freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

生活污水處理及中水回用工程方案設(shè)計——畢業(yè)設(shè)計(存儲版)

2025-04-08 21:59上一頁面

下一頁面
  

【正文】 In order to enter the structure of the bined sewage effluent peak flow, water quality buffer fluctuations conditioning, sewage treatment structures regulating the frontend buffer pool can be installed in order to balance water quality, storage of water. (2) reliable BOD, COD, SS removal of nitrogen and phosphorus removal function and features to ensure the stability of the final effluent quality. Under normal circumstances, urban sewage in less refractory anic matter, BOD, COD removal is easier to achieve, rather than the plexity of nitrogen and phosphorus removal. The current effluent standards for sewage treatment plant effluent nitrogen and phosphorus indicators have strict requirements, it must be of urban sewage treatment to achieve the effective removal of nitrogen and 洛陽理工學(xué)院畢業(yè)設(shè)計(論文) 31 phosphorus. Under the existing urban sewage nitrogen and phosphorus removal process, A2 / 0 used more widely. For the A2 / 0 process problems, the present situation of a number of improvements in technology, technology also exists for each of the characteristics and limitations of each. As a result of merging the water quality caused by sewage, water, volatile, wastewater treatment plant on the impact of the processing units, in order to adapt to the receiving water requirements, in order to BOD, COD and other indicators of a further drop Property Management Environmental Protection Building energy saving Window and door profile Water Treatment Gas Network Sewage Treatment Town Planning House demolition Construction Low, further removal of sewage bacteria and nitrogen, phosphorus and other plant nutrients in the wastewater treatment plant and receiving water can be established between the oxidation pond. (3) with flexible operation mode, according to the quantity of sewage collection, water quality and seasonal variation of the adjustme nt operation. Conventional A2 / 0 process, it is difficult to do adjust the flexible operation mode. However, A2 / 0 process from the principle constitutes a sense, before the paragraph in the aeration and anoxic plus anaerobic paragraph. This principle for the oxidation ditch technology can be adapted to the formation of a variety of different water quality, quantity, seasonal changes in the operating mode. Wastewater treatment plant can be established according to the actual 洛陽理工學(xué)院畢業(yè)設(shè)計(論文) 32 situation of the oxidation ditch more than two, each for a certain amount of ditch water propeller, bottom uniform microporous gas explosion device. 3 .Selection and characteristics of that process Oxidation ditch is a simple, efficient and economical municipal wastewater treatment technology, has developed rapidly in recent decades. In the flow pattern, it is pletely mixed, but also has pushflow characteristics. As a result of the decreasing concentration of dissolved oxygen ditches changes and appropriate arrangements through the inlet, outlet, back to the entrance of the location of the sludge, oxidation ditch can be inverted to form a A2 / 0 process, see Figure 2, Figure 3: Combined sewage system in accordance with the characteristics of both a triage system, and treated water discha。