ent (84). Party A should, if any necessary design change, make the formal amendment and modify drawings for Party B’s implementation.. Material changes and cost increased must be negotiated by both parties before Party B implement the same. Design drawing, illustration and relevant technical data consigned by party B are the basis for construction and shall be confirmed by party A’s signature, which is deemed as the supplementary basis and shall be modified by any party without authorization. 元The total contract price 10%, which is %, 即 合同總價 50All materials provided by Party B should be subject to the approval of Party A prior to use, And none of the same being bought without conformity with Party A requirements can be used. 第4條 工程質(zhì)量Article 4s confirmation when the matters occur as follows. 天(日歷天),自O(shè)rganize construction management staff and construction materials, construction machinery enter the Site. (該造價為包工包料價) Project cost: PMB 第一條 工程項目Article 1, Project item 1. Contract Number: 工程名稱: Project Name: Scope of project 3. 工程造價:人民幣 第二條施工準(zhǔn)備Be responsible for keeping public places clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day. 月and plete on the date of ② 因甲方提出增減項目而造成重大設(shè)計變更,因而影響進度; The material modification or change of design due to the party A’ s requirement of addition or deletion of project have the effect of hindrance on the progress of works. The quality of project should achieve the requirements of acceptance agreed by both parties. Yuan. 竣工驗收結(jié)算后七日內(nèi)Within 7 (seven) days after the pletion acceptance and settlement. If and when any error or material unreasonable problem of design due to party A’s requirement, Party B shall notify Party