freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

建筑工程設(shè)計合同建設(shè)工程設(shè)計合同的有效期限(17篇)(存儲版)

2025-08-08 19:15上一頁面

下一頁面
  

【正文】 d in pliance with the regulations on detail requirements of design documents for construction project (issued by ministry of construction dated in april, 20__).第五條設(shè)計費(fèi)用及支付方法article 5. design fee and the mode of payment: handing over stage竣工驗(yàn)收后after the pletion and handing over of the project第六條雙方責(zé)任article6. responsibilities of both parties: responsibilities of party a:,在規(guī)定的時間內(nèi)向乙方提交資料及文件,并對其完整性、正確性及時限負(fù)責(zé)。 party a shall pay the design fee to party b within thirty (30) days upon receiving the notice of payment from party a according to the amount and the time stipulated in article 5. in case that such payment is delayed for sixty (60) days upon receiving the notice of payment, then a penalty of % of the due amount of payment on a daily basis shall be paid by party a. in case that such payment is delayed for a period over 30 days, party b shall have the right to suspend their design work for the next phase and shall inform party a in writing. in case that the management of party a does not approve the design documents or the construction of the project of this contract is stopped or.. postponed, party a shall nevertheless pay the due design fee. party b shall be responsible for correcting any omission or mistake in their design documents before the construction. if the design mistake made by party b has caused losses to party a, party b shall not only be responsible for taking the remedial measures, but also shall remit the design fee for the part of such losses and shall pay pensation to party a according to the degree of such loss. the amount of the pensation shall be determined by party b and his insurance pany and to be in accordance to the professional indemnity insurance coverage.,延誤了按本合同第四條規(guī)定的設(shè)計文件交付時間,每延誤一天,應(yīng)減收該項目應(yīng)收設(shè)計費(fèi)的千分之一。 party b is not allowed to disclose and transfer to a third party any product drawing, technical and economic data etc. which are provided by party a. in case that the abovementioned is happened, party a shall have the right to claim.。 if party a entrusts party b to undertake those work and services which are beyond this contract, party a shall pay additional fee.,雙方應(yīng)及時協(xié)商解決。 party a has engaged provisions specified in the chinese language version shall take precedence.,在30日內(nèi)報項目所在地建設(shè)行政主管部門備案。 this contract shall be made in 8 copies. party a shall hold 4 copies. party b shall hold 3 copies. the government authority department shall hold one copy.,如有矛盾,應(yīng)以中文文本為準(zhǔn)。為甲方的顧問,協(xié)助甲方進(jìn)行設(shè)計管理和建筑設(shè)計咨詢。 the expenses needed shall be borne by party a. and shall be responsible for solving all the relevant design problems and to attend the handing over meeting. party b shall send the relevant personnel to participate in the regular site meetings suring the construction. party b should optimize the design to assist party a in meeting the project budget.、泄露、轉(zhuǎn)讓甲方提交的產(chǎn)品圖紙、技術(shù)經(jīng)濟(jì)資料。逾期超過30天以上時,乙方有權(quán)暫停履行下階段工作,并書面通知甲方。 m/e work. (including 3,000㎡of airraid shelter design, but excluding other specialists’ design, such as the luxurious interior design, landscaping design and facade flood lighting design). the total floor area during the working drawing stage is 70,000㎡(excluding the soho area, which is starting from the fifth floor level to the seventh floor level).