【正文】
修正系數(shù):南面北面,東面和西面,遮擋系數(shù)。用戶滿意后,通過淘寶確認(rèn)付款,我們發(fā)給客戶設(shè)計CAD圖紙及文檔(保證查重)。:319430896我們都是重點(diǎn)大學(xué)暖通專業(yè)畢業(yè)的學(xué)長學(xué)姐,學(xué)習(xí)之余為廣大臨近畢業(yè)的學(xué)子提供代做服務(wù)。客戶把任務(wù)書、CAD建筑底圖和個人要求等資料發(fā)給我們,我們幫助客戶進(jìn)行分析,最終確定系統(tǒng)的方式、設(shè)計費(fèi)用、設(shè)計周期等。Air conditioning engineering design summary of the design of a training center in ChangshaAbstractThis design is a training center in air conditioning engineering design of Changsha. This building including shopping malls, restaurants, entertainment, guest rooms, conference rooms, offices, a multifunctional building. Area of 9,997 ㎡, building height of , building layers of a total of ten stories. First floor mainly for parking and air conditioning puter room located in the basement. Second floor mainly for shops and restaurants, is four to six main office area, is seven to ten main rooms. Under the floor, the functional requirements, the building needs to provide heat load in winter and summer with cooling load. To longterm interest as a starting point to achieve technology is a reliable, economical, energysaving environmental protection, easy management, functional adjustment flexibility and use of safe and reliable. After the feasibility of various options and water systems, design of this fancoil dedicated outdoor air systems。建筑面積為9997㎡,建筑層數(shù)共十層。根據(jù)此樓功能要求,本建筑需要冬季提供熱負(fù)荷、夏季提供冷負(fù)荷。:319430896我們都是重點(diǎn)大學(xué)暖通專業(yè)畢業(yè)的學(xué)長學(xué)姐,學(xué)習(xí)之余為廣大臨近畢業(yè)的學(xué)子提供代做服務(wù)。用戶滿意后,通過淘寶確認(rèn)付款,我們發(fā)給客戶設(shè)計CAD圖紙及文檔(保證查重)。不管您是準(zhǔn)備考研復(fù)試,公務(wù)員考試,還是在設(shè)計院實(shí)習(xí),或者準(zhǔn)備畢業(yè)旅行,我們都能以超高的效率節(jié)省您寶貴的時間,讓您度過一個輕松愉快的畢業(yè)季。因?yàn)槭亲约涸O(shè)計的圖紙,價格可以為400900元?。。。?194308961. 設(shè)計資料 設(shè)計題目長沙市某培訓(xùn)中心空調(diào)工程設(shè)計 設(shè)計基本參數(shù) 室外參數(shù)緯度: 度第一章 經(jīng)度:海拔高度:68m冬季大氣壓力: pa夏季大氣壓力: pa冬季通風(fēng)室外計算干球溫度:℃冬季空調(diào)室外計算干球溫度:℃夏季通風(fēng)室外計算干球溫度:℃夏季空調(diào)室外計算干球溫度:℃夏季空調(diào)室外計算濕球溫度:29℃夏季空調(diào)室外計算日平均溫度: ℃冬季空調(diào)室外相對濕度:90%夏季通風(fēng)室外相對濕度: 63%冬季室外平均風(fēng)速:夏季室外平均風(fēng)速: m/s冬季最多風(fēng)向:NNW冬季平均風(fēng)速: m/s夏季風(fēng)向:S極端最高溫度:℃極端最低溫度: ℃ 室內(nèi)設(shè)計參數(shù)表 夏季冬季新鮮空氣量噪聲標(biāo)準(zhǔn)房間類型 溫度/℃濕度/%溫度/℃濕度/%m3/h?人db(A)辦公室266520453040客房266520453050飲食店266520452050娛樂中心266520451050 土建參數(shù)外墻參數(shù): 通過查資料,選擇23號外墻,其基本構(gòu)造為:水泥砂漿抹灰加淺色噴漿;磚墻;保溫層為硬質(zhì)聚氨酯板; =50mm,K= W/( ), 衰減系數(shù)B=,延遲時間為8h.