【正文】
r number is 17 layer, building height meters, A total construction area of square meters structure type for the frame structure,According to the field of geotechnical engineering investigation report of groundwater embedded depth of ~ meters, the groundwater has a slightly corrosive to concrete, according to the results of the survey report using caps basis, and deepen to pile foundation bearing capacity. The content of the key research is to choose an optimized scheme to achieve the effect of low cost and high ine. In this project, we will actively adopt new technologies, improve engineering technology content by scientific and technological progress, improve the quality of engineering overall, in 20xx, according to the ministry of construction to promote the application building 10 new technologies to guide the construction of the project, achieve low cost and high quality of high quality engineering. Mainly is to learn to grasp the economic, the use of a high level of construction anization design to meet this requirement. By using the basic theory of cost control, from the perspective of project managers, project whole process from start to prepare to pletion inspection and acceptance for the schedule planning and design of the system, and the use of crossing graph and the work chart to analyze schedule, in the case of ensure the quality of construction and engineering principles, to reduce the construction cost, achieve maximum economic benefits, using new technology and new process even if the cost 3 is high, but can shorten the construction period, the engineering quality is guaranteed. Key words: Construction project management。在本工程中,我們將積極采用新技術(shù), 通過科技進(jìn)步提高工程科技含量,提高工程總體質(zhì)量,根據(jù)建設(shè)部 20xx 年推廣的“建筑業(yè) 10 項(xiàng)應(yīng)用新技術(shù)”來指導(dǎo)本工程的施工,做到低成本高質(zhì)量的優(yōu)質(zhì)工程。 