freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

安徽工業(yè)大學(xué)大學(xué)生公寓畢業(yè)設(shè)計(jì)-免費(fèi)閱讀

  

【正文】 涉密論文按學(xué)校規(guī)定處理。對(duì)本研究提供過(guò)幫助和做出過(guò)貢獻(xiàn)的個(gè)人或集體,均已在文中作了明確的說(shuō)明并表示了謝意。對(duì)培養(yǎng)我們的綜合素質(zhì)、培養(yǎng)創(chuàng)造能力具有無(wú)法替代的作用。 = 選配14120(即3014,As=) 樓梯設(shè)計(jì) 樓梯概況本工程樓梯為現(xiàn)澆整體板式樓梯,踏步尺寸 150mm270mm,層高取標(biāo)準(zhǔn)層層高 3600mm計(jì)算;采用混凝土強(qiáng)度等級(jí) C25,板采用鋼筋等級(jí)為 HPB300 級(jí),梁用鋼筋等級(jí)為HRB400 級(jí);樓梯均布活荷載標(biāo)準(zhǔn)值是 q= kN/m2。基底以下土的平均容重γ=18 kN/m3 基底以上土的平均重度γm=20kN/m3。查得材料的強(qiáng)度等級(jí)標(biāo)準(zhǔn)值和設(shè)計(jì)值如下:混凝土強(qiáng)度:C30 鋼筋強(qiáng)度:HRB400 HPB300 相對(duì)受壓區(qū)高度:表318 框架柱正截面受彎承載能力計(jì)算截面位置柱底柱頂M(KNm考慮跨間最大彎矩處梁下部受拉時(shí),按 T 形截面設(shè)計(jì);當(dāng)梁上部受拉時(shí),按矩形截面設(shè)計(jì)。為計(jì)算簡(jiǎn)便,可取軸線(xiàn)處的剪力驗(yàn)算。對(duì)二層柱: 查表得 修正后對(duì)一層柱: 查表得 修正后其它層,查表得下面以4軸線(xiàn)橫向框架內(nèi)力的計(jì)算為例,計(jì)算過(guò)程如表 316所示: 表 316(a)各層柱端彎矩及剪力計(jì)算(邊柱)層次hi(m)Vi(kN)∑Dij(N/mm)邊柱Di(N/mm)V i1(kN)ky(m)M bi1(kN頂部附加地震作用系數(shù):δn=+=+=頂部附加水平地震作用:各質(zhì)點(diǎn)橫向水平地震作用按下式計(jì)算: 地震作用下各樓層水平地震層間剪力為: 主體結(jié)構(gòu)頂層(第5層)水平地震作用為:抗震驗(yàn)算時(shí),結(jié)構(gòu)各樓層的最小水平剪力標(biāo)準(zhǔn)應(yīng)符合,查表可得剪力系數(shù)λ=計(jì)算過(guò)程如下表 314所示:表 314 各樓層橫向水平地震作用和層間剪力計(jì)算表層次高度Hi(m)Gi(kN)GiHiGiHi/∑GjHjFi(kN)Vi(kN)516670741503613 123684297007170330各質(zhì)點(diǎn)水平地震作用分布示意圖及樓層地震剪力沿房屋高度的分布示意圖分別如圖317及圖318所示:圖317 水平地震作用分布示意圖 圖318 層間剪力示意圖 多遇水平地震作用下的位移驗(yàn)算水平地震作用下框架結(jié)構(gòu)的層間位移 (△u)i和頂點(diǎn)位移 u i分別按下列公式計(jì)算:(△u)i= Vi/∑D iju i=∑(△u)k各層的層間彈性位移角,根據(jù)《建筑抗震規(guī)范》,考慮磚填充墻抗側(cè)力作用的框架,層間彈性位移角限值[]1/550。mm)()1010 (N彎矩計(jì)算過(guò)程如圖 510所示、所得彎矩圖如圖511所示。計(jì)算簡(jiǎn)圖如下圖34所示:如下圖所示,可將該區(qū)板塊分為A、B兩種板,分別計(jì)算如下: 樓蓋梁格布置圖(1) A區(qū)格板(雙向板)恒荷載設(shè)計(jì)值:活荷載設(shè)計(jì)值: A區(qū)格板為四邊固定,則單位板寬跨中彎矩:?jiǎn)挝话鍖捴ё鶑澗兀?