freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

樁基施工安全方案培訓(xùn)資料(存儲(chǔ)版)

  

【正文】 h crane shall not exceed 75% of rated lifting capacity. xii. 如需吊運(yùn)工件行走時(shí),載荷不得超過吊車的允許起重量;工件應(yīng)處于吊車的正前方,離地不得超過500毫米,對(duì)于較長(zhǎng)物件要防止擺動(dòng),緩慢行駛。All the workers have to wear appropriate PPE, such as protective clothing, protective mask, googles, insulating boots, safety helmet and so on.iii. 工人必須使用合適的呼吸保護(hù)設(shè)備,在有條件的情況下配備先進(jìn)的焊接送風(fēng)面罩。Flexible copper cable with waterproof rubber case satisfied the load requirements should be chosen as power line, besides, its properties should meet the relevant requirements of “Before starting works, the hot work permit must be applied as per the requirements of the owner . Fire extinguishers should be prepared in advance。 Construction areas should be cleaned to guarantee construction site safe, tidy and civilized. xxi. 作業(yè)人員應(yīng)穩(wěn)妥放置工具和材料,將邊角余料放到桶內(nèi),嚴(yán)禁向地面拋擲材料和工具。Construction machinery only could be used and managed by those authorized people or special people. Operators should ply with the relevant maintenance rules, and ensure them in good working conditions. vi. 操作人員中應(yīng)按規(guī)定時(shí)間對(duì)機(jī)械設(shè)備運(yùn)轉(zhuǎn)部件加注潤(rùn)滑劑,開動(dòng)前、工作前、工作中、停工后,均應(yīng)按規(guī)定項(xiàng)目對(duì)各部位進(jìn)行檢查,并應(yīng)及時(shí)排除故障或提出修理意見。移動(dòng)式施工機(jī)械在使用前應(yīng)將移動(dòng)輪子用墊塊擋住或 將底座固定牢靠。Except the seat stipulated in specification, do not stand or sit in machine. When the machine is running, do not touch the rotating parts.xiv. 重型機(jī)械設(shè)備需要通過架空線路、交叉路口、管架管廊時(shí),應(yīng)先調(diào)查了解,取得可靠數(shù)據(jù),并經(jīng)主管部門確認(rèn)批準(zhǔn),方可通過。杜絕淘汰的和落后的非節(jié)能設(shè)備和材料的使用,積極采用技術(shù)成熟的新技術(shù)、新工藝,實(shí)現(xiàn)節(jié)能降耗,保護(hù)資源。Priority should be given to the use of ener。 It should backfill timely after formating precast pile holes, prevent personel falling into hole.ii. 現(xiàn)場(chǎng)蓄水池應(yīng)用鋼管按照要求做好圍護(hù),并設(shè)置警示牌。 foundation, lubrication level of rotating parts and flexibility of brake and clutch. Only qualified machine could be put into use. xiii. 除規(guī)定座位外,不得在機(jī)械的其它部位坐立。防護(hù)罩 應(yīng)便于停車檢查和加注潤(rùn)滑劑。 Only healthy people is authorized to operate construction machinery. iv. 操作人員不得擅自離開工作崗位,嚴(yán)禁把機(jī)械交給其他人員駕駛和操作。When conducting welding and cutting works, oil, flammable/explosive objects must be kept a safe distance, besides, fire fighting measures must be implemented while carrying out construction in those areas. xix. 工作結(jié)束或長(zhǎng)時(shí)間離開作業(yè)地點(diǎn),要關(guān)掉電焊設(shè)備的電源。Electric welder must be correctly earthed. Ensure to fix the earth line on the ground rod all the time, all the connections must be solid. xiv. 作業(yè)前,按照業(yè)主相關(guān)的規(guī)定要求辦理[動(dòng)火作業(yè)許可證]。Some appropriate measures shall be taken to high frequency arc ignition parts of electric welder. There should be something insulated between the primary winding and secondary winding of welding machine. When welding works has to be conducted in dangerous places, such as metal sealedcontainer or humid environment, noload poweroff device of power supply must be equipped. ix. 及時(shí)修理、更換焊接/切割設(shè)備上不符合使用要求的零部件及電纜線,不允許在故障狀態(tài)下使用 焊接/切割設(shè)備。off the power , solid pile machine, must be moved to the flat place pile machine, the drill pole must slide into the ground to prevent accidental. 焊接作業(yè)的管理 Welding management i. 金屬焊接和切割作業(yè)人員必須符合特種作業(yè)管理規(guī)定的要求,持政府主管部門頒發(fā)的特種作業(yè)操作許可證上崗。