【正文】
. According to the template install spell number ... Structures in fairfaced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fairfaced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and pletes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rustproof zinccoated steel wire, tie all steel wire head第25頁。 15.2作業(yè)面上泵送管的架設(shè):泵送管伸入作業(yè)面后,用彎管轉(zhuǎn)向各流水段。 14.1泵送混凝土的原材料質(zhì)量,特別是骨料的粒徑、含水量、含泥量應(yīng)經(jīng)常檢測;施泵中也應(yīng)對混凝土拌合物的泌水性、含氣量、凝結(jié)時間、坍落度等進行定時抽樣檢測。 除應(yīng)嚴格遵照國家標準鋼筋混凝土工程施工及驗收規(guī)范)和建筑工程質(zhì)量檢驗評定標準)有關(guān)規(guī)定執(zhí)行外,并應(yīng)突出如下質(zhì)量管理要求。 13.1混凝土澆筑完畢后應(yīng)立即覆蓋一層塑料布進行保濕養(yǎng)護,隨澆隨蓋。用作評定結(jié)構(gòu)或構(gòu)件混凝土強度質(zhì)量的試件,應(yīng)在澆筑地點取樣、制作,且混凝土的取樣、試件制造、養(yǎng)護和試驗均應(yīng)符合國家現(xiàn)行標準《混凝土強度檢驗評定標準》的有關(guān)規(guī)定。(2)混凝土強度的檢驗評定,應(yīng)符合國家現(xiàn)行標準《混凝土強度檢驗評定標準》的規(guī)定。原材料的儲備量,應(yīng)滿足混凝土泵送要求。當輸送管內(nèi)尚有1Om左右混凝土?xí)r,應(yīng)將壓縮機緩慢減壓,防止出現(xiàn)大噴爆和傷人。(1)泵送將結(jié)束時,應(yīng)估算混凝土管道內(nèi)和料斗內(nèi)儲存的混凝土量及澆搗現(xiàn)場所欠混凝土量(),以便決定拌制混凝土量。在澆筑混凝土?xí)r,應(yīng)經(jīng)常觀察,當發(fā)現(xiàn)混凝土有不密實等現(xiàn)象時,應(yīng)立即采取措施予以糾正。(4)混凝土澆筑分層厚度,宜為300~500mm。3)當不允許留施工縫時,區(qū)域之間、上下層之間的混凝土澆筑間歇時間,不得超過混凝土初凝時間。十.泵送混凝土的澆筑。(25)泵送完畢時,應(yīng)將混凝土泵和輸送管清洗干凈。3)慢速間歇泵送時,應(yīng)每隔4~5min進行4個行程的正、反泵。重新泵送前,應(yīng)先排除管內(nèi)空氣后,方可擰緊接頭??上扔媚鹃城脫糨斔凸軓澒堋㈠F形管等部位,并進行慢速泵送或反泵,防止堵塞。(15)泵送混凝土?xí)r,水箱或活塞清洗室中應(yīng)經(jīng)常保護充滿水。當混凝土供應(yīng)不及時,要降低泵送速度,泵送暫時中斷時,攪拌不應(yīng)停止。泵送速度,應(yīng)先慢后快,逐步加速。1)泵送水泥漿。(9)泵送管道的水平換算距離總和應(yīng)小于設(shè)備的最大泵送距離。避免吸入效率低,容易吸入空氣而造成塞管,太多則反抽時會溢出并加大攪拌軸負荷。(3)泵送混凝土?xí)r,混凝土泵的支腿應(yīng)完全伸出,并插好安全銷。.混凝土的泵送。(3)澆筑混凝土?xí)r,鋼筋骨架一旦變形或移位,應(yīng)及時糾正。(3)布料設(shè)備不得碰撞或直接擱置在模板上,手動布料桿下的模板和支架應(yīng)加固。2)應(yīng)根據(jù)結(jié)構(gòu)平面尺寸、配管情況和布料桿長度,布置布料設(shè)備,且其應(yīng)能覆蓋整個結(jié)構(gòu)平面,并能均勻、迅速地進行布料。(11)當輸送高度超過混凝土泵的最大輸送距離時,可用接力泵(后繼泵)進行泵送。5)管道接頭卡箍處不得漏漿。在墻及柱上每節(jié)管不得少于1個固定點;在每層樓板預(yù)留孔處均應(yīng)固定。(5)泵送施工地下結(jié)構(gòu)物時,地上水平管軸線應(yīng)與V形管出料口軸線垂直。應(yīng)使用無龜裂、無凹凸損傷和無彎折的管段。(2)在同一條管線中,應(yīng)采用相同管徑的混凝土輸送管;同時采用新、舊管段時,應(yīng)將新管布置在泵送壓力較大處;管線宜布置得橫平豎直。.配管設(shè)計。.混凝土泵設(shè)置處,應(yīng)場地平整堅實,道路暢通,供料方便,距離澆筑地點近,便于配管,接近排水設(shè)施和供水、供電方便。 總壓力損失,應(yīng)小于混凝土泵正常工作時的最大出口壓力。.混凝土泵的最大水平輸送距離,可按下列方法之一確定:(1)由試驗確定。(6)嚴禁將質(zhì)量不符合泵送要求的混凝土入泵。(2)喂料時,翻轉(zhuǎn)卸料應(yīng)配合泵送均勻運行,且應(yīng)使混凝土保持在集料斗內(nèi)高度標志線以上。.混凝土攪拌運輸車在運輸途中,拌筒應(yīng)保持在3~6r/min的慢速轉(zhuǎn)動。危險區(qū)域,應(yīng)設(shè)警戒標志。七、泵送混凝土的運送.泵送混凝土宜采用攪拌運輸車運送。并應(yīng)根據(jù)施工進度需要,編制泵送混凝土供應(yīng)計劃,加強通訊聯(lián)絡(luò)、調(diào)度,確保連續(xù)均勻供料。(2)現(xiàn)場取樣時,應(yīng)以攪拌車卸料1/4后至3/4前的混凝土為代表。.設(shè)備試運轉(zhuǎn)正常,混凝土運輸車輛數(shù)量滿足要求。值班鋼筋工1人,負責(zé)鋼筋移位及糾偏。電工1人,負責(zé)電氣及照明。砼泵車操作3人,泵機操作及保養(yǎng)。3.5.7泵管所有轉(zhuǎn)彎處必須予以適當加固,沿管道振動方向加設(shè)支托。3.5.5澆筑樓面水平輸送管布置時,宜將輸送管鋪設(shè)于架空馬道上,此時端部接軟管布料能使?jié)矒v覆蓋面大,并可降低勞動強度,亦可避免裝拆管道時踩蹋鋼筋。 3.5.2垂直向上配管時,宜使地面水平管長度不小于垂直管長度的1/4,且不宜小于1m,并應(yīng)在一定位置設(shè)截止閥。3.5泵管的布置尚應(yīng)使混凝上滿足可泵性要求。3.2.5外加劑可增加混凝土坍落度和延長初凝時間.其技術(shù)標準按有關(guān)現(xiàn)行的國家標準