保護(hù)層厚度取20mm,鋼筋選用Ф8,故短跨方向跨中截面有效高度支座處均為76mm,取,A區(qū)格板配筋計(jì)算結(jié)果見(jiàn)下表 A區(qū)格板配筋計(jì)算(2)、B區(qū)格板(單向板)1)2)、荷載組合設(shè)計(jì)值 由可變荷載效應(yīng)控制的組合: 由永久荷載效應(yīng)控制的組合: 故取由可變荷載效應(yīng)控制的組合:3)、內(nèi)力計(jì)算 取1m板作為計(jì)算單元,按彈性理論計(jì)算,取B區(qū)格板的計(jì)算跨度??蚣芙Y(jié)構(gòu)的計(jì)算單元如圖所示: 框架結(jié)構(gòu)計(jì)算單元 梁、柱截面尺寸的初步確定框架梁截面尺寸估算(1)縱向框架梁l=7200 mm,h=(1/8~1/12)l=900 mm~600 mm,取h=700 mm ;b=(1/2~1/3)h=450 mm~200 mm, 取b =300 mm ;故梁的截面初步定為:bh=300mm700mm ;其慣性矩為:I=1/12(bh3)=3007003/12=109 mm4(2)橫向框架梁1)、l=2400 mm,h=(1/8~1/12)l=300mm~200 mm,取h=400 mm;按規(guī)范規(guī)定的最小限值,梁的截面初步定為:bh=250mm400mm,其慣性矩為:I=1/12(bh3)=2504003/12=109 mm42)、l=8400 mm,h=(1/8~1/12)l=1050 mm~700 mm,取h=700mm;b=(1/2~1/3)h=450 mm~200 mm, 取b =300 mm;故梁的截面初步定為:bh=300mm700mm其慣性矩為:I=1/12(bh3)=3007003/12=109 mm4(3)次梁l=8400 mm,h=(1/8~1/12)l=1050 mm~700 mm,取h=700mm;b=(1/2~1/3)h=450 mm~200 mm, 取b =300 mm;故梁的截面初步定為:bh=250mm700mm框架柱截面尺寸估算(1)按軸壓比要求初估框架柱的截面尺寸。 第二章:建筑設(shè)計(jì)說(shuō)明部分 工程概況: 工程名稱(chēng):安徽工業(yè)大學(xué)大學(xué)生公寓設(shè)計(jì);工程位置:安徽省馬鞍山市;工程總面積:㎡,地上五層,,, m。結(jié)構(gòu)設(shè)計(jì)簡(jiǎn)而言之就是用結(jié)構(gòu)語(yǔ)言來(lái)表達(dá)工程師所想要表達(dá)的東西。關(guān)鍵詞:結(jié)構(gòu)設(shè)計(jì);荷載計(jì)算;抗震設(shè)計(jì);AbstractThis graduation design is a graduate student apartment building, is mainly the structural design part. Structural design is simply the structure language to express what engineers want to express. The structure of language refers to the structure under the tutelage of structural elements to simplify the refined from architectural and technical drawings, including foundation, wall, column, beam, board, stair, sample detailed map, and so on. Then with these structural elements to a building or construction of the structure of the system, including vertical and horizontal load and resistance system, then the generated by various load to the most concise way to transfer basis. The project uses concrete