可以這樣說:在 *老師的耐心指導(dǎo)和自己的努力下, 我完成了畢業(yè)設(shè) 計應(yīng)完成的任務(wù),達(dá)到了畢業(yè)設(shè)計的教學(xué)要求。由排放 口沿水流的逆方向,計算水頭損失, 以 便進行高程布置。 洛陽理工學(xué)院畢業(yè)設(shè)計(論文) 21 第 6 章 高 程 高程的布置簡介 ( 1) 高程布置圖橫向和縱向比例一般不相等,橫向比例可選 1:1000左右,縱向 1:500左右。 污泥濃縮池的具體的設(shè)計計算 計算初沉池、接觸氧化池,二沉池排泥量 ( 1)初沉池 按 SS 去除率計算 ?? )100(1000100 pQcV ?? 平 C: 進入初沉池的 SS 的濃度 210mg/l Q: 平均日流量 1650 m3/d %50: 初沉調(diào)節(jié)池的沉淀效率? P:初沉污 調(diào)節(jié)池 泥 密 度 1000kg/ m3 dmV /)96100(1000 3??? ???? ******畢業(yè)設(shè)計(論文) 17 (2)CASS 工藝的產(chǎn)泥量 按 vss 計算 dkgVXkSSYQ vdeX v s s /)( 0 ???? :? 污泥容量, 取 1000 3/mkg vsX :剩余活性 kgvss/d 0S : 為 BOD5 進水濃度 kg BOD5/m3 eS :出水的 BOD5 的濃度 kg BOD5/m3 Y:產(chǎn)率系數(shù) dK :內(nèi)源代謝系數(shù),一般采用 ~ 1?d vX :平均 vss 的濃度 kgvss/m3 V:CASS 池的容積 m3 由ssX= ?fVSSX 剩余污泥以體積計為: )100( 100 ??? ?PXV SSss m3/d 設(shè)污泥含水率 P=% 故總的污泥量為 V=+= m3/d 濃縮池直徑 濃縮污泥固體通量 M 取 dmkg ./27 2 ,污泥濃度 C 取 lg/6 ,則濃縮池面積 mMQcA ???? 因為污泥量太少了故采用兩日污泥量, 采用 1 個污泥濃縮池 ,則 濃 縮池直徑 兩次的污泥量為 Q1=2Q= 這里我們選取 24m3 即兩日向污泥池中排 一次泥 則有: 624 mMQcA ???? ******畢業(yè)設(shè)計(論文) 18 mmD ???? 濃縮池工作部分高度 取污泥濃縮時 間 hT 15? ,則 mATQh 2415241 ????? 超高 h 取 緩沖層高 mh 污泥升容積 設(shè)池底坡 度 ?i ,污泥斗下底直徑 mD ? ,上底直徑 mD ? ,池底坡度造成的深度 miDDh )2 ()22( 24 ?????? 污泥斗高度 mtgtgDDh )2 (55)22( 00125 ????? 濃縮池總高度 mhhhhhH ??????????? 濃縮后污泥體積 1P 為 經(jīng)二 沉池進入濃縮 池 污泥含水率 %~% ,取 % %98~%972 污泥濃縮后污泥含水率P , 取 97% 3212 )(24)1( )1( mPPQV ?? ?????? ******畢業(yè)設(shè)計(論文) 19 圖 36 重力濃縮池示意 圖 污泥脫水車間的簡介 因為污泥脫水車間就是污泥離心脫水機械,根據(jù)污泥的流量已經(jīng)選好泵的型號,見設(shè)備選型。 ( 6) 設(shè)超高 h1= ( 7) 設(shè)斗的下部正方形邊長為 則計算斗高 h2= ( 8) 調(diào)節(jié)池的總高 H= h1+h+ h2=++= 但因為池子要向地面以下挖掘故池子深度有所改變,將在高程的計算中詳細(xì)介紹。 污水深度處理 城市污水深度處理的目的是為了污水回用。 污泥處理 污泥處理的目的 在水處理 階段中, CASS 池排出的污泥,其含水率為 95%98%,污泥中主要是生物。典型的結(jié)合方式為單獨的氧化池加氧化溝,在氧化溝中完成硝化和反硝化。所以 2/AO工藝可以同 時完成有機物的去除,消化脫氮,磷的過量攝入而被去除等功能,脫氮的前提是 3NH N? 應(yīng)該完全硝化,好氧池能完成這一功能,缺氧池完成脫氮的功能。 ? 根據(jù)生物反應(yīng)動力學(xué)原理,采用多池串聯(lián)運行,使廢水在反應(yīng)器的******畢業(yè)設(shè)計(論文) 10 流動呈現(xiàn)出整體推流而在不同區(qū)域內(nèi)為完全混合的復(fù)雜流態(tài),不僅保證了穩(wěn)定的處理效果,而 且提高了容積利用率。 這使得 CASS 工藝的運行不取決于污水處理廠的情況,可以在任意進水速率并且反應(yīng)器在完全混合的情況下運行而不發(fā)生污泥膨脹。其 DO 接近于零,大約30%的時間, DO 在 1 mg/L 左右,大約 20%的時間, DO 在 2 mg/L 左右。是今年來公認(rèn)的生活污水及工業(yè)污水處理的先進工藝。 ③ 在處理周期的開始和結(jié)束時,反應(yīng)器內(nèi)水質(zhì)和污泥符負(fù)荷經(jīng)歷了一個由高到低的的變化,溶解氧則由低到高。由于本項目要求脫氮除磷,下面將介紹幾種常見的生物脫氮除磷工藝,以供選擇: (1) SBR 法(間歇式活性污泥法) 間歇式活性污泥法也稱為序批式活性污泥法(簡稱 SBR),是在一個反應(yīng)器中周期性的完成生物降解和泥水分離過程的污水處理過程的污水處理工藝。 第 2 章 處理工藝確定 ******畢業(yè)設(shè)計(論文) 6 概述及工藝的確定 污水處理工藝流程的選定因素 ( 1) 污水處理程度決定于以下三點 :按水體的水質(zhì)標(biāo)準(zhǔn)確定 ,即根據(jù)地方政府或國家環(huán)保部門對收納水體的規(guī)定的水質(zhì)標(biāo)準(zhǔn)進行確定 . ( 2) 按城市污水處理廠處理工藝所能達(dá)到的處理程度 ,一般以二級處理技術(shù)能達(dá)到的處理程度作為依據(jù) . ( 3) 考慮收納水體的稀釋自凈能力 ,這樣可以在一定程度上降低對水質(zhì)的要求 ,降低處理程度
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1