freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

建筑專(zhuān)業(yè)施工工藝策劃-全文預(yù)覽

  

【正文】 面Chapter 10 Block Building Floor2施工工藝控制要點(diǎn)Essentials of Construction Technology樓地面板材飾面的外觀質(zhì)量問(wèn)題, 已成為影響建筑裝修外觀審美關(guān)注的焦點(diǎn)之一,其質(zhì)量控制要點(diǎn)有:材料的選擇、排版策劃、細(xì)部處理、成品保護(hù)等。澆水次數(shù)應(yīng)能保持砂漿面層具有足夠的濕潤(rùn)狀態(tài)。Water proof coiled stock should be adopted the meathod of overall adhibiting for the flashing points. The flashing ending points should be confirmed the sealingup forms according to flashing height and flashing wall materials. 剛性防水施工要點(diǎn) Essentials of Rigidity Water Proof Construction(1)分格縫縱橫向間距不宜大于3m,應(yīng)在隔離層干燥后、澆筑細(xì)石混凝土層前留設(shè)。 make smooth concrete surface bee rugged face, and then use clear water to wash until being neutral.b)細(xì)部節(jié)點(diǎn)處理 treatment of detailing joints of framework2)天溝、檐溝應(yīng)設(shè)置附加層,天溝、檐溝卷材收頭應(yīng)固定密封。Thickness and technical requirements of screed coat should satisfy the designing requirements and generally satisfy the requirements of specifications. 保溫層施工要點(diǎn) Construction Essentials of thermal insulating layer1)基層清理,應(yīng)將屋面基層表面的泥土、雜物清理干凈,基層應(yīng)平整、干燥。 before erecting doors and windows and pleting interior and outside moisting work outdoor, do not damage plastic membrane to avoid mortar eroding its surface。 foursquare.,防止框架梁柱與墻體交縫開(kāi)裂wall surface plastering should be in mesh division to prevent joints of frame beamcolumn and the wall from splitting. Essentials of water antiseepage for the wall墻面滲水一般存在以下部位:外墻開(kāi)裂處、變形縫處、女兒墻與屋面交接處、窗臺(tái)內(nèi)低外高向內(nèi)滲水等 generally there are positions for water seepage of the wall as follows: crack points of exterior wall, points of movement joints, joint points of parapet and roofing, water seepage inward because of low inside and high outside for the windowsill and so on. 3工藝示范圖片 Demonstration Pictures of Technology ,既防止粉刷層開(kāi)裂、起殼,又增加立面美觀i. Mesh division joints of plastering columnbeam for interior wall should be even and straight。 strictly control the mixture ratio and intensity of plastering mortar, and it is not better that is of higher intensity。 reinforce tie columns fine concrete for stuffing加氣混凝土砌塊灰縫均勻順直、構(gòu)造柱留設(shè)正確mortar joints of building blocks for air entraining concrete are even and straight and the constructional columns setting is correct填充墻到頂斜砌filler wall up to the top for slanting bricking wall holes and slotting should be correctly set and repaired洞口留設(shè)規(guī)矩,不同界面處加設(shè)鋼絲網(wǎng)holes setting is regular, and there should be steel wire mesh for different interfaces3工藝示范圖片 Demonstation of Technology i輕質(zhì)砌塊成品 i. finished products of light building blocks。 reasonable manners of masonry ensure mortar joints。 iii. Briquetting steel plates’ bottom die and steel girder are smooth and straight。 iv. Foundation pier appearance for unit 2 turbine of He Yuan Power Plant in Guangdong Province第三章 建筑鋼結(jié)構(gòu) Chapter 3 Steel Structure of Building施工工藝控制要點(diǎn)Controlling Essentials of Construction Technology主要控制的關(guān)鍵環(huán)節(jié):原材料矯正、下料后邊角的修整打磨、鋼桁架起拱、螺栓孔群排列整齊規(guī)則、組裝焊接過(guò)程中變形控制與校正、交叉管材接口放樣切割馬蹄口后才能焊接。 iii. The foundation protection is in good condition。The foundation edge angles always suffer form machinery collision, and that adopting wooden formwork to make cornerite is paratively simple and feasible scheme at present.基礎(chǔ)成品保護(hù)到位in good condition of finished products protection for the foundation2工藝示范圖:Demonstration Pictures of Technologyi混凝土板墻模板拼縫順直,螺栓眼成排成線(xiàn) ii大體積混凝土模板拼縫規(guī)則,棱角方正無(wú)裂紋iii基礎(chǔ)保護(hù)到位 iv基礎(chǔ)表面光滑無(wú)色差,棱角方正 i. The edge joints of concrete siding wall formwork are straight。 installing formwork is the important factor that affects foundation sectional dimension, and ensures foundation corners straight and surface smooth. ⅰ對(duì)拉螺栓對(duì)稱(chēng)排列規(guī)則 ⅱ模板對(duì)稱(chēng)排列規(guī)則ⅲ模板外側(cè)采用厚度一致的腳手管填塞ⅳ冷卻塔環(huán)基模板加固圖i. Symmetry arrangement for split bolts are regular。為此,在施工過(guò)程中應(yīng)重點(diǎn)控制:Measuring amp。建筑專(zhuān)業(yè)施工工藝策劃第一章 基礎(chǔ)工程Chapter 1 Foundation Works施工工藝控制要點(diǎn) Control Essentials for Construction Procedures本施工工藝主要控制的關(guān)鍵環(huán)節(jié):定位放線(xiàn)、模板拆裝、預(yù)埋件安裝、混凝土澆筑、混凝土養(yǎng)護(hù)、箱型地下室的滲漏、大體積混凝土的溫控措施。 installing of formwork, installing of embedded parts, casting of concrete, curing of concrete, seepage of box basement and bulkmass concrete’s temperature control measures. Controlling of PositionFixing測(cè)量放線(xiàn)是保證基礎(chǔ)結(jié)構(gòu)外形尺寸滿(mǎn)足設(shè)計(jì)要求的前提,一旦出現(xiàn)問(wèn)題將造成較大事故。 Installing of Formwork模板拆裝工藝是影響基礎(chǔ)截面尺寸、保證基礎(chǔ)邊角順直、表面平整的重要因素:The procedure of dismantling amp。 iv. Reinforcement picture of ring foundation for cooling tower 、養(yǎng)護(hù) Casting and Curing of Foundation Concrete基礎(chǔ)表面光滑平整度好smoothness and good planeness of foundation surface of Box Basement Structure混凝土板墻止水凹槽處理treatment of waterseal fillister for concrete siding wall Finished Product Protection 基礎(chǔ)棱角常常遭到機(jī)械碰撞,采用木模板制作包角是目前較為簡(jiǎn)單可行的方案。 foursquare and there is no crackle。 iii. Appearance of plain concrete framework structure of Fu Gu Power Plant。 ii. Crest line of the steel retainer is justified, smooth and straight。The contr
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1