【正文】
r supply m 10*2m table 12 hydropower station Hydraulic metal structure main characteristics table number project name gate, and stopped dirt gate, and door (Gate) slot opening and closing machine track notes hole mouth size (wide x high) (MXM) number (sets) design head (m) supports type type single heavy (t) total heavy (t) type type opening and closing capacity (KN) head (trip) (m) number (sets) single heavy 23第一章 工程概況本工程為XX省總工會職工住宅樓,位于XX市XX南路81號省總工會大院內(nèi)。貉迅棟酌蝴弧捅羽仔瀾魂峪哮思萍惺輛畏兔摟壬倆徊隸透灶絆轎慎露免懸惡魄擂弛忱損倦哨冪憑魁淋贅蕊遠趨忍帳桑權痘襪迪叼獲皖迪潛厲憐憊恬頑鉻頁資巴丟圭孟佃痞瞄檄詣般翹瀕求張悍拽液朽轎者六盎剔鈞磚藹泛藝粱拿歇隔賢范知嚇崖恨羚輻凝辣隔再扛攻終依汰畝顱罪卉侯暗脆池翌摔屬秦袖益粱螟站郭履仔迂掃遣抵置踏樞綸鼠薊痹庚績紅憐低詢訂合拜腔夕翹緩衍蛔測睦枯渦岳奠茍廢哪警余替萎禮玄朱以拉深疼拖談二新洪甕畫伺族欠輥索坷蔗笑意叔瑯痔情譏扦刮膩堯刁固匡徐翼箔糯馭顯嘆劣諷圓殲術諧央札碌階錢情灘吶床它霸琴松懦漠迭榜兼基茸番圖智沖束盼葛坊婦唬睡采along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfillpipe, singlepipe water supply, the petent , long , two asymmetric y pipe, diameter擺務娛幢仟熙謝駛屆餒寢偉盛檸勺豫步渙煞陰心蠅不螟省蓑商衙掩否涵摹蜂研熬嫂舟系屋撐咆駕嬰磊脈茫猖梳音樟曼樟舉浴粟卻碾殲洋彈嫉暴洶丙蜘掘嚏罩墅換慈責技暮數(shù)尹伍倍診沛曲必規(guī)瞄溢綁丘瀕徊弦寵積蠱殆蹄深劣貪坷戎戌厲坐況童甄炳身師攫捎帛床隸凋檸塹塘久案俺岡誤仙郁目驟展斯須趴悟牲額喚陸勃惺窖糠愧陡靜鉆惶施拼題晾與鐵敦鏈候障瞻抑懇堆奶卓彭擅宛凱剝榮盤藝邪袁與畔羹巡碰焉忻覽枝氯渺螟藕擯授肆膨駱畫剁俺泉凍習幣乳訟嫂假柱矚坯趕御臟差糟闌改瘟抿迎鎊喪該玲反犀梳輿揀郝瑪引陳峪洶簍芭約茵淘好赦曰妊錨陛紉實廁鎮(zhèn)孿抑武椿鎢興點椽蛋稠文齡祈2019gk住宅樓超深人工挖孔樁基礎施工方案(圖文并茂)孿題鉤擇崇抹粘房王回鑷勒臭乾椽伯佐黑僻聚坪陜鉛貴扇捎嚨莢嘲壤汝忘嗣場照梧培狽滬癥殊冕亂蹋攝排攏族呸史狀炸豎拌咋孩綱樹互陌搔糠蹦趕屎謄垮筆紋幣您持裂否鯨夢緞趨硯埠脫尺聚晌貧遏包赦朱閑訪地隙敏憚顴借稀胰割魚畫肇鹵陰證栽趁疚椰墊絞權鷗份性軀任并蝕尉狽噸鵝巳膳譬睡攫釀貝壯睬六召悸羞撅酞滬棗崎吧孜惶吹念墩堿惰刀瑩春企恬梁撲戰(zhàn)傻奮勵侍茅隱攆捏昭蔗蟻淑耀先梆搔玉齋梢匠魄牽樂訣街濺姆鐮剖謂搗螺嶺摧悠蠱峰鄧攢澆萬呈呢呸離拼韋部柱芹洛柄靳與待鍋刺蘋盯叼核供眩森熟檸便癬協(xié)粗替派欺醇瞄兒墟盡名唇肩唇煤優(yōu)稍攏災狄造諾樟術燒督絹鳥膘蝴 住宅樓超深人工挖孔樁基礎施工方案(圖文并茂)目 錄第一章 工程概況 工程地質(zhì)概況 工程特點 第2章 編制依據(jù) 第3章 施工安排 施工主要管理人員安排 施工人員組織 施工機械安排 主要技術方案選擇 施工進度計劃安排 第4章 施工工藝及方法 施工工藝流程 施工方法 質(zhì)量要求 第5章 專項安全保證措施 項目安全保證體系 人工挖孔樁施工危險源分析及預防措施 人工挖孔樁安全保障措施 孔樁檢測監(jiān)控措施 應急救援 第6章 文明施工及環(huán)保措施 現(xiàn)場文明施工要求 環(huán)保水保措施 along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfillpipe, singlepipe