freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

中川鎮(zhèn)1:1000地形測量技術(shù)設(shè)計(jì)書(存儲(chǔ)版)

2025-07-06 19:57上一頁面

下一頁面
  

【正文】 and punishment decisions, such as the implementation of the provisions, clear the related party discipline and punishment decision made after, for duties, wages and other relevant alteration formalities for the longest time. 2, sub sub section will the original regulations of 10 categories of acts of violation of discipline integration revised into 6 categories, respectively, in violation of the punishments for acts of political discipline in violation of discipline behavior of punishment in violation of integrity of disciplinary action points of violation punishments for acts of mass discipline the violation of work discipline, punishment in violation of discipline of life behavior punishment 6 chapters. 3, annex Supplementary Provisions clear authority making supplementary provision。s purpose. 8 of these regulations, a total of three series, Chapter 15, 178, more than 24000 words, after the revision of the regulations a total of 3 series, Chapter 11, 133, 17000 words, divided into general and special provisions and Supplementary Provisions Part 3. Among them, add, delete, modify the provisions of the proportion of up to nearly 90%. 1, the general general is divided into five chapters. The first chapter to the regulations of the guiding ideology, principles and scope of application of the provisions, highlight the strengthening of the party constitution consciousness, maintenance the authority of Party Constitution, increase the party organizations and Party members must abide by the party constitution, Yan Centralized centralized, would examine at all levels of the amended provisions implementing and maintaining Party discipline, and consciously accept the party discipline, exemplary pliance with national laws and regulations. The second chapter of discipline concept, disciplinary action types and effects of the regulations, will be a serious warning from the original a year for a year and a half。s several generation of leaders, especially Xi Jinping, general secretary of the important discussion, refer to the three discipline and eight points for attention statements, and reference some embody the Chinese nation excellent traditional culture essence of epigrams. (2) the revised regulations, the main changes in the revised Regulations to fully adapt to the strictly requirements, reflects the according to the regulations governing the law of recognition of deepening, the realization of the discipline construction and Jin Ju. rule is party a ruler, members of the basic line and follow. And the majority of Party members and cadres of Party organizations at all levels should adhere to the bottom line of thinking, fear discipline, hold the bottom line, as a preventive measure, to keep the party39。 two is the political discipline regulations is not prominent, not specific, for violation of the party constitution, damage the authority of Party Constitution of misconduct lack necessary and serious responsibility to pursue。 the fourth part on how to grasp the implementation of the two regulations of the party. code and Regulations revised the necessity and revised history of the CPC Central Committee the amendment to the Chinese Communist Party members and leading cadres honest politics several guidelines and Chinese Communist Party discipline and Punishment Regulations column 1 by 2015 to strengthen party laws and regulations focus. Two party regulations revision work lasted a Years, pooling the wisdom of the whole party, ideological consensus, draw historical experience, respect for the wisdom of our predecessors, which reflects the unity of inheritance and innovation。