【正文】
泥采用 ,水灰比為 ,其流動度要適合泵送,為防止泌水、干縮和降低水灰比,可摻加 %的木質(zhì)素磺酸鈣,可考慮摻早強(qiáng)劑。對預(yù)應(yīng)力錨索 桿注漿壓力不低于 。 30 用鋼尺量 2 錨桿鎖定力 設(shè)計要求 現(xiàn)場實(shí)測 一 般 項(xiàng) 目 1 錨桿位置 mm 177。 噴射混凝土用的骨料級配宜控制在表所給的范圍內(nèi)。 /h,允許骨料最大粒徑為 25mm; ③混凝土輸料距離,水平不小于 100m,垂直不小于 30m; 2) 、選用的空壓機(jī)應(yīng)滿足噴射機(jī)工作風(fēng)壓和耗風(fēng)量的要求;當(dāng)工程需要選用單臺空壓機(jī)工作時,其排風(fēng)量不應(yīng)小于 9 m179。 4) 、采用濕法噴射時,宜備有液態(tài)速凝劑,并應(yīng)檢查速凝劑的泵送及計量裝置性能。 ④長期監(jiān)測的預(yù)應(yīng)力錨桿的預(yù)應(yīng)力值變化應(yīng)滿足規(guī)范的規(guī)定?;炷恋膹?qiáng)度等級、配合比、原材料符合設(shè)計圖紙及施工規(guī)范要求并進(jìn)行送檢試驗(yàn)合格后方能投入使用。 6)做好遮蓋防水工作,使任何應(yīng)避水的材料、產(chǎn)品、半成品免于浸泡淋濕,材料場地作好排水。風(fēng)雨過后,要對現(xiàn)場臨時設(shè)施、用電線路等進(jìn)行全面的檢查,當(dāng)確認(rèn)安全無誤后方可繼續(xù)施工。 4) 、正式測量施工前,應(yīng)對提供的測量控制圖中的各施工控制點(diǎn)位及高程進(jìn)行復(fù)核,準(zhǔn)確無誤后才能進(jìn)行下一步施工。 5) 、錨 桿 注漿必須是從注漿管孔底反向一次性連續(xù)注漿,如注漿出現(xiàn)間隔,必須采取措施,嚴(yán)禁從孔口注漿至錨固段。各管理崗位上的管理人員必須安照有關(guān)管理制度實(shí)施管理工作,工作成效由考核部門進(jìn)行定期考核,確保各項(xiàng)管理工作切實(shí)有效的實(shí)施。進(jìn)場后應(yīng)立即對工程軸線和標(biāo)高進(jìn)行全面復(fù)測,待復(fù)測合格后簽發(fā)工程測量復(fù)核單并請業(yè)主方、監(jiān)理和設(shè)計方共同簽證。對業(yè)主負(fù)責(zé),要加強(qiáng)管理,使得工程內(nèi)的每一項(xiàng)工作都處于受控狀況;使得工期、質(zhì)量都達(dá)到合同的約定。 3)、建立質(zhì)量否決制度,以專職質(zhì)量監(jiān)督員為主,與現(xiàn)場施工員一起,加強(qiáng)對操作班組的監(jiān)督,發(fā)現(xiàn)問題及時整改,上道工序不合格,下道工序不準(zhǔn)施工。 B、負(fù)責(zé)項(xiàng)目公共關(guān)系工作,協(xié)調(diào)與項(xiàng)目 有關(guān)的方方面面的關(guān)系,同時采取各種方法,塑造良好的項(xiàng)目形象。 D、審核施工方案并監(jiān)督落實(shí),協(xié)調(diào)有關(guān)人員對土建、安裝質(zhì)量及材料、設(shè)備質(zhì)量進(jìn)行驗(yàn)收,認(rèn)真熟悉審查圖紙,進(jìn)行方案選擇參與施工組織設(shè)計編制,并落實(shí)施工技術(shù)質(zhì)量措施。 D、繪制施工總平面圖,并指導(dǎo)施工,根據(jù)施工組織 設(shè)計中的復(fù)核項(xiàng)目,依據(jù)設(shè)計圖紙及有關(guān)規(guī)范要求的質(zhì)量標(biāo)準(zhǔn),逐項(xiàng)進(jìn)行復(fù)核驗(yàn)收。 D、做好施工前的質(zhì)量交底工作,對質(zhì)量工作應(yīng)有計劃、落實(shí)、檢查、評定。 7)對于工程材料在進(jìn)場時應(yīng)嚴(yán)格把關(guān),鋼材、 水泥、砂石料應(yīng)有質(zhì)保書,并應(yīng)按規(guī)范要求進(jìn)行級配分析,對于使用材料按規(guī)范要求送當(dāng)?shù)赜匈Y質(zhì)的檢測單位進(jìn)行復(fù)驗(yàn)。 4) 施工員對分管施工范圍內(nèi)的安全施工負(fù)責(zé),貫徹落實(shí)各項(xiàng)安全技術(shù)措施。 3) 施工現(xiàn)場作業(yè)人員安全教育: 進(jìn)場安全教育; 節(jié)假日前后安全教育;季節(jié)性安全教育(如高溫、汛臺、低溫等自然變化)。 2) 在編制工程施工組織設(shè)計時,把安全生產(chǎn)列為主要內(nèi)容之一,針對本工程特點(diǎn)和各施工面的實(shí)際情況,研究采取各種安全技術(shù)措施,改善勞動條件,消除生產(chǎn)中的不安全因素。 ② 配電箱設(shè)置總開關(guān),同時做到一機(jī)閘一漏電保護(hù)器。 2) 安全保證措施 ① 電纜線沿施工場地一周用絕緣子架空,隔 100 米設(shè)一個 200A 的施工電箱。 ⑧ 保護(hù)零線選擇不小于 10mm2 的絕緣銅線,統(tǒng)一標(biāo)志為綠 /黃雙色線,在任何情況下不使用綠 /黃雙色線作負(fù)荷線。