3)室外部分:園建綠化工 程土方回填等的鋼筋混凝土結(jié)構(gòu)施工、甲方指定的零星工程施工等 . 建筑概況 監(jiān)利縣名流嘉業(yè)陽光城 —— A 區(qū) 幢住宅,建筑層數(shù)是 17 層,建筑高度 米,總建筑面積 平方米結(jié)構(gòu)類型為框架結(jié)構(gòu),建筑結(jié)構(gòu)安全等級(jí)為二級(jí),建筑使用年限為50 年,本工程 為室內(nèi)地面標(biāo)高,相當(dāng)于絕對(duì)標(biāo)高 ,剪力墻抗震等級(jí)為三級(jí),框架抗震等級(jí)為四級(jí),本建筑物耐火等級(jí)為二級(jí)。項(xiàng)目集 4大國(guó)際商業(yè)步行街、購(gòu)物廣場(chǎng)于一體的大商業(yè)中心,大園林、大景觀、大配套的居住中心:坐擁 20xx 米最長(zhǎng)步行街, 30000 ㎡國(guó)際購(gòu)物中心, 20xx ㎡高端奢華會(huì)所, 30000 ㎡最潮流的 9 商務(wù)酒店、雙層式全業(yè)態(tài) KTV 不夜城和監(jiān)北唯一的國(guó)際雙語幼兒園,西班牙浪漫、唯美婚戀主題街,法式風(fēng)情藍(lán)調(diào)街區(qū)、英倫學(xué)院風(fēng)情藝術(shù)街、德式沉穩(wěn)建筑街區(qū)、現(xiàn)代典雅 住宅生活區(qū)五大主題商業(yè)街環(huán)繞,配套新建中學(xué)、中心小學(xué)、監(jiān)利三中等一批學(xué)區(qū)教育資源定鼎新溝。場(chǎng)地地下水位 米,場(chǎng)地土為中軟場(chǎng)地土,地下水對(duì)混凝土具有微腐蝕性。 安全文明施工目標(biāo) 項(xiàng)目安全文明管理目標(biāo)見表 。 2 項(xiàng)目管理機(jī)構(gòu)職責(zé)見下表 . 表 組織機(jī)構(gòu)人員配置 序號(hào) 部門名稱 崗位名稱 配備人數(shù)(個(gè)) 備注 1 企業(yè)保障層 項(xiàng)目總指揮長(zhǎng)(公司) 1 專家顧問組(公司) 2 2 總包管理層 總承包項(xiàng)目經(jīng) 理 1 質(zhì)量總監(jiān)、安全總監(jiān)由企業(yè)委派對(duì)項(xiàng)目進(jìn)行監(jiān)督管理,有一票否決的權(quán)利,直接由項(xiàng)目總指揮長(zhǎng)領(lǐng)導(dǎo)。 2 綠色 施工 管理 本工程場(chǎng)地 較大 ,毗鄰市政道路,綠色施 工是管理的重點(diǎn)。 3 落實(shí)現(xiàn)場(chǎng)用水用電,保證施工用水用電正常。 對(duì)一些專業(yè)工程應(yīng)根據(jù)進(jìn)度計(jì)劃的安排,提前編制專項(xiàng)方案,并通過企業(yè)技術(shù)負(fù) 責(zé)人審批,合格后報(bào)送監(jiān)理、業(yè)主工程師審批,對(duì)于特殊方案,還必須進(jìn)行專家論證。 2 周轉(zhuǎn)材料的計(jì)算 18 根據(jù)編制模板施工方案、外腳手架搭設(shè)方案計(jì)算出鋼管腳手架、鋼管、木膠板、可調(diào)頂托、木方等主要周轉(zhuǎn)料具的數(shù)量,再乘以相應(yīng)的損耗系數(shù)得出計(jì)劃量 。 2 發(fā)包人提供的用地范圍、水電接駁頭位置、周圍道路情況。洗衣房 20m178。廁所 140m178。 3 彩板房餐廳 60 m178。 12 彩板房廁所 140 m178。宿舍內(nèi)設(shè)置生活用品專柜,門口設(shè)置垃圾桶。 現(xiàn)場(chǎng)辦公區(qū)布置 1) 根據(jù)現(xiàn)有情況,辦公區(qū)設(shè)置在擬建建筑物的西側(cè)。 ( 3) 現(xiàn)場(chǎng)圍護(hù):擬建建筑物場(chǎng)地四周設(shè)不低于 (除了 東面是 6m高的廣告牌) ,表面做 CI處理。 ( 2) 模板加工場(chǎng) 模板加工按照原材→加工→半成品的加 工流程,分成模板原材存放區(qū)、模板加工成型區(qū) 23 和半成品模板存放區(qū)。