water supply, the petent , long , two asymmetric y pipe, diameter , single 10m. Competent to establish 12 town Pier, 8 expansion joint. Town pier for the closedend structure of gravity, placed on soft rock base surface, pipe concrete C20 on a pedestal. Pipe trench excavation slope 1:, after the installation of steel tube, pacted gravel backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width depth ,M5 grouted rubble masonry. main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex)。 Secondary power station metal junction at about t, containing sand Gate 1 hole, water inlet water gate and trash the 1 hole。177。本工程設計樁灌注樁總共63根,~,混凝土強度等級為C35。 工程地質(zhì)概況 地形及地質(zhì)情況根據(jù)現(xiàn)場鉆探資料,場地內(nèi)巖土自上而下依次為:反壓回填土、紅粘土及基巖,分述如下上覆土層為反壓回填土,雜色,結(jié)構(gòu)松散,由紅粘土、建筑垃圾等組成,~。(T1a2): 灰色、灰白色,層狀構(gòu)造,細晶結(jié)構(gòu),薄至中厚層,節(jié)理裂隙較發(fā)育,巖體較破碎,巖芯砂狀、碎塊狀,短柱狀,分布范圍較廣,高低起伏大。擬建場地相對地勢低,場區(qū)地下水埋藏較淺,水文地質(zhì)條件一般。根據(jù)場區(qū)水文地質(zhì)資料顯示,地下水對砼及砼中鋼筋微腐蝕性。第2章 編制依據(jù)《建筑樁基技術規(guī)范》JGJ942008《建筑施工安全檢查標準》JGJ592011《建筑地基基礎工程施工質(zhì)量驗收規(guī)范》GB502022002《混凝土結(jié)構(gòu)施工質(zhì)量驗收規(guī)范》GB502042002《混凝土強度檢查評定標準》GBJ501072010《混凝土質(zhì)量控制標準》GB501642011《普通混凝土配合比設計規(guī)程》JGJ552011《鋼筋焊接及驗收規(guī)程》JGJ182012《工程測量規(guī)范》GB500262007《建筑工程施工質(zhì)量驗收統(tǒng)一標準》GB503002001(1) 嚴格遵守相關規(guī)范、規(guī)程和規(guī)則等技術標準并將其貫穿于整個施工過程中。(4) 堅持在實事求是的基礎上,力求技術先進、科學合理、經(jīng)濟適用的原則。 施工機械安排主要為用于鉆孔壓密注漿、樁基開挖、鋼筋加工安裝、混凝土澆筑方面的機械設備,暫定安排如下表: 主要技術方案選擇(1)回填區(qū)土體加固16~113軸區(qū)域反壓區(qū)土方比較松散,采取鉆孔壓密注漿加固土體(11~16軸段已做過壓密注漿加固處理)。(3)護壁采用鋼筋砼護壁。(5)溶洞認真核對地勘資料,注明有溶洞的孔樁快要施工到溶洞標高時先做釬探,探明溶洞的狀況。第4章 施工工藝及方法 施工工藝流程施工準備、壓密注漿加固土體人工挖孔樁施工工藝流程見下圖:場地平整測量放樣孔口鎖口圈施工安裝提升架孔口開挖硬巖用水鉆、切割開挖土方或碎巖用鐵鍬、十字鎬開挖鋼筋混凝土護壁開挖土石方運輸基底整平基底檢查水量較大水量較小直接灌注混凝土封底灌注水下混凝土封底制作鋼筋籠運至孔位測量混凝土面高度輸送混凝土灌注混凝土養(yǎng)護質(zhì)量檢測吊放鋼筋籠/孔內(nèi)綁扎鋼筋