施工人員遵守市民 “ 七不 ” 規(guī)范。 ② 在有關(guān)規(guī)章規(guī)定的地方或項(xiàng)目監(jiān)理的要求下,施工單位應(yīng)該向施工人員提供聽覺保 護(hù)裝置,并應(yīng)指導(dǎo)他們正確地使用這些裝置。 34 當(dāng)土方開挖后待支護(hù)時,邊坡土方出現(xiàn)塌方,應(yīng)立即組織人員對塌方的土方進(jìn)行清理后用砂袋一包一包 地堆砌起來后,盡快對其噴射砼支護(hù)使其邊坡穩(wěn)固不漫延。re clear about the terms of the agreement. It might be best to get advice from an experienced adviser, for example, at a Citizens Advice Bureau. To find your nearest CAB, including those that give advice by , click on nearest CAB. For more information about making a claim to an employment tribunal, see Employment tribunals. 36 The (lack of) air up there Watch mCayman Islandsbased Webb, the head of Fifa39。s plaint. In a statement the Russian side added: We found no racist insults from fans of CSKA. Age has reached the end of the beginning of a word. May be guilty in his seems to passing a lot of different life became the appearance of the same day。 Then in high school, think don39。嫌惡過自己的怯懦,最終卻發(fā)現(xiàn)有很多 緣分 ,有很多錯過,好像冥冥之中真的已經(jīng)注定。 Baumgartner the disappointing news: Mission aborted. r plays an important role in this mission. Starting at the ground, conditions have to be very calm winds less than 2 mph, with no precipitation or humidity and limited cloud cover. The balloon, with capsule attached, will move through the lower level of the atmosphere (the troposphere) where our daytoday weather lives. It will climb higher than the tip of Mount Everest ( miles/ kilometers), drifting even higher than the cruising altitude of mercial airliners ( miles/ kilometers) and into the stratosphere. As he crosses the boundary layer (called the tropopause),e can expect a lot of turbulence. The supersonic descent could happen as early as Sunda. The weatheThe balloon will slowly drift to the edge of space at 120,000 feet ( Then, I would assume, he will slowly step out onto something resembling an Olympic diving platform. Below, the Earth bees the concrete bottom of a swimming pool that he wants to land on, but not too hard. Still, he39。 At the moment, the sky is dark, the air is fresh factor after just rained. Suddenly thought of blue plaid shirt。t remember his appearance. 