【正文】
設(shè)計(jì)通則》(GB 50352—2005)《辦公建筑設(shè)計(jì)規(guī)范》(JGJ6789) 《屋面工程技術(shù)規(guī)范》(GB503452004) 《建筑滅火器配置設(shè)計(jì)規(guī)范》(GBJ14090)《工程建設(shè)標(biāo)準(zhǔn)強(qiáng)制條文》2002版(房屋建筑部分):(1)工程名稱:滄州市某辦公樓設(shè)計(jì)方案一(2)建設(shè)地點(diǎn):滄州(3)建設(shè)單位:市建工集團(tuán)(4)建筑占地面積:㎡,總建筑面積:㎡ (5)結(jié)構(gòu)類型:混凝土框架結(jié)構(gòu)(6)抗震設(shè)計(jì)等級(jí):二級(jí) ,設(shè)計(jì)使用年限:50年(7)建筑層數(shù):6層,建筑高度: (8)屋面防水等級(jí):二級(jí) (9)抗震設(shè)防烈度:七度(10)本工程定位詳總平面定位圖。本建筑為辦公樓,采用現(xiàn)澆鋼筋混凝土框架結(jié)構(gòu)。最高氣溫39℃,最低氣溫15℃。進(jìn)而計(jì)算在豎向荷載(恒載及活荷載)作用下的結(jié)構(gòu)內(nèi)力,通過(guò)內(nèi)力組合,選取最不利工況計(jì)算框架梁、柱配筋,繪制工程圖紙,包括:主要建筑圖、結(jié)構(gòu)平面布置圖,一榀框架配筋圖等,整理結(jié)構(gòu)計(jì)算書,形成較為完整的工程結(jié)構(gòu)設(shè)計(jì)文件?;撅L(fēng)壓:、基本雪壓:。畢業(yè)設(shè)計(jì)要求我們?cè)谥笇?dǎo)老師的指導(dǎo)下,獨(dú)立系統(tǒng)的完成一項(xiàng)工程設(shè)計(jì),解決與之有關(guān)的所有問(wèn)題,熟悉相關(guān)設(shè)計(jì)規(guī)范、手冊(cè)、標(biāo)準(zhǔn)圖以及工程實(shí)踐中常用的方法,具有實(shí)踐性、綜合性強(qiáng)的顯著特點(diǎn)。 Structural reinforcement.vi目 錄摘 要 iABSTRACT ii目 錄 iii1緒論 12工程概況 2 2 2: 2: 2 3 3 3 33結(jié)構(gòu)布置方案 4 4 4 4 5 6 64荷載統(tǒng)計(jì) 7 7 8 9 95橫向框架側(cè)移剛度計(jì)算 11 橫梁線剛度的計(jì)算 11 11 11 126橫向水平地震作用下框架結(jié)構(gòu)側(cè)移和內(nèi)力計(jì)算 13 13 13 13 14 15 15 167橫向框架豎向荷載的內(nèi)力計(jì)算 19 橫向框架內(nèi)力計(jì)算 19 19 19 21 228橫向框架內(nèi)力組合 32 32 32 33 33 36 419截面設(shè)計(jì) 46 框架梁截面設(shè)計(jì) 46 46 60 框架柱截面設(shè)計(jì) 61 61 61 63 65: 65: 6610基礎(chǔ)配筋計(jì)算 72 72 73 73 73(取設(shè)計(jì)值) 74: 74 74 7411板式樓梯計(jì)算 76: 76 76: 77 77: 78 7912雨篷設(shè)計(jì) 80: 80 80 80結(jié) 論 81致 謝 82參考文獻(xiàn) 83北京交通大學(xué)海濱學(xué)院畢業(yè)設(shè)計(jì)(論文)1緒論此次畢業(yè)設(shè)計(jì)我的做的課題為滄州市某政府辦公樓設(shè)計(jì),我要在設(shè)計(jì)過(guò)程中運(yùn)用大學(xué)期間學(xué)到的各項(xiàng)知識(shí),并利用EXCEL、CAD、天正建筑、天正結(jié)構(gòu)、PKPM等相關(guān)軟件進(jìn)行計(jì)算,通過(guò)這個(gè)過(guò)程我不僅能學(xué)到設(shè)計(jì)相關(guān)的知識(shí),還能了解框架結(jié)構(gòu)的特點(diǎn)和設(shè)計(jì)方法等。 And then makes it to be sure that the constant load, live load, wind load, earthquake effect, calculation beams and columns, board and foundation of the internal force redistribution of the force after each section of bination to get control internal force based on the construction practice。iABSTRACTGraduate design is the most important step in the teaching of Civil Engineering Major. Its main purpose is to cultivate students39。本工程以手算優(yōu)先,用結(jié)構(gòu)專業(yè)輔助軟件PKPM進(jìn)行驗(yàn)算。畢業(yè)設(shè)計(jì)特別應(yīng)強(qiáng)調(diào)理論聯(lián)系實(shí)際,提高學(xué)生分析、解決工程實(shí)際問(wèn)題的能力,注重培養(yǎng)學(xué)生踏實(shí)、細(xì)致、嚴(yán)格、認(rèn)真和吃苦耐勞的工作作風(fēng)。其主要目的是培養(yǎng)學(xué)生綜合應(yīng)用所學(xué)基礎(chǔ)理論和專業(yè)知識(shí)、基本技能,進(jìn)一步提高和訓(xùn)練學(xué)生的工程制圖、理論分析、結(jié)構(gòu)設(shè)計(jì)、計(jì)算機(jī)應(yīng)用和外文閱讀能力。本辦公樓為六層鋼筋混凝土框架結(jié)構(gòu)。關(guān)鍵詞:設(shè)計(jì);荷載計(jì)算;框架結(jié)構(gòu);結(jié)構(gòu)配筋。 