擬建工程的塔吊布置主要分為地下室結(jié)構(gòu)施工階段和地上主體施工階段,并綜合考慮安全、技術(shù)、工期、經(jīng)濟(jì)等方面的因素。 、模板、鋼管等材料的垂直運(yùn)輸。 鋼筋工程施工安排 1 鋼筋的連接 本工程框架柱縱向受力鋼筋均采用滾軋直螺紋機(jī)械連接;剪力墻內(nèi)縱向受力鋼筋:對(duì)直徑≥ 20 的鋼筋采用直螺紋機(jī)械連接,對(duì)直徑≥ 14 且≤ 18 的鋼筋采用電渣壓力焊焊接,對(duì)直徑< 14 的鋼筋采用綁扎搭接;板筋直徑< 16 采用綁扎搭接 。 墻體豎筋綁扎完畢后,綁扎墻體水平鋼筋,水平鋼筋間距依據(jù)豎向定位梯子筋的梯蹬距離拉通線進(jìn)行綁扎,第一道起步筋距頂板面 50 ㎜,同時(shí)保證搭接段有三根水平筋,要求扎絲長(zhǎng)度一致,無毛刺。 ②箍筋在疊合處的彎鉤,在梁中應(yīng)交錯(cuò)綁扎,箍筋彎鉤為 135176。 ⑦所有剪力墻無連梁或框架梁時(shí)均按要求設(shè)置暗梁。 ⑥對(duì)于洞寬≤ 300 的管洞,按圖 柱縱向鋼筋接頭位置設(shè)置 加固筋保護(hù)層墊塊模板柱筋焊短鋼筋塑料墊塊1 0 00600圖 柱筋臨時(shí)斜撐加固 29 各專業(yè)圖紙?zhí)峁┑奈恢妙A(yù)留,但結(jié)構(gòu)的板筋不得截?cái)?,鋼筋應(yīng)在洞邊繞過;對(duì)于洞寬> 300的管洞結(jié)構(gòu)圖中未注明的,不得隨意預(yù)留,必須通知結(jié)構(gòu)設(shè)計(jì)人員采取有效措施,保證留洞位置的準(zhǔn)確無誤,且應(yīng)按設(shè)計(jì)要求放置加強(qiáng)鋼筋,板厚≤ 120mm,上下各 312,板厚> 120mm,上下各 3 16。水平筋按設(shè)計(jì)要求綁在豎向筋內(nèi)側(cè)。如有樓梯梁時(shí),先綁扎梁后綁板筋,板筋要錨固到梁內(nèi)。 ②焊接接頭機(jī)械性能,必須符合鋼筋焊機(jī)械連接規(guī)范的相關(guān)規(guī)定。 800mm、 400mm179。 600mm、 150mm179。 100mm 方木做擱柵,間距不大于 500mm,用鐵絲扎牢。 100mm 方木做擱柵,間距 300mm。 模板安裝的制作要求 拆平臺(tái)模及梁側(cè)模板。 33 ( 6)所有樓板內(nèi)的孔洞模必須 符合強(qiáng)制性標(biāo)準(zhǔn) ,并作加固處理,防止砼澆筑時(shí)沖動(dòng),振跑或 隨 砼的浮力而浮動(dòng)。如果因意外情況發(fā)生,可沿次梁方向留置在次梁跨度的中間 1/3 范圍內(nèi)。高度不太高時(shí)采用串筒,高度較高時(shí)利用布料桿前端的軟管伸入柱模內(nèi)進(jìn)行下料,每段高度不得超過 2m,防止混凝土離析,對(duì)于柱高超過樓層高的樓層標(biāo)高處設(shè)水平施工縫分次澆筑。 后澆帶施工方案與技術(shù)措施 后澆帶是在現(xiàn)澆鋼筋混凝土結(jié)構(gòu)施工過程中,為克服由于溫度、收縮、沉降等因素而可能產(chǎn)生的有害裂縫而設(shè)置的臨時(shí)施工縫。 3 砌筑工程施工技術(shù)要點(diǎn) 1) 砌筑前,應(yīng)將砌筑部位清理干凈,應(yīng)在砌筑位置上彈出墻邊線,以后按邊線砌筑,一道墻可先砌兩頭的磚,再拉準(zhǔn)線砌中間部分。 6) 砌塊墻的十字交接處,應(yīng)隔皮縱橫墻砌通,交接處內(nèi)角的豎縫上下 相互錯(cuò)開 1/4 磚長(zhǎng)。管線槽留置時(shí),可采用彈線定位后用鑿子鑿槽或用開槽機(jī)開槽,不得采用斬磚預(yù)留槽的方法。 4 砌塊提前一天澆水濕潤(rùn),砂漿灌縫要 飽滿,尤其立縫,施工過程中極易忽視,砂漿不飽滿,透縫、隔音效果不好,整體性差。 項(xiàng)目夜間均設(shè)專職的值班人員,保證晝夜有人值班并做好值班記錄,同時(shí)要設(shè)置 天氣預(yù)報(bào)員,負(fù)責(zé)收聽和發(fā)布天氣情況。 