童年時,覺得壓歲錢和新衣服是過年必備,但是隨著年齡的推進(jìn),會越來越發(fā)現(xiàn),那些東西根本就可有可無;初中時,以為要有一場暗戀才意味著真正的成長,但三年過去后,自己心平氣和的寫同學(xué)錄的時候,突然就發(fā)現(xiàn)是不是真正的成長了,好像并沒有那么重要了;然后到了高中,覺得非要吐露出自己的心聲才能為高中生涯里的懵懂情愫劃上一個句點(diǎn),但畢業(yè)晚會的時候最終還 是被梗塞在了咽喉,后來再次站在他曾經(jīng)揮汗如雨的球場,看著他投過籃球的球框時,突然間發(fā)現(xiàn)自己已經(jīng)想不起他的容顏?;蛟S是愧疚于自己似乎把轉(zhuǎn)瞬即逝的很多個不同的日子過成了同一天的樣子;或許是追溯過去,對自己那些近乎偏執(zhí)的怪異信念的醒悟,這些天以來,思緒一直很凌亂,在腦海中不斷糾纏。s 150th anniversary celebrations and will attend City39。 十 勞動力安排 序號 項(xiàng) 目 人數(shù) 備注 1 鉆 孔 9 2 注 漿 5 3 錨桿制作 和鋼筋綁扎 6 4 模板制作 4 4 噴射手 4 5 普 工 6 十 一 主要機(jī)具使用安排 序號 機(jī)具名稱、型號 單位 數(shù)量 備 注 1 反鏟挖掘機(jī) 臺 2 用于基坑開挖 2 交流電焊機(jī) 臺 2 3 污 水泵 臺 4 用于排除基坑內(nèi)集水 4 鉆孔機(jī) xu600 臺 2 用于錨桿、土釘鉆孔 5 壓漿機(jī) 臺 1 用于非預(yù)應(yīng)力錨桿鉆孔 6 高壓泵 臺 1 用于預(yù)應(yīng)力錨桿 7 電動小型攪拌器 (自制 ) 臺 1 用于漿體攪拌 8 貯漿桶 個 2 用于漿體貯存 9 空壓機(jī) 部 1 加壓 10 射 槍 個 2 噴射砼用 11 防護(hù)眼鏡 個 4 噴射手用 35 十 二 主要工程量 匯總表 編號 名稱 規(guī)格 材料 單位 數(shù)量 備注 1 土釘墻 C20 噴射混凝土 M2 3800 厚度 80 2 土釘墻 C20 噴射 混凝土 M2 178 厚度 100 3 土釘 φ 18 二級鋼 M 12088 M20錨固體 4 土釘 φ 20 二級鋼 M 456 M20錨固體 5 土釘 φ 18 二級鋼 M 272 M25錨固體 6 排水溝 黏土磚砌體 M 86 錨固體 7 加固錨桿 φ 25 二級鋼 M 3902 M20錨固體 8 腰梁 20 槽鋼 M 1338 9 錨桿 φ 25 二級鋼 M 677 M25錨固體 10 格構(gòu)梁 C25 鋼筋混凝土 M 11 坡面素噴固化 C20 噴射混凝土 M2 510 厚度 80 注: 以上數(shù)據(jù)參考,實(shí)際工程量以驗(yàn)收為準(zhǔn)。 治安綜合治理:加強(qiáng)工地治安綜合治理,做到目標(biāo)管理,制度落實(shí),責(zé)任到人。 現(xiàn)場管理 ① 實(shí)行施工現(xiàn)場平面管理制度,各類臨時施工設(shè)施、 施工便道、加工場、堆物場和生活設(shè)施均按經(jīng)審定的施工組織設(shè)計和總平面布置圖實(shí)施;如因現(xiàn)場情況變化,必須調(diào)整平面布置,應(yīng)畫出總平面布置調(diào)整圖報上級部門審批,未經(jīng)上級部門批準(zhǔn),不得擅自改變總平面布置或搭建其它設(shè)施。 ⑩ 除塔吊以外,所有的電機(jī)、電器照明器具、手持電動工具的電源線裝置二級漏電保護(hù)器。 ③ 電纜的接頭接入接線盒并附在墻上。 ④ 電纜線及支線架空或埋地,架空敷設(shè)采用緣子,不直接綁扎在金屬構(gòu)架上,嚴(yán)禁用金屬裸線綁扎。 29 4) 工程實(shí)施前,對投入本工程施工的機(jī)電設(shè)備和施工設(shè)施進(jìn)行全面的安全檢查,未經(jīng)有關(guān)安全部門驗(yàn)收的設(shè)備和設(shè)施不準(zhǔn)使用,不符合安全規(guī)定的地方立即整改完善。 安全技術(shù)交底 施工員在安排生產(chǎn)任務(wù)的同時,結(jié)合分部、分項(xiàng)施工的特點(diǎn),實(shí)施安全技術(shù)交底,操作人員簽證認(rèn)可,并保持記錄。 6) 各專業(yè)人員負(fù)有崗位的安全職責(zé)。建立并執(zhí)行一套完整的安全保證體系。 質(zhì)量檢驗(yàn)程序 1)由分公司工程管理部組織結(jié)構(gòu)核驗(yàn)小組,定期到現(xiàn)場進(jìn)行結(jié)構(gòu)核驗(yàn)。 F、復(fù)核翻樣圖,參與成品與半成品的復(fù)核,復(fù)檢混凝土、砂漿的級配單。 F、對工程中采用的新工藝、新技術(shù)、新材料進(jìn)行研究。 D、負(fù)責(zé)與建設(shè)單位、設(shè)計單位及各分包單位技術(shù)、質(zhì)量協(xié)調(diào)管理工作,做好項(xiàng)目前期配套工作。 質(zhì)量保證體系 項(xiàng)目質(zhì)量監(jiān)控 程序控制和制度執(zhí)行 材料質(zhì)量保 證 工程質(zhì)量保證 分部分項(xiàng)質(zhì)量保證 技術(shù)復(fù)核 質(zhì)量監(jiān)控 材料管理 計量級別 方針目標(biāo) 技術(shù)規(guī)程 質(zhì)量標(biāo)準(zhǔn) 項(xiàng)目經(jīng)理部 23 工程技術(shù)質(zhì)量控制制度 1)、班組認(rèn)真按圖紙, 按規(guī)程操作,建立自檢、互檢質(zhì)量保證體系。 建立協(xié)調(diào)會制度,每日一次工