【正文】
80312114434431413164164111031631613174174198833416235062538747947931759359376311311171857157165457457181645545527281357135716421863186328291046104642414064062922123512354126300150293011531153262554454430969935025192822822931123612361918745745313210751075192080080032288818812017112811283336121312132423791400363598998923209159153534128712872021278278343387887821105225223637769769103107910793732109710972122964964323357457422277037033743573573272357328643401322661229964964384111641164910998998403812901290總計(jì)算長(zhǎng)度:44131m393813941394403925661283表23各管段沿線流量計(jì)算結(jié)果(表24)管段編號(hào)各管段計(jì)算長(zhǎng)度/m比流量L/(s*m)沿線流量L/M125342161137161519415148031413164131741232533175931718571181645516421863424140641261502625544251928219187451920800201711282423400232091520212782110522103107921229642227703272328622996491099834440457445125481211443111031698416874797631165457272813572829104629221235293011533093502931123631321075322888133361213363598935341287343387836377693732109732335743743573434066138311164403812903839139439401283表24管段中任一點(diǎn)的節(jié)點(diǎn)流量等于該點(diǎn)相連各管段的沿線流量總和的一半,qi=α∑q1 α: 折算系數(shù)取α=節(jié)點(diǎn)流量計(jì)算下表(表25)節(jié)點(diǎn)連接管節(jié)點(diǎn)流量L/S集中流量節(jié)點(diǎn)總流量L/S1111319022221633133344443551554666577788887999929301010101011021111111110121212111313131414141141515151151616161611611642171717117201818118118191919119192520201201202202321212121222222222222222923232322327242422425252512522526262622641272722722728282822822832292922922929313030302931312313313832322323323323733333333333634343343535353353636363363363737373374338383383384095393933940404034034043414124142424214241434334340表25 管網(wǎng)平差,分配步驟:① 按照管網(wǎng)主要方向,初步擬定各管段的水流方向,并選定整個(gè)管網(wǎng)的控制點(diǎn)。則水廠自用水量為: W3=Qd5%=5%= m34. 安全儲(chǔ)水量計(jì)算 清水池的安全儲(chǔ)水量一般可按以上按部分的1/6計(jì)算。 L/ m2 計(jì),由于面積太大澆灑面積按總面積的5%算Q5=5900020%1031042 Q=1000030%2103104 (Q5+Q)5%=1800(m3/d)按最高日用水量的18%計(jì)算。表11分區(qū)人口密度(人/公頃)面積(公頃)人口數(shù)(人)Ⅰ30023470200Ⅱ40027501100000杭州位于浙江省,位于一區(qū),為特大城市,參考《給水排水管道系統(tǒng)》教材表42, 取綜合生活用水定額為350L/(人連接管的間距考慮在800-1000m左右。③ 干管盡量靠近大用戶,減少分配管的長(zhǎng)度。城市給水管網(wǎng)的布置取決于城市的平面布置、水源、調(diào)節(jié)構(gòu)筑物的位置、大用戶的分布等。1) 排水體制選擇2) 城市排水管網(wǎng)定線的說明;3) 設(shè)計(jì)流量計(jì)算;4) 控制分支管及總干管的水力計(jì)算;5) 任選1條雨水管路的水力計(jì)算(若體制為分流制);6) 繪圖(平面圖、縱剖面圖)四、設(shè)計(jì)參考資料《給排水設(shè)計(jì)手冊(cè)》第一冊(cè)或《給排水快速設(shè)計(jì)手冊(cè)》第5冊(cè)《給排水管道系統(tǒng)》教材五、設(shè)計(jì)成果設(shè)計(jì)說明書一份(包括中英文前言、目錄、設(shè)計(jì)計(jì)算的過程、總結(jié))城市給水排水管道總平面布置圖1張,比例尺為1:10000(1號(hào)圖);給水管網(wǎng)等水壓線圖1張(2號(hào)圖);污水總干管縱剖面圖1張(由指導(dǎo)教師指定某一段,長(zhǎng)度大約1000米左右)(2號(hào)圖);六、要求按正常上課嚴(yán)格考勤;設(shè)計(jì)說明書要求條理清楚,書寫端正,無錯(cuò)別字;圖紙線條、符號(hào)、字體符合專業(yè)制圖規(guī)范);按時(shí)完成設(shè)計(jì)任務(wù)七、其他:設(shè)計(jì)時(shí)間:20122013學(xué)年第一學(xué)期(第117周 12月12號(hào)12月28號(hào))上交設(shè)計(jì)成果時(shí)間: 17周周五下午設(shè)計(jì)指導(dǎo)教師: 張奎、譚水成 、劉萍、余海靜第2章 給水管網(wǎng)設(shè)計(jì)與計(jì)算 給水管網(wǎng)布置及水廠選址該城市有一條自東向西河和自南向北轉(zhuǎn)向西流的水量充沛,水質(zhì)良好的河流,可以作為生活飲用水水源。3) 火車站用水量為 L/s。s basic cities give the water sewerage system the detailed putation and the raise certain theoretical analysis and the design ability. Enhances the plan the parison, the technical economy, the environment, the society and so on the various aspects generalized analysis and proves the puter operation and application ability. Skilled specialized software application.河南城建學(xué)院目 錄第1章 課程設(shè)計(jì)任務(wù)書 2第2章 給水管網(wǎng)設(shè)計(jì)與計(jì)算 4 給水管網(wǎng)布置及水廠選址 4 給水管網(wǎng)設(shè)計(jì)計(jì)算 5 清水池調(diào)節(jié)容積 8 管網(wǎng)水力計(jì)算 10 管網(wǎng)平差 15 消防校核 29第3章 污水管網(wǎng)設(shè)計(jì)與計(jì)算 38 污水管道的定線 38 污水設(shè)計(jì)流量計(jì)算 38 污水管道水力計(jì)算 39第4章 雨水管網(wǎng)設(shè)計(jì)與計(jì)算 42 雨水管段定線 42 42 43設(shè)計(jì)總結(jié) 45附錄 參考文獻(xiàn) 46第1章 課程設(shè)計(jì)任務(wù)書河南城建學(xué)院0244092班《給水排水管道系統(tǒng)》課程設(shè)計(jì)任務(wù)書一、 設(shè)計(jì)題目: 杭州 市給水排水管道工程設(shè)計(jì)。ForewordWater drains, water supply and drainage project is an important ponent of the project can be divided into drains and water supply pipeline project works two categories.Water pipeline project is on the upgrading of water, transmission, storage, distribution and regulation of science. Its most basic task is to ensure that the raw water source sent to the water treatment structures and water users with the water quality standard transmission and distribution to users. This task through the pump stations, pipelines, distribution mains network structure and regulation and other facilities to work together to achieve, and they formed a water pipeline project. Design and management is a basic requirement for at least the construction costs and management fees to ensure that the necessary water users and pressure to ensure water quality and safety, reduce leakage and achieve the required reliability.Water drainage network project is a water supply and drainage project in the very important ponent of the needs (building) there is also a great investment, the general water supply and drainage works about a total investment of 50% to 80