【正文】
me the technical documentation is provided. In addition to providing the knowhow, party B shall also select and provide to Party A the key equipment necessary for the manufacture of contact products. The requirements and specifications are specified in the “Equipment Purchase Contract” (EPC) of which the delivery and payment are subject to the provisions thereof. Party B shall, according to the conditions and requirements as specified in Appendix 4, render technical training to Party A’s personnel in the factory of Party B so as to ensure that the personnel can master the knowhow and be able to manufacture the contract products. According to the contract contents and scopes as specified in Chapter 2, the total price of the knowhow to manufacture contract products provided by Party B including the designs, drawings, engineering documents, technical service and training shall amount to US$140, of which US$105, shall be transfer fee and US$35, shall be training fee. All the calculations and payment of expenses of this contract shall be in US Dollars. (2) One original copy of the letter of confirmation of Party B to plete the technical documentations as specified in Appendix 2 of the contract within 2 months after the contract takes effect. (4) Commercial invoice of US$21, in four copies. 55% of the US $ 140, contract price amounting to US $ 77, shall be paid by Party a to Party B by M/T after in installation and testing of the equipment are pleted, the equipment is put into operation and produces qualified products and both parties have signed certificate of acceptance, and within 30 days after Party A has received the following documents and proved that they are in conformity with the contract:(1) Commercial invoice of US $77, in four copies.(2) equipment The delivery of the equipment and equipment technical documentations shall be subject to the terms of delivery of the EPC. Detailed list of technical documentations in three copies. If the technical documentations are hand carried to Shenzhen, the date when Party A signs the receipt shall be taken as the date of delivery of the technical documentations. In case of any loss, shortage of damage of the technical documentations during shipment, Party b shall, within the possible shortest time which, however, doesn’t exceed 20 days from notification by Party A, make replacement to Party A free of charge. The packing of the technical documentations should be strong, suitable for long distance transportation and repeated loading and unloading. Precautions against rain and moisture shall also be taken. Each case shall be marked in English indicating the following contents:(1) Contract number (6) Weight (7) Case number In each case, a detailed packing list in two copies shall be inserted.Chapter 6Modifications amp。 To ensure that the knowhow supplied by Party B is correct, reliable and advanced, both parties shall jointly perform in Party A’s factory the assessment and acceptance of the contract products in accordance with the provisions of Appendix 6 of the contract. If the failure of the first assessment and acceptance is due to Party B’s responsibility, Party B shall send experts to participate in the second or the third assessment and acceptance, and expenses thus occur shall be borne by Party B。 If the products are still not qualified after the third assessment and acceptance and the responsibility lies in party B, Party B shall be responsible for all the losses thus caused and Party a shall have the right to terminate the contract and raise a claim against Party B according to chapter 8。 Party B guarantees that the delivered technical documentations are plete, correct, uniform, clear and the delivery is on time. Detailed requirements are as follows。 There is no error in the technical documentations delivered by party B. When Party A strictly follows such documentations, the products manufactured are qualified. The delivered equipment shall be installed and tested by party B and shall fully ply with the technical requirements and processing quality of the contract. However, the total amount of the above penalty shall not exceed 5% of the total contract price.Chapter 9 they shall be handled by Party B and the third party. The responsibility and loss, either legally or economically, shall be borne by Party B. The arbitration shall take place in the Shenzhen Office of the China Council for the Promotion of International Trade according to its rules and procedures. Force Majeure Effectiveness,Termination of Contract amp。 The term of contract shall be 60 months from the date when Party A can manufacture qualified contract products with the knowhow and equipment supplied by Party B. Upon expiration of such term of contract, the contract shall automatically bee voil and null. All the technical documentations shall be written in English.Party A:Legal Representative:Party B:Legal Representative: