【正文】
e tank 儲(chǔ)罐組裝 Assembly of Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 儲(chǔ)罐焊接 Storage tank welding 儲(chǔ)罐焊接 Storage tank welding 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程、絕熱工程 Installation of platform ladder。 painting work。 painting work。 painting work Txxb6 儲(chǔ)罐安裝工程 Txxb6 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 儲(chǔ)罐焊接 Storage tank welding 儲(chǔ)罐焊接 Storage tank welding 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程 Installation of platform ladder。 painting work。 painting work。 painting work 5 單位工程 Unit work 分部工程 Division work 分項(xiàng)工程 Section work Txxa31 儲(chǔ)罐安裝工程 Txxa31 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 罐底組裝、罐頂組裝、罐壁組裝 Asssembly of tank bottom, tank top and tank wall 儲(chǔ)罐焊接 Storage tank welding 罐底焊接、罐頂焊接、罐壁焊接 Welding of the tank bottom, tank top and tank wall 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程 Installation of platform ladder。 painting work Txxa22 儲(chǔ)罐安裝工程 Txxa22 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 儲(chǔ)罐焊接 Storage tank welding 儲(chǔ)罐焊接 Storage tank welding 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程 Installation of platform ladder。 painting work Txxx6 儲(chǔ)罐安裝工程 Txxx6 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 罐底組裝、罐頂組裝、罐壁組裝 Asssembly of tank bottom, tank top and tank wall 儲(chǔ)罐焊接 Storage tank welding 罐底焊接、罐頂焊接、罐壁焊接 Welding of the tank bottom, tank top