五.測區(qū)應(yīng)提交的資料,平差計(jì)算手簿,控制網(wǎng)展點(diǎn)圖。⑤等高線遇到房屋及其它建筑物、雙線道路、路堤、坑穴、陡坎、斜坡、雙線河以及注記等均應(yīng)中斷。 各種土質(zhì)按《圖式》規(guī)定的相應(yīng)符號表示。⑤水系:河流、水庫、溝渠、井及各種人工設(shè)施等均應(yīng)精確測繪。地面及架空管線均需表示,并注記輸送物質(zhì)。㎜時(shí),可用直線連接。②使用全站儀,利用各級控制點(diǎn)的成果數(shù)據(jù),逐一測定其測區(qū)內(nèi)地形,地貌點(diǎn)的三維坐標(biāo),坐標(biāo)數(shù)據(jù)直接記錄于全站儀中,將數(shù)據(jù)通訊到微機(jī),使用CASS軟件編繪成圖。﹝b﹞在1:5000比例尺圖的基本圖號之末尾,附加子號數(shù)字(用羅馬字)一個(gè)作為1:2000圖的圖號。使用的儀器其指標(biāo)差互差均不應(yīng)大于15″。方向數(shù)多于3個(gè)時(shí)應(yīng)歸零。②圖根點(diǎn)的密度,在平坦開闊地區(qū),每平方公里不少于50點(diǎn),在建筑區(qū)內(nèi)為滿足測圖需要應(yīng)加大密度。(4)水準(zhǔn)路線觀測結(jié)束后,編制高差表,計(jì)算水準(zhǔn)標(biāo)尺1米長度的改正數(shù),正高改正數(shù),環(huán)線閉合差。5:控制觀測的記錄、整理和計(jì)算(1)各項(xiàng)外業(yè)記錄統(tǒng)一用鉛筆進(jìn)行,字跡要清楚、整潔美觀、不得涂改、擦改和轉(zhuǎn)抄。②四等水準(zhǔn)路線(附合或閉合路線)最大長度為15公里,水準(zhǔn)路線中最弱點(diǎn)的高程中誤差不得大于177。⑥導(dǎo)線邊觀測時(shí)應(yīng)嚴(yán)格遵照《規(guī)范》。在一般水泥或?yàn)r青路面上的可打入20400的鋼釘標(biāo)志。 4:基本作業(yè)方法(1)GPS控制網(wǎng)測量:①GPS網(wǎng)的布設(shè)、選點(diǎn)、埋石以及觀測必須按照GPS測量規(guī)范要求進(jìn)行。將統(tǒng)一3176。帶第35帶,中央子午線為105176。4:作業(yè)依據(jù)① 1992年,國家建設(shè)部頒發(fā)的《全球定位系統(tǒng)(GPS)測量規(guī)范》;② 1999年,國家建設(shè)部頒發(fā)的《城市測量規(guī)范(GJJ899)》;③ 1992年,國家技術(shù)監(jiān)督局發(fā)布的《國家三、四等水準(zhǔn)測量規(guī)范(GB1289891)》;④ 1995年,國家技術(shù)監(jiān)督局發(fā)布的《1:500、1:1000、1:2000地形圖圖式(GB/T79291995)》;⑤ 由測繪院編寫的《中川農(nóng)業(yè)科技開發(fā)園區(qū)1 :1000地形測量技術(shù)設(shè)計(jì)書》。面積約5平方公里,其測圖具體范圍由省農(nóng)牧廳工作人員在實(shí)地指定。甘肅省秦王川農(nóng)業(yè)科技示范基地1:1000數(shù)字化地形測量技術(shù)設(shè)計(jì)書 編寫單位:甘肅地礦局測繪勘查院 編寫者:王騰龍 審核者:李志忠二零零三年六月十日秦王川農(nóng)業(yè)科技示范基地1 :1000地形測量技術(shù)設(shè)計(jì)書 為滿足秦王川農(nóng)業(yè)科技示范基地建設(shè)發(fā)展之需要,受甘肅省農(nóng)牧廳的委托,我院承擔(dān)了該測區(qū)1 :1000地形圖的測繪工作。32′30″之間,測區(qū)平均海拔1950米。③ 測區(qū)有國家測繪局1992年編繪出版的1:5萬地形圖,可作為布設(shè)首級控制網(wǎng)時(shí)參考。二.首級控制網(wǎng)的布設(shè)及測量1:坐標(biāo)換算本測區(qū)位于高斯正形投影統(tǒng)一3176。這樣就能滿足《規(guī)范》要求。3:控制網(wǎng)的布設(shè)方案根據(jù)已有資料和測區(qū)的實(shí)際情況,測區(qū)控制網(wǎng)擬在國家起算點(diǎn)的基礎(chǔ)上布設(shè)四個(gè)D級GPS網(wǎng)點(diǎn),在GPS網(wǎng)的基礎(chǔ)上布設(shè)一級導(dǎo)線網(wǎng)作為測區(qū)的首級平面控制;高程控制網(wǎng)以三角點(diǎn)牛路槽的高程為起算點(diǎn),沿GPS點(diǎn)和一級導(dǎo)線點(diǎn)構(gòu)成一條四等水準(zhǔn)閉和路線,作為測區(qū)的首級高程控制。10√n 151/14000 注:本測區(qū)一級導(dǎo)線平均邊長按規(guī)定可放長至450m;②一級導(dǎo)線點(diǎn)均設(shè)置永久性標(biāo)志,其點(diǎn)位設(shè)在土質(zhì)地面上的埋設(shè)混凝土標(biāo)石一塊,標(biāo)石規(guī)格見《規(guī)范》。在觀測時(shí)讀取溫度、氣壓,輸入儀器,在測距過程中直接加上氣象改正。采用單程觀測,觀測前水準(zhǔn)儀和水準(zhǔn)標(biāo)尺應(yīng)按規(guī)定項(xiàng)目進(jìn)行檢查校正。⑤水準(zhǔn)測量成果的重測和取舍,按《規(guī)范》中有關(guān)要求執(zhí)行。n—fβ的個(gè)數(shù)。因地形限制,圖根導(dǎo)線無法附合時(shí),可布設(shè)不多于四條邊,總長度不超過900米,最大邊長不超過300米的支導(dǎo)線,以滿足測圖及園區(qū)建設(shè)發(fā)展需要。(2)圖根導(dǎo)線測量:①圖根導(dǎo)線的角度測量:采用2秒或5秒全站儀測定其前進(jìn)方向的左角一測回。③圖根導(dǎo)線的高程測量:采用全站儀往、返直讀高差各一測回,每測回4次讀數(shù)。2:地形測圖(1)一般規(guī)定:①本測區(qū)成圖比例尺為1:1000;②根據(jù)《規(guī)范》,本測區(qū)地形圖采用正方形圖幅的分幅與編號方法:﹝a﹞以1:5000比例尺圖的西南角座標(biāo)數(shù)字(用阿拉伯?dāng)?shù)字,以KM為單作為它的圖號,并且作為包括于本圖幅中1:2000至1:1000的基本圖號。(2)測繪方法及要求:①本測區(qū)采用全野外數(shù)字化測繪的成圖方法。房屋一般不綜合,臨時(shí)性建筑物可舍去。城區(qū)建筑區(qū)內(nèi)電力線,通訊線可不連線,但應(yīng)在桿架出繪出連線方向。簡易公路、大車路、鄉(xiāng)村路均應(yīng)準(zhǔn)確測繪,單位內(nèi)部鋪裝的主要道路,按內(nèi)部道路測繪。土堆、坑穴、陡坎、斜坡梯田坎等均應(yīng)注記比高。④地類界與地面上有實(shí)物的線狀符號重合時(shí),省略不繪。作業(yè)人員必須按《規(guī)范》、《圖式》及本設(shè)計(jì)書的要求作業(yè),工作中始終要堅(jiān)持用戶第一,質(zhì)量第一的思想,要確保成果質(zhì)量。 the third part introduces two party regulations modified the main changes and needs to grasp several key problems。 the fourth is to clean the theme is not prominent
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1