Personnel must check with and without broken wires, wire rope fault phenomenon, if there is a hidden danger to immediately stop the construction, improvement after operation.xi. 在采用兩臺(tái)或多臺(tái)起重機(jī)械吊運(yùn)同一重物時(shí),應(yīng)盡量選用相同機(jī)種和相同起重能力的起重機(jī)械并合理布置;明確起重作業(yè)總指揮和中間指揮人員,統(tǒng)一指揮信號(hào)。clothes.ii. 吊裝前,作好安全教育及安全技術(shù)交底工作,作好吊環(huán)、起重繩及起重機(jī)的檢查,發(fā)現(xiàn)問題及時(shí)解決。After Generator repaired, between rotor and stator slot must be carefully checked for tools, materials, and other sundry, lest damage the generator during operation.xii. 必須可靠接地。After the received signal parallel, the entire device shall prevail, adjust the speed, the synchronous closing moment.vii. 并聯(lián)運(yùn)行的發(fā)電機(jī)應(yīng)合理調(diào)整負(fù)荷,均衡分配各發(fā)電機(jī)的有功功率及無功功率。確認(rèn)情況正常后,調(diào)整發(fā) 電機(jī)至額定轉(zhuǎn)速,電壓調(diào)到額定值,然后合上輸出開關(guān),向外供電。 metal protecting net shall be equipped to lamp bulb。燈具與易燃物,且不得直接照射易燃物或應(yīng)采取隔熱措施。Leakage protector should regularly start the leakage test button to jump test, proved to be normal is strictly prohibited to use.xv. 嚴(yán)禁使配電箱、開關(guān)箱的進(jìn)線和出線承受外力。Power distribution cabinet and swith box should be equipped with lock, and be maintained by special people. viii. 電工應(yīng)每日查、維修配電箱、開關(guān)箱,并做好記錄。 they also have to check the electrical device and protective facilities. Only qualified equipment could be put into use. ii. 定期測(cè)定絕緣電阻、耐壓強(qiáng)度、泄漏電流等絕緣性能,確保電氣設(shè)備和供配電線路絕緣良好。Special works, dangerous work and other works have to be carried out in accordance with the approved construction scheme. No unauthorized changes should be made.v. 進(jìn)入施工現(xiàn)場(chǎng)應(yīng)按照規(guī)定辦理臨時(shí)出入證手續(xù),出入證件嚴(yán)禁轉(zhuǎn)借他人使用。ofSafety signboard or lables should be placed in somewhere bright. v. 安全標(biāo)志牌的固定方式分附著式、懸掛式和柱式三種。焊接、切割作時(shí)佩戴防沖擊和熱輻射的防護(hù)面罩,在有引發(fā)危險(xiǎn)可能時(shí)設(shè)置防護(hù)網(wǎng)或屏障。樁基施工安全方案(WMS)Work Management System中國(guó)化學(xué)CNCEC1. 安全保證措施 Safety Assurance Measures 正確使用各類勞動(dòng)防護(hù)用品 Correct usage of PPEi. 進(jìn)入施工現(xiàn)場(chǎng)作業(yè)人員一律穿結(jié)實(shí)的耐油底或鋼頭皮幫的防砸工作鞋。gloves and insulating gloves shall be equipped to welders and electricians, respectively. iv. 在有可能出現(xiàn)飛濺物體時(shí)如切屑、沖刷、撬、敲打等,佩戴防護(hù)眼鏡和圍巾。Safety signs and lables should not be set up on door, window or something movable which would make these signs hard to be found. Never place any barriers in front of signboard. iv. 安全標(biāo)志牌和標(biāo)簽應(yīng)設(shè)置在明亮的環(huán)境中。typeThe construction area, working environment, facilities, equipment and tools shall be carefully inspected prior to construction. Once any hidden danger is found, conduct rectification immediately. iv. 特殊作業(yè)、危險(xiǎn)作業(yè)及其它作業(yè)時(shí),嚴(yán)格按照審批的方案組織施工,不得擅自改變方案,并根據(jù)作業(yè)需要到指定部門辦理各種施工“作業(yè)票”。Workers have to ply with the safe operation instruction, and wear the relevant PPE before using electrical equipment。Power distribution cabinet and swith box should be marked with name, function, and system wiring diagram. vii. 配電箱、開關(guān)箱箱門應(yīng)配鎖、并應(yīng)由專人負(fù)責(zé)。and wiring of power distribution box and swith box. xiv. 漏電保護(hù)器應(yīng)定期啟動(dòng)漏電試驗(yàn)按鈕進(jìn)行試跳試驗(yàn),試跳不正常時(shí)嚴(yán)禁繼續(xù)使用。It is unsuitable to only set up local lighting to a workplace. iii. 室外220V燈具距地面不得低于3米。If the portable lamp is used in humid environment, then something shall be guaranteed: housing and hand shank must be strong。Before starting , set the maximum valune of Magnetic force rheostat , di
點(diǎn)擊復(fù)制文檔內(nèi)容
規(guī)章制度相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1