安排好雨期施工項(xiàng)目,不宜在雨期施工的工序,盡量避開雨天施工。 2 模板工程 1)堆放模板的場(chǎng)地要進(jìn)行硬化,排水坡度不小于 2%; 2)木料堆放應(yīng)避免日曬雨淋引起變形; 膠合板板邊四周均涂封防水油漆,耐磨性強(qiáng),表面平整光滑,不易吸水受潮變形 3)大雨、大風(fēng)后檢查模板架子扣件有無松動(dòng)滑 移、架子和模板有無變形,并對(duì)相應(yīng)的尺寸誤差重新檢查,檢查完成后要及時(shí)修復(fù)。 雨季施工原材料的儲(chǔ)存和堆放 水泥全部入庫,保證不漏、不潮,下面應(yīng)架空通風(fēng),四周設(shè)排水溝,避免積水。 檢查施工現(xiàn)場(chǎng)及生產(chǎn)生活基地的排水設(shè)施,疏通各種排水渠道,清理雨水排水口,保證雨天排水通暢。 6 樓梯間和人流通道的填充墻尚應(yīng)采用鋼絲網(wǎng)砂漿面層雙面加強(qiáng)。 2 砌體頂部與框架梁板接槎處 20~ 30mm 空隙,采用細(xì)石混凝土填實(shí),應(yīng)在墻體完成 14天后再進(jìn)行抹灰施工。對(duì)不能同時(shí)砌起而必須留槎時(shí),應(yīng)砌成斜槎,斜槎長(zhǎng)度不應(yīng)小于斜槎高度的 2/3。 2) 在砌塊墻的轉(zhuǎn)角處及交接處立起皮數(shù)桿(皮數(shù)桿間距 不超過 15m,過長(zhǎng)應(yīng)在中間加 36 立),在皮數(shù)桿之間拉準(zhǔn)線,依線逐皮砌筑,其中第一皮磚按墻身邊線砌筑。 砌體結(jié)構(gòu)及裂縫防治措施 簡(jiǎn)述 根據(jù)本工程建筑說明,采用 200 厚 蒸壓加氣混凝土砌塊 ,Mb5 水泥砂漿砌筑。 梁、板同時(shí)澆筑,澆筑方法應(yīng)由一端開始用“趕漿法”,即先澆筑梁,根據(jù)梁高分層澆筑成階梯形,當(dāng)達(dá)到板底位置時(shí)再與板的混凝土一起澆筑,隨著階梯形不斷延伸,梁板混凝土澆筑連續(xù)向前進(jìn)行。施工縫宜用木板或 鋼絲網(wǎng)擋牢。 混凝土工程 混凝土工程施工組織安排 1 商品混凝土廠家選擇 選擇具有 23 家生產(chǎn)質(zhì)量穩(wěn)定的大型拌混凝土供應(yīng)商,場(chǎng)外運(yùn)輸采用混凝土輸送車,場(chǎng)內(nèi)采用混凝土輸送泵。 項(xiàng)目 允許偏差( mm) 項(xiàng)目 允許偏差( mm) 軸線 5 底模上 表面標(biāo)高 177。 普通腳手鋼管及扣件搭設(shè)。 (1) 根據(jù)設(shè)計(jì)情況,采用定型模板,每個(gè)柱都有固定模板兩套,以保證周轉(zhuǎn)使用, 且做好標(biāo)識(shí),防止錯(cuò)用,濫用。 模板體系選擇 l、模板的選用和支模方式 ( 1)框架梁、次梁模板 梁底模、側(cè)模均采用 膠合板模板 和 50mm179。 700mm、 400mm179。 ③彎鉤的朝向應(yīng)正確,綁扎接頭應(yīng)符合施工規(guī)范的規(guī)定,搭接長(zhǎng)度不小于規(guī)定值。 ②板墻中分布鋼筋的保護(hù)層厚度不應(yīng)小于 10mm。雙排鋼筋之間按設(shè)計(jì)要求設(shè)置拉筋。 ⑧樓板短跨尺寸≥ 米及屋面板,在板面無筋部分設(shè)雙向鋼筋網(wǎng),與負(fù)筋搭接 300mm, H≤ 140mm 時(shí),鋼筋網(wǎng)為φ 6200, H> 140mm 時(shí)鋼筋網(wǎng)為φ 8200。 ②鋼筋綁扎時(shí),靠近外側(cè)兩行的相交點(diǎn)每點(diǎn)都要綁扎,中間部分的相交點(diǎn)可相隔交錯(cuò)綁扎,雙向受力的鋼筋必須將鋼筋交叉點(diǎn)全部綁扎,保證鋼筋不位移。 ③主次梁若同高時(shí),則次梁鋼筋須放于主梁之上。如圖 所示: 最后在墻體頂部加水平定位框,定位框間距與墻體豎筋間距相同。 3 鋼筋進(jìn)場(chǎng)堆放、加工及場(chǎng)內(nèi)運(yùn)輸 進(jìn)場(chǎng)鋼筋必須具備出廠質(zhì)量證明書