內(nèi)墻參數(shù): 選擇10號墻磚, =140mm,K= W/( ), , 延遲時間為7h. 屋面參數(shù):選擇10號保溫層面,基本結(jié)構(gòu),混凝土板;架空層;防水層;找平層;找坡層;加氣混凝土保溫層鋼筋混凝土屋面板。 外墻、屋頂?shù)乃沧儌鳠岬睦湄?fù)荷 根據(jù)《實(shí)用供熱空調(diào)設(shè)計手冊》得,在日射和室外氣溫綜合作用下。 設(shè)備散熱冷負(fù)荷(公式 )式中:F——空調(diào)區(qū)面積,m2。 空調(diào)新風(fēng)冷負(fù)荷(公式 )式中:GW——新風(fēng)量hw——室外焓值KJ/Kghn——室內(nèi)焓值KJ/Kg 夏季冷負(fù)荷計算由于個房間設(shè)計溫度一樣,所以負(fù)荷計算時不考慮個房間之間的傳熱,即不用計算內(nèi)墻的冷負(fù)荷。表 1002—1001010—1011房間各項(xiàng)冷負(fù)荷(W)時刻τ9:0010:0011:0012:0013:0014:0015:0016:0017:00圍護(hù)10601074112810541078人體熱設(shè)備熱燈具熱21144總負(fù)荷185718911929197020462060203518881893表 1009房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12:0013:0014:00 15:0016:00 17:00 圍護(hù)15051582人體熱415設(shè)備熱燈具熱42288總負(fù)荷3768表 1012房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 結(jié)構(gòu)人體熱設(shè)備熱燈具熱42288總負(fù)荷3681表 1011120房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)人體熱 設(shè)備熱燈具熱21144總負(fù)荷29552618表 1011119房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)1740人體熱 設(shè)備熱燈具熱21144總負(fù)荷2204245125702647 七層、八層、九層冷負(fù)荷表 78902——789078910——78911房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)人體熱 設(shè)備熱燈具熱21144總負(fù)荷1447表 78901房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)人體熱 設(shè)備熱燈具熱21144總負(fù)荷1664表 78909房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)128314171427人體熱415設(shè)備熱燈具熱42288總負(fù)荷表 78912房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)1625人體熱設(shè)備熱燈具熱42288總負(fù)荷表 78911120房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù)1118人體熱 設(shè)備熱燈具熱21144總負(fù)荷2025表 78911119房間各項(xiàng)冷負(fù)荷(W)時刻τ9:00 10:00 11:00 12 :0013 :0014:00 15 :0016:00 17:00 圍護(hù) 人體熱 設(shè)備熱燈具熱21144總負(fù)荷1896 四、五、六層各房間冷負(fù)荷辦公室人數(shù)為四人。 所以熱濕比ε=Q/W= ,送風(fēng)溫差為6度,采用機(jī)器露點(diǎn)送風(fēng),送風(fēng)狀態(tài)點(diǎn)= 55 KJ/Kg ,=20 ℃。1162= %10% 滿足要求。/h)新風(fēng)比房間78905房間78906房間78907房間78908房間78909房間78910房間78911房間78912房間78913120房間78914房間78915房間78916120房間78917120房間78918房間78919房間78920120房間1001房間1002房間1003房間1004房間1005房間1006房間1007房間1008房間1009415房間1010續(xù)表房間號新風(fēng)量(g/s)新風(fēng)量(m179。N—M過程是風(fēng)機(jī)盤管實(shí)現(xiàn)冷卻除濕的過程。所以, QW=GW(hw—hn)=(100—61)=2696W同理可得到其他各個房間新風(fēng)負(fù)荷。/h)新風(fēng)比門廳4441332房間201房間202房間203房間204房間2051032房間206360