【正文】
接環(huán)境滿足要求。 施工單位現場施工前期工作完成后,通知廠安全部門進行施工現場安全條件確認驗收,經驗收合格后方可動工。 施工到位要建立自我約束、自我管理機制。 June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued。,必須設專人看護電源,避免觸電事故。 施工場所用火、用電、高空作業(yè)、進入有限空間作業(yè)、起吊作業(yè)、動土作業(yè)執(zhí)行建設單位的有關規(guī)定,尤其是用火、用電、高空作業(yè)必須嚴格按級別使用,不能降級。 現場安全負責人、監(jiān)護人必須按規(guī)定著裝,以示區(qū)別。2)手工電弧焊風速超過8m/s;采用氣體保護焊且風速超過2m/s。,且互相吻合,以便于返修和追溯。 施焊前應檢查坡口是否符合要求。 焊后將熔渣、飛濺等清理干凈,焊縫表面及其熱影響區(qū)不得有裂紋、氣孔、夾渣等缺陷。7. 焊接方法 工藝管線的焊接采用氬電聯焊方法,其中壁厚小于等于5mm,管徑小于等于89mm的管道采用全氬弧。 兩側鋼材均非奧氏不銹鋼時,可選用介于二者之間或與合金含量低的一側相配的焊接材料。焊接管理使用我公司自編FoxPro焊接管理應用軟件本裝置的焊接,全部采用微機互聯網的現代化管理,達到優(yōu)質、高速完成焊接工作。蒸汽吹掃的排放管應引出室外排放,排放管徑應與進氣管相同。 吹掃前應將系統(tǒng)內的儀表加以保護,并將孔板、法蘭連接的調節(jié)閥、節(jié)流閥、安全閥拆除,妥善保管,待吹掃后復位。 氣密試驗氣密試驗按設計文件的要求進行。奧氏體不銹鋼用水試驗時水中的氯離子含量不超過25mg/L。3. 檢查故障安全設施和安全閥是否有問題。9. 伴熱管安裝 伴熱管應與主管平行安裝,并自行排液。(4)管道安裝同時進行支、吊架的固定和調整工作,支、吊架位置應正確,安裝應牢固,管子和接觸面接觸應良好。 管支架安裝(1)配管施工前應進行管支架的安裝,正確調整各管支架的水平位置、垂直位置和管道坡度,以利于管線和部件的對正;(2)盡量避免使用臨時支吊架,如不得已采用時不得與正式支吊架位置沖突,并應有明顯標記和記錄,在管道安裝完畢后應拆除;(3)支吊架的焊接應由合格焊工施焊,按標準要求檢查必須合格;(4)管道安裝完畢后,應按設計規(guī)定逐個核對支吊架的型式和位置,做好固定管架安裝和彈簧支、吊架調整記錄;(5)無熱位移的管道吊架,吊桿應垂直安裝,有熱位移的管道吊架,吊點應在位移相反方向按位移值的1/2偏位安裝。法蘭面與管子中心垂直度DN100100≤DN≤300DN300法蘭螺栓孔對稱水平度177。存放應按其材質、溫度等級、產品編號等嚴格分類堆放,并掛牌標明、嚴禁用錯。2. 編制依據(1) 21萬噸/年丙烯腈擴建工程安裝工程施工招標文件(2) 21萬噸/年丙烯腈擴建工程施工圖紙(3) 《工業(yè)金屬管道工程施工及驗收規(guī)范》GB5023597(4) 《現場設備、工業(yè)管道焊接工程施工及驗收規(guī)范》GB5023698(5) 《石油化工劇毒、可燃介質管道工程施工及驗收規(guī)范》SH35011997(6) 《工業(yè)金屬管道工程質量檢驗評定標準》GB50184-933. 工程特點 本工程的特點屬于擴建工程,與舊裝置的連接很多,因此成品防護和防火及施工安全就顯得很重要了。s departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, everhigher levels of prehensive welloff society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the onestop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollutioncutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, pliance requirement, speed up the town39。并參加圖紙會審,熟悉圖紙,設計資料及有關規(guī)定的文件; 施工前必須具備配管施工圖(包括單線圖),單線圖應與管道裝配圖、流程圖一致,并與工程規(guī)定相符,并有按規(guī)定審批的安裝方案; 所有參加施工人員都要接受技術交底,熟悉施工程序及要求; 施工前工藝工程師要確定單線圖的分段,并通報焊接工程師下達到作業(yè)班組,焊接工程師應作出焊口標號,如實施過程中有更改,應及時調整。7. 施工要點 管道預制 管道預制采用工廠化預制,管道預制應按系統(tǒng)單線圖進行,按單線圖的尺寸要求切割及組對,并留有調整尺寸; 切割及坡口加工鋼管切割宜采用機械方法,當使用熱加工方法時,坡口應用角向磨光機打磨清理,不銹鋼管采用專用砂輪片。管道組成件焊口的組對,應做到內壁平齊,內壁錯邊量不應超過壁厚的10%,且不大于2mm。 管道安裝(1)管道對口平直度:當管子公稱直徑小于100mm時不大于1mm;當管子公稱直徑大于或等于100mm時不大于2mm;全長允許偏差為10mm;(2)法蘭連接時應保持法蘭間的平行,%,且不大于2mm。 靜電接地安裝輸送易燃、易爆及粉料、顆粒介質管道均應有靜電接地要求,其安裝應達到以下要求:(1)每對法蘭或螺紋接頭間電阻值超過規(guī)定值時,應設導線跨接;(2)管道系統(tǒng)的對地電阻值超過100Ω時,應設兩處接地引線,接地