第三條甲方向乙方提交的有關(guān)資料及文件(見下表)article3. relevant documents which shall be issued by party a to party b:序號s/n資料及文件名稱name of documents份數(shù)copies提交時間submission date備注remarks1政府批文government approval documents1全套full set2設(shè)計任務(wù)書design instructions13規(guī)劃紅線圖plan of property line14水、電、氣源落實(shí)情況說明design information of utilities (water, electricity amp。㎡), the total height is 。,從詢價、對外談判、國內(nèi)外技術(shù)考察直至建成投產(chǎn)的各個階段,應(yīng)吸收承擔(dān)有關(guān)設(shè)計任務(wù)的設(shè)計人參加。由于設(shè)計人員錯誤造成工程質(zhì)量事故損失,設(shè)計人除負(fù)責(zé)采取補(bǔ)救措施外,應(yīng)免收直接受損失部分的設(shè)計費(fèi)。如發(fā)生以上情況并給發(fā)包人造成經(jīng)濟(jì)損失,發(fā)包人有權(quán)向設(shè)計人索賠。,如果設(shè)計人能夠做到,發(fā)包人應(yīng)根據(jù)設(shè)計人提前投入的工作量,向設(shè)計人支付趕工費(fèi)。付費(fèi)次序占總設(shè)計費(fèi)%付費(fèi)額(元)付費(fèi)時間(由交付設(shè)計文件所決定)第一次付費(fèi)20%定金20%定金說明:。建設(shè)單位(甲方):設(shè)計單位(乙方):法定代表人:_______法定代表人:_______聯(lián)系人:_________聯(lián)系人:_________通訊處:_________通訊處:_________電話或電報:_______電話或電報:_______開戶銀行:________開戶銀行:________帳號:__________帳號:_____________年__月__日訂建筑工程設(shè)計合同 建設(shè)工程設(shè)計合同的有效期限篇七工程名稱:__________________________________工程地點(diǎn):__________________________________合同編號:__________________________________由設(shè)計人編填)設(shè)計證書等級:______________________________發(fā)包人:____________________________________設(shè)計人:____________________________________簽訂日期:__________________________________深圳市規(guī)劃與國土資源局監(jiān)制發(fā)包人:____________________________________設(shè)計人:____________________________________發(fā)包人委托勘察人承擔(dān)______________________________工程設(shè)計,經(jīng)雙方協(xié)商一致,簽訂本合同。本合同如有未盡事宜,需經(jīng)雙方共同協(xié)商,作出補(bǔ)充規(guī)定。乙方向甲方提交施工圖文件后___天內(nèi),甲方應(yīng)向乙方結(jié)清全部設(shè)計費(fèi)(設(shè)計周期較長的大型工程項目,施工圖階段的設(shè)計費(fèi),可按單項工程設(shè)計完成后分別撥付)。,在原定任務(wù)書范圍內(nèi)的必要修改,乙方應(yīng)負(fù)責(zé)承擔(dān)。第三條乙方的義務(wù),向甲方交付初步設(shè)計文件。甲方在____年__月__日施工圖設(shè)計前,應(yīng)提供經(jīng)過批準(zhǔn)的初步設(shè)計文件和能滿足施工圖設(shè)計要求的勘察資料、施工的條件,以及有關(guān)設(shè)備的技術(shù)資料。調(diào)解不成,或不屬于同一部門的,可向___仲裁委員會申請仲裁(向人民法院起訴)。對于因乙方設(shè)計錯誤造成工程重大質(zhì)量事故者,乙方除免收受損失部分的設(shè)計費(fèi)外,還應(yīng)付相應(yīng)的賠償責(zé)任。,應(yīng)及時用書面通知乙方,已付設(shè)計費(fèi)不退,并按該階段的實(shí)際耗工日,增付和結(jié)清設(shè)計費(fèi),同時結(jié)束合同關(guān)系。(大型建筑安裝工程,甲乙雙方可視具體情況分階段進(jìn)行設(shè)計,在具備設(shè)計條件時,雙方簽訂階段設(shè)計合同。,甲方應(yīng)提供必要的工作條件,并在生活上予以方便,在設(shè)計和施工過程中因技術(shù)上的特殊需要進(jìn)行試制試驗(yàn),所需一切費(fèi)用以及為配合甲方到外地的差旅費(fèi)均由甲方負(fù)責(zé)。經(jīng)甲乙雙方充分協(xié)商,特簽訂本合同,以便共同遵守。超過規(guī)定期限15天以上時,設(shè)計人有權(quán)重新確定提交設(shè)計文件的時間。,并負(fù)責(zé)將報批結(jié)果書面通知設(shè)計人。,設(shè)計人與發(fā)包人可根據(jù)不同階段完成的工作量增加設(shè)計費(fèi)付款次數(shù),金額與時間另行約定。,設(shè)計人向發(fā)包人提交的設(shè)計文件詳見附表二,設(shè)計階段、規(guī)模、投資見附表三。發(fā)包人名稱: 設(shè)計人名稱:(蓋章) (蓋章)法定代表人:(簽字)法定代表人:(簽字)委托代理人:(簽字)委托代理人:(簽字)項目經(jīng)理:(簽字)項目經(jīng)理:(簽字)建設(shè)行政主管部門備案:鑒證意見:(蓋章) (蓋章)備案號:經(jīng)辦人:備案日期: 年 月日鑒證日期:年月日建筑工程設(shè)計合同 建設(shè)工程設(shè)計合同的有效期限篇四單位級別編號:_____________工程名稱:______________________________________工程編號:______________________________________合同編號:______________________________________發(fā)包人:________________________________________設(shè)計人:________________________________________發(fā)包人(甲方)與設(shè)計人(乙方)經(jīng)協(xié)商一致簽訂本合同,合同條款如下:第一條 合同簽訂依據(jù) 《中華人民共和國民法典》、《中華人民共和國建筑法》、《建設(shè)工程勘察設(shè)計市場管理規(guī)定》和《建設(shè)工程勘察設(shè)計管理條例》。,另行簽訂協(xié)議并支付費(fèi)用。第十一條仲裁本合同在履行過程中發(fā)生的爭議,由雙方當(dāng)事人協(xié)商解決,協(xié)商不成的,按下列第___________種方式解決:(一)提交___________仲裁委員會仲裁。,須征得設(shè)計人同意,不得嚴(yán)重背離合理設(shè)計周期,且發(fā)包人應(yīng)支付趕工費(fèi)。,發(fā)包人要求終止或解除全同,設(shè)計人未開始設(shè)計工作的,不退還發(fā)包人已付的定金。之后,發(fā)包人應(yīng)按設(shè)計人所完成的施工圖工作量比例,分期分批向設(shè)計人支付總設(shè)計費(fèi)的50%,計___________萬元,施工圖完成
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1