working style in downtoearth effort, attentiveness, strict and hardwork. The graduation design enables students to understand construction design and construction contents of industrial and civil building prehensively and also makes students familiar with relevant standards, procedures, quotas, manual and reference books, which make a foundation for the future work.The graduation design including two parts: building design and structure design. This office building is designed into six layer reinforced concrete frame structure, m’ long, m’ width, ’ high. This project is preferred to hand putation, with the help of auxiliary equipment software PKPM to calculate the whole area of steel bar. The picture is drawled in accordance with the area of rebar frame.The ③framework is the task of the hand count, making its calculation diagram and all the calculated parameters clear。Reinforced concrete frame。要養(yǎng)成搜集資料和查閱資料的以及分析資料的習(xí)慣,鍛煉自我外文翻譯能力,主體為:鋼筋混凝土框架結(jié)構(gòu),共六層,抗震設(shè)防烈度為7度,場(chǎng)地類別為Ⅱ類場(chǎng)地。在建筑方案設(shè)計(jì)的基礎(chǔ)上,選取正確合理的結(jié)構(gòu)形式、結(jié)構(gòu)體系和結(jié)構(gòu)布置。建筑物所在地區(qū)抗震設(shè)防烈度為7度,持力層為輕亞粘土,Ⅱ類場(chǎng)地。本圖尺寸除標(biāo)高以米計(jì)外,其余均以毫米計(jì)。:(1)、市建設(shè)局、國(guó)家及地方的規(guī)范要求,甲方的要求。彩色廣場(chǎng)磚: 細(xì)砂找平20mm二道SBS防水層,水泥珍珠巖找平100mm,SBS 隔氣層,水泥砂漿找平層20mm,EPS板鋼,筋 凝 土 板100厚,混 合 砂 漿 20mm 厚。(3)刷冷底子油一道,熱瀝青二道防潮。3結(jié)構(gòu)布置方案圖31 柱網(wǎng)布置豎向荷載的傳力途徑:樓板的荷載經(jīng)次梁間接或直接傳至主梁,再由主梁傳至框架柱,最后傳至基礎(chǔ)。各層重力荷載代表值近似取12KN/m2。兩軸線取至板底,2~6層柱的高度即為層高。門為木門。梁采用混凝土的設(shè)計(jì)強(qiáng)度為C25(fc= N/mm2,ft=)。設(shè)計(jì)地震分組為第二組,抗震等級(jí)為二級(jí),Tg=。計(jì)算結(jié)果如表6表6 各質(zhì)點(diǎn)橫向水平地震作用及樓層地震剪力計(jì)算表層次(KN)(m)(KN表10 梁端彎矩剪力計(jì)算層次AB跨梁BC跨梁LL635343332313表11 柱軸力計(jì)算層次柱軸力654321邊柱(KN)32.中柱 (KN)水平地震作用下框架的彎矩圖梁端剪力圖及柱軸力圖如圖所示:圖61 框架彎矩圖圖62 梁端剪力及柱軸力圖7橫向框架豎向荷載的內(nèi)力計(jì)算 橫向框架內(nèi)力計(jì)算 計(jì)算單元?、圯S線橫向框架進(jìn)行計(jì)算,如圖所示, 圖71 橫向框架計(jì)算單元 荷載計(jì)算在圖中,代表梁的自重,為均布荷載形式。表12 豎向恒載作用下框架梁端彎矩計(jì)算(KNm)圖733 豎向活載作用下的彎矩二次分配單位 (KN計(jì)算柱底軸力還需考慮柱的自重,如表16,17和表18,19所示。8橫向框架內(nèi)力組合內(nèi)力組合時(shí),應(yīng)考慮內(nèi)力調(diào)整。在水平荷載作用下,端截面還有正彎矩,而跨中控制截面常是最大正彎矩作用處,因而要進(jìn)行內(nèi)力換算求得梁邊緣截面處的彎矩和剪力。柱的最大彎矩值出現(xiàn)在柱兩端,剪力和軸力值在同一樓層內(nèi)變化很小,因此,柱的設(shè)計(jì)控制截面為上下兩端截面,即梁的上下邊緣。取每層柱頂和柱底兩個(gè)控制截面,同梁進(jìn)行組合,組合結(jié)果及柱端彎矩設(shè)計(jì)調(diào)整見(jiàn)表。 (77)則可由下式求解: (78) (79)例如一層AB跨梁上荷載設(shè)計(jì)值 左震 又剪力計(jì)算:AB凈跨 左震 右震 則 梁的內(nèi)力組合表表22 荷載作用在AB跨梁截面內(nèi)力恒荷載①活荷載②風(fēng)荷載①+②①+④①+②①+(②+③)①+②+③①+②+③③④A6B6左MV跨中M右MVA5B5左MV跨中M右MVA4B4左MV跨中M續(xù)表22梁截面內(nèi)力恒荷載①活荷載②風(fēng)荷載①+②①+④①+②①+(②+③)①+②+③①+②+③③④右MVA3B3左MV跨中M右MVA2B2左MV跨中M右MVA1B1左MV跨中M續(xù)表22梁截面內(nèi)力恒荷載①活荷載②風(fēng)荷載①+②①+④①+②①+(②+③)①+②+③①+②+③③④A1B1右MV表23 荷載作用在BC跨梁截面內(nèi)力恒荷載①活荷載②風(fēng)荷載①+②①+④①+②①+(②+③)①+②+③①+②+③③④B6C6左MV跨中M右MVB5C5左MV跨中M右MVB4C4左MV跨中M右MV續(xù)表23