freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

項(xiàng)目施工組織畢業(yè)設(shè)計(jì)模板(完整版)

2025-09-09 06:48上一頁面

下一頁面
  

【正文】 道→土建封管道井,砌內(nèi)隔墻→衛(wèi)生潔具的支管安裝到位→土建封洞、槽和內(nèi)粉刷→安裝浴缸→內(nèi)裝修→衛(wèi)生潔具安裝→通水檢驗(yàn)。(2)主要電氣設(shè)備材料的質(zhì)量控制:水電設(shè)備安裝工程、各種電氣設(shè)備材料的品種、規(guī)格較多,用量較大,為確保東華理工大學(xué)畢業(yè)論文 主要施工方案方法 23本工程安裝質(zhì)量,本工程對(duì)電氣安裝工程、電氣設(shè)備、材料實(shí)行統(tǒng)一管理,統(tǒng)一采購,采購的設(shè)備、材料應(yīng)提供相應(yīng)的質(zhì)保書、合格證、測(cè)試報(bào)告等技術(shù)保證資料,部分材料應(yīng)經(jīng)過當(dāng)?shù)刭|(zhì)檢部門檢測(cè)合格。(5)木門窗安裝的留縫寬度,應(yīng)符合有關(guān)標(biāo)準(zhǔn)的規(guī)定。(6)鋁合金窗選用零附件及固定件,除不銹鋼外均應(yīng)作防腐處理。平行于屋脊的搭接縫應(yīng)順流水方向搭接,垂直于屋脊的搭接縫應(yīng)順年最大頻率風(fēng)向(主導(dǎo)風(fēng)向)搭接,搭接寬度不少于 10cm。 屋面工程 不上人保溫屋面(1)本工程鋪 CNR922 橡膠防水卷材一道,15 厚 1:3 水泥砂漿找平,爐渣找坡,起坡 40,現(xiàn)澆鋼筋混凝土板。(2)彈線、定位 地磚鋪貼通常有兩種方式,分別為對(duì)角定位法磚縫與墻角成 45176。(7)鋪水泥砂漿壓頭遍:緊跟貼灰餅沖筋鋪水泥砂漿,配合比為水泥:砂=1:2,用木抹子趕鋪拍實(shí),用木尺按貼餅和沖筋標(biāo)高刮平,上木抹子搓平,等反水后略撒 1:1 干水泥砂子面, 吸水后鐵抹溜平,上述操作均在水泥砂漿初凝前進(jìn)行。遇到風(fēng)雨天氣,應(yīng)停止作業(yè),保護(hù)好成品。(5)復(fù)層涂料:這是由底層涂料、主涂層、面層涂料組成的涂層,底層涂料可采用噴、滾、刷的任一方法施工,主涂層用噴斗噴涂,噴涂花點(diǎn)的大小、疏密根據(jù)需要確定,花點(diǎn)如需要壓平時(shí),則應(yīng)在噴點(diǎn)后適時(shí)用塑料或橡膠輥蘸汽油或二甲苯壓平。 具體施工(1)外腳手先要進(jìn)行整修,腳手板上的剩余物全部清理干凈。 外墻涂料施工(1)工藝流程:清理基層→填補(bǔ)縫隙→磨砂紙→滿刮膩?zhàn)觾杀椤ス狻⒌谝槐橥苛稀鷱?fù)補(bǔ)膩?zhàn)印ス狻⒌诙橥苛稀ス狻⒌谌橥苛稀鸪_手架。(2)施工要點(diǎn):基層處理:將基層表面的灰塵、污垢和油漬等清除干凈,用瀝青麻刀將門窗框與墻的間縫填塞嚴(yán)密,并用水泥漿嵌補(bǔ)平整密實(shí),同時(shí)將腳手眼及水電暗管安裝后的孔槽分層填實(shí)補(bǔ)平,將砼基體表面洗刷或鑿毛,加氣砼墻面應(yīng)先勾縫和修補(bǔ)缺棱掉角。(5)基層用水泥砂漿面層,先將底子灰面掃毛或劃出紋道,面層注意接搓,表面壓光不少于兩遍,罩面后次日進(jìn)行灑水養(yǎng)護(hù)。(2) 質(zhì)量標(biāo)準(zhǔn) 表面光滑潔凈,顏色均勻,線角平直方正,無抹紋。每個(gè)樓層只搭設(shè)兩步,待砌完一個(gè)樓層的墻體后,再將腳手架全部翻到上一樓層。質(zhì)量目標(biāo)為:橫平豎直、砂漿飽滿、組砌得當(dāng)、接搓可靠。(3) 外腳手架隨結(jié)構(gòu)升而超前一步,外腳手架上需滿鋪腳手片,防護(hù)欄處用腳手片封閉,整個(gè)外立面用密目安全網(wǎng)封閉。5mm(5)鋼筋工程應(yīng)作為隱蔽項(xiàng)目,因此在該分項(xiàng)工程完工后,必須進(jìn)行隱蔽驗(yàn)收并做好隱蔽驗(yàn)收記錄,以備后查。表 62 鋼筋綁扎允許偏差網(wǎng)的長(zhǎng)度、寬度 177。如當(dāng)模板未支好前綁箍筋時(shí),可在焊接好的主筋上,用鋼尺按圖紙要求分好箍筋綁扎點(diǎn),并用記號(hào)筆標(biāo)出位置,而后即可進(jìn)行綁扎。(7)施工縫的留設(shè):基礎(chǔ)面,梁式板應(yīng)留在中間的三分之一處。砼澆筑時(shí)要注意連續(xù)澆筑,盡量避免留設(shè)施工縫,如無法避免,應(yīng)留在 1/3 跨至跨中。 搞好地面及地坑內(nèi)的排水措施。(2)回填土土質(zhì)必須符合規(guī)范要求(3)土方回填時(shí),基坑內(nèi)不得有積水、淤泥及有機(jī)物等雜物。墻及建筑物全高垂直誤差控制在 15mm 之內(nèi)。(2) 由于施工現(xiàn)場(chǎng)較窄,周轉(zhuǎn)材料及建筑材料應(yīng)根據(jù)施工進(jìn)度計(jì)劃有組織的進(jìn)場(chǎng)和訂購,按施工總平面圖合理堆放。門窗框扇的安裝及油漆涂料的施工應(yīng)視施工條件及時(shí)插入施工。 以上主體結(jié)構(gòu)砌筑→屋面保溫、防水→裝飾裝修及水、電、暖安裝同時(shí)進(jìn)行→門窗制作安裝→零星工程。