠、起吊時(shí)盤(pán)柜應(yīng)使用吊裝帶兜底吊裝。 Lifting equipment and gear available and in good condition。 選用吊裝帶 / Lifting Belt Selection:吊裝帶選用 10t;安全 /Safe 設(shè)備卸車(chē) / Unload 中國(guó) 第十一建設(shè)有限公司寧夏哈納斯工程項(xiàng)目部 化 學(xué) 工 程 China Eleventh Chemical Construction Company Limited NingXia Hanas Project 8 / 29 110KV 變壓器卸車(chē) / Unload of 110Kv transformer 變壓器在吊裝前,吊車(chē)先進(jìn)場(chǎng),進(jìn)場(chǎng)前先平整場(chǎng)地,場(chǎng)地平整時(shí)達(dá)到 150T 汽車(chē)吊占車(chē)需要的地面壓實(shí)要求,吊裝場(chǎng)地應(yīng)無(wú)雜物等影響吊裝作業(yè)。 After transformer placed, due to transformer room doesn’t confined, so setup the 150t crane at the gate of transformer room, lift it and located on foundation. 機(jī) 具 、索具選用一覽表 / Lifting equipment amp。 Accessories Installation 變壓器前 吊裝 檢查變壓器的基礎(chǔ)道軌寬度與變壓器道軌寬度一致。注油完畢, 24 小時(shí)后,檢查變壓器是否有滲漏,否則需進(jìn)一步處理,正常方可進(jìn)行下道工序。接線(xiàn)箱安裝主要是保證不能碰到瓷瓶,螺栓固定牢靠。型鋼與支腿之間采用鋼板過(guò)渡,為方便運(yùn)至現(xiàn)場(chǎng),型鋼應(yīng)分段制作。 The construction quality releated building, structure to cabi installation should ply with state existing regulate of construction and acception. 屋頂、樓板施工完畢,不得滲漏。 For bined panels or over weight panel, special mobile tool shall be fabricated. 將盤(pán)柜按設(shè)計(jì)要求的順序逐臺(tái)找正,固定盤(pán)柜的緊固件應(yīng)用鍍鋅制品。 The assemblyed ponents by manufacturer can’t disassembly optionally, if necessary, the disassembly has to perform under the manufacturer guide. GIS 主 要 元 器 件安裝 / GIS main ponents installation 基準(zhǔn)間隔就位 / Basic Distance Location 以主母線(xiàn)單元為最先就位設(shè)備,按照廠(chǎng)家提供的裝箱清單及 設(shè)備安裝順序 ,將 設(shè)備 吊入110KV GIS 安裝 地點(diǎn),再進(jìn)行拼裝。2mm。檢測(cè)主母線(xiàn)對(duì)接觸頭尺寸,保證插入深度38177。 The installation and adjust introduction follow the manufacturer guide. 避雷器、電壓互感器、進(jìn)出線(xiàn)套管安裝 arrester, tension transformer, advance wire and outlet wire installation 避雷器、電壓互感器及進(jìn)出線(xiàn)套管應(yīng)在各部分安裝完成后進(jìn)行安裝。 Seal ring installation: remove seal ring protection shield, inspect surface for roughness and damage, if it damaged slightly, polish by 1000 sand paper, if damage seriously, it should change into new ponent. Use wipe paper dipping alcohol to clean surface of seal ring and seal slot. 法蘭連接螺 栓的緊固一律采用力矩扳手緊固,力矩值參考 母線(xiàn)緊固表 。 Vacuumize after replace sorbent, the procedure is: breaker air chamber degree of vacuum≤ , other air chamber≤ 1Kpa, special watchman while vacuumizing, to prevent vacuum oil flow back due to pump sudden break or operat by mistake. Hold on 4 hours, inspect leakage, if increase 1 times in 4 hours, it’s normally. After vacuummize continuing 2hours, infuse SF6 gas, water content of SF6 8mg/g. GIS 安裝檢測(cè) Installation Inspection GIS 成套組合電器作為一個(gè)整體,一旦兩端部件固定,中間的部件幾乎不可能發(fā)生獨(dú)立位移。 1kv generatrix bridge is intensive type. 空氣絕緣型母線(xiàn)橋的安裝主要是把支架安裝牢固后,把母線(xiàn)橋外殼安裝在支架上。 Prior to installation, isolation value has to qualify between phase to phase and phase to ground of each section. 中國(guó) 第十一建設(shè)有限公司寧夏哈納斯工程項(xiàng)目部 化 學(xué) 工 程 China Eleventh Chemical Construction Company Limited NingXia Hanas Project 22 / 29 母線(xiàn)橋安裝時(shí)把節(jié)與節(jié)之間的固定螺栓把緊,保證每相的 接觸面 符合設(shè)計(jì)要求,相與相之間的絕緣層的絕緣值滿(mǎn)足規(guī)范要求。 The special bolt for desi。 Generatrix Bridge installation should horizontally and vertically, error can’t beyond allowance. 密集型母線(xiàn)橋節(jié)與節(jié)之間要用專(zhuān)用接地線(xiàn)跨 接,母線(xiàn)橋兩側(cè)均要直接接地。合格后方可安裝。因此,在安裝過(guò)程中必 須適時(shí)地對(duì)產(chǎn)品質(zhì)量各安裝質(zhì)量進(jìn)行檢測(cè)檢測(cè)項(xiàng)目包括主回路電阻測(cè)量、漏氣檢測(cè)、微水檢測(cè)及主回路交流耐壓試驗(yàn)等。如果吸附劑裝入 GIS 內(nèi),又不對(duì)密封罐立即抽真空,則超過(guò) 4 小時(shí)后應(yīng)重新處理,再放入。 Arrester, tension transformer, advance wire and outlet wire installation should after each part installation finish, ensure the connect properly. 附件安裝 accessories installation 配件安裝包括各氣室的 SF6 充氣管道的安裝、氣動(dòng)操作機(jī)構(gòu)的空氣管道安裝、外殼接地及二次配線(xiàn)等。 采用定位銷(xiāo)對(duì)接主母線(xiàn)法蘭,以保證法蘭對(duì)正,緊固連接螺栓。2mm. 采用調(diào)整墊墊平底架,緊固支撐螺栓。采用吊車(chē)、鋼管、千斤頂?shù)裙C(jī)具,將所有間隔主母線(xiàn)單 元初步就位。根據(jù)設(shè)計(jì)圖紙,要求電氣盤(pán)柜和基礎(chǔ)連接采用焊接連接,焊接后噴涂防腐漆料。 Roof, floor
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報(bào)告相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1