frame structure system, select only the main body in the middle of a pin frame calculation, considering the seismic fortification intensity is 7 degrees seismic calculation. Including the horizontal load and vertical load calculation and the internal force calculation and ponent design, the vertical load function adopts is the second moment distribution method, horizontal load function adopts the D value method, and earthquake action is used at the bottom shear method.Keywords: structural design。柱網(wǎng)如圖所示: 主體結(jié)構(gòu)柱網(wǎng)布置圖 框架結(jié)構(gòu)承重方案的選擇: 豎向荷載的傳力途徑:樓板的均布活載和恒載經(jīng)次梁間接或直接傳至主梁,再由主梁傳至框架柱,最后傳至地基。為計(jì)算簡(jiǎn)便,板塊的計(jì)算跨度近似取軸線(xiàn)之間的距離。 恒荷載作用計(jì)算恒荷載計(jì)算各構(gòu)件恒荷載計(jì)算(1)墻、門(mén)、窗單位面積重力荷載①外墻200厚,粘土非承重空心磚(12 KN/m3,考慮了外墻保溫)內(nèi)側(cè)20mm抹灰,則外墻重力荷載為:12+17= KN/m2 ②內(nèi)墻200厚,粘土非承重空心磚(12 KN/m3)雙側(cè)各20mm抹灰,則內(nèi)墻重力荷載為:12+172= KN/m2 ③木門(mén)單位面積重力荷載: / m 2④鋁合金窗單位面積重力荷載: / m 2恒荷載作用下各層框架梁上的荷載分布如下圖: 梁上恒載作用示意圖(1)對(duì)于第 5 層、代表橫梁自重,為均布荷載形式。圖313 活荷載作用彎矩二次分配計(jì)算圖 圖314 活荷載作用下彎矩圖(括號(hào)內(nèi)為雪荷載)恒荷載作用下計(jì)算(1)第5層:荷載引起的剪力:AB跨:BC跨: 彎矩引起力:AB跨:BC跨: 總剪力:AB跨: BC跨:VB=VC=柱軸力:A柱:B柱:(2) 第4層:荷載引起的剪力:AB跨:BC跨:彎矩引起的剪力:AB跨:BC跨: 總剪力:AB跨:VA== ,VB=+=BC跨: VB=VC=柱軸力:A柱: B柱:(3) 第3層:荷載引起的剪力:AB跨:BC跨: 彎矩引起的剪力: AB跨:BC跨: 總剪力:AB跨:VA== ,VB=+=BC跨: VB=VC=柱軸力:A柱:B柱:(4) 第2層:荷載引起的剪力:AB跨:BC跨: 彎矩引起的剪力:AB跨:BC跨: 總剪力:AB跨:VA= ,VB=BC跨:VB=VC=柱軸力: A柱:B柱:(5)第1層:荷載引起的剪力:AB跨: BC跨: 彎矩引起的剪力:AB跨:BC跨: 總剪力:AB跨:VA== ,VB=+=BC跨:VB=VC=柱軸力:A柱:B柱:活荷載作用下計(jì)算:(1)第5層:1)屋面活荷載:荷載引起的剪力:AB跨:BC跨: 彎矩引起的剪力:AB跨:BC跨: 總剪力:AB跨: BC跨:VB=VC=0KN柱軸力:A柱:B柱:2)雪荷載: 荷載引起的剪力:AB跨:BC跨: 彎矩引起的剪力:AB跨:BC跨: 總剪力:AB跨: BC跨:VB=VC=0KN柱軸力:A柱:B柱:(2)第4層:荷載引起的剪力:AB跨:BC跨: 彎矩引起的剪力:AB跨: BC跨: 總剪力:AB跨:BC跨: VB=VC=0KN柱軸力:A柱:B柱:(3)第3層:荷載引起的剪力:AB跨: BC跨: 彎矩引起的剪力:AB跨:BC跨: 總剪力:AB跨: BC跨:VB=VC=0KN柱軸力:A柱:B柱:(4)第2層:荷載引起的剪力:AB跨:
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1