4. 施工部署 工程目標(biāo)(1)質(zhì)量目標(biāo):優(yōu)良(2)工期目標(biāo):本工程計(jì)劃工期240日歷天。對(duì)施工總平面圖進(jìn)行動(dòng)態(tài)控制,隨項(xiàng)目施工結(jié)構(gòu)、裝飾等不同階段及時(shí)進(jìn)行核對(duì)和修改調(diào)整,使之圖實(shí)相符。(2)掌握坐標(biāo)位置、水平標(biāo)高、建筑邊界以及與相鄰建筑物,周圍管線的關(guān)系,建立工程測(cè)量控制圖。東華理工大學(xué)畢業(yè)論文 編制說明及依據(jù) 5(3)梁:25mm 且不小于 d。 屋面做法 屋面的上人屋面為剛性防水和高聚物改性瀝青卷材防水屋面;不上人屋面為高聚物改性瀝青卷材防水 結(jié)構(gòu)設(shè)計(jì)要求本工程為鋼筋混凝土框架結(jié)構(gòu),基礎(chǔ)為柱下獨(dú)立基礎(chǔ)。(3)室內(nèi)地面樓面1(衛(wèi)生間樓面) 樓面2(其余層所有樓面)均用水泥砂漿樓面。 (6)本公司現(xiàn)有的勞動(dòng)力、技術(shù)、機(jī)械設(shè)備能力和施工管理經(jīng)驗(yàn)。(1)本工程量清單編制根據(jù)業(yè)主提供的圖紙進(jìn)行編制。 safe and civilized。該擬建物的結(jié)構(gòu)為框架結(jié)構(gòu),總建筑面積 4140m2,建筑層數(shù)為 6 層,建筑高度為 ,建筑年限為 50 年。 關(guān)鍵詞:核心;施工部署; 施工方案;安全文明;優(yōu)質(zhì)工程?hào)|華理工大學(xué)畢業(yè)論文 摘要ABSTRACTThis thesis is a plan about residential buildings’ construction of Hengji Industrial Investment and Development Co., Ltd. With a total acreage of 4140 square meters, the proposed building is frame construction. It has 6 floors and the altitude is meters and the construction period is 50 years. Construction management plan is the core and soul of construction anizations. It is a design about the whole process of construction projects and specific arrangements. It is a prehended technical, economical and anizational document which used to guide the construction activities of the whole process of project. According to the needs of the project, construction management plan set up a construction management agency to specify the details of the onsite management, the overall construction of the deployment, preparation of the construction, the main subsegment of the construction methods, measures to assure the quality, safety and civilized construction measures, and construction site management measures such factors which should be full considered to highlighting science, applicability and pertinence. Construction management plan is an important economical and technical document which to ensure the acplishment of the whole construction task with highquality, low cost, safety, civilization, and high speed. Construction management plan was made to put forward reasonable proposals and measures to reduce the cost, and suggestion about safety measures and civil constructions in the construction process. Under the current construction specifications of Quantities of engineering, the construction management plan calculates the quantities. And then based on the quantities of projects, the construction management plan specify the project labor, material and mechanical consumption. In order to ensure construction duration, quality and safety, civil construction site, costsaving such conditions, this thesis design the suitable construction management plan, the features of each subpart of the project and their structural features, the ease of construction schedule and quality requirements, the preparation of a practical construction plan, construction schedule bar chart, work diagram construction, construction anization plan to guide the construction of the successful pletion of the construction of the project, control costs, create highquality project.Keywords: core。隨著社會(huì)主義市場(chǎng)經(jīng)濟(jì)的建立,建筑市場(chǎng)的競(jìng)爭(zhēng)異常激烈,一套完善的施工組織方案不僅給施工企業(yè)帶來良好的競(jìng)爭(zhēng)力,而且更有效的實(shí)現(xiàn)對(duì)工程成本、工程進(jìn)度、工程質(zhì)量這三大目標(biāo)的控制,從而增加企業(yè)效益?!吨腥A人民共和國建筑法》《建設(shè)工程質(zhì)量管理?xiàng)l例》《混凝土強(qiáng)度檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》 GBJ10787《建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范》 GB5020202《砌體工程施工質(zhì)量驗(yàn)收規(guī)范》 GB5020302《混凝土結(jié)構(gòu)施工工程質(zhì)量驗(yàn)收規(guī)范》 GB5020402《鋼筋焊接及驗(yàn)收規(guī)程》 JGJ1896《屋面工程質(zhì)量驗(yàn)收規(guī)范》 GB5020702《建筑地面工程施工質(zhì)量驗(yàn)收規(guī)范》 GB5020902《建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范》 GB5021001《建筑給水排水及采暖工程施工質(zhì)量驗(yàn)收規(guī)范》 GB502422022《建筑電氣工程施工質(zhì)量驗(yàn)收規(guī)范》 GB5030302《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》 GB503002022《建筑變形測(cè)量規(guī)程》 JG/T8897東華理工大學(xué)畢業(yè)論文 編制說明及依據(jù) 3《建設(shè)工程項(xiàng)目管理規(guī)范》 GB/T502362022《工程網(wǎng)絡(luò)計(jì)劃技術(shù)規(guī)程》 JGJ/T100199《建設(shè)工程文件歸檔整理規(guī)范》 GB5032801《工程建設(shè)標(biāo)準(zhǔn)強(qiáng)制條文》 (房屋建筑部分)《房屋建筑工程和市政基礎(chǔ)設(shè)計(jì)工程竣工驗(yàn)收備案管理暫行辦法》《房屋建筑工程質(zhì)量保修辦法》《中華人民共和國安全生產(chǎn)法》《建筑工程施工現(xiàn)場(chǎng)管理規(guī)定》《建筑安裝工程安全技術(shù)規(guī)程》《建筑施工安全檢查標(biāo)準(zhǔn)》 JGJ5999《施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范》 JGJ4688《建筑施工安全用電》《建筑機(jī)械使用安全技術(shù)規(guī)程》 JGJ3301《招標(biāo)文件》及其他相關(guān)文件,工程施工圖紙、圖紙答疑。(2)凡內(nèi)墻面,柱面的陽角和門洞口一律用1:2水泥砂漿做護(hù)角線,其高度為2米,每側(cè)寬度為50毫米。(4)頂棚:混合砂漿頂棚。(3)鋼筋直徑在 12 以下者可搭接接長(zhǎng)。(3)
點(diǎn)擊復(fù)制文檔內(nèi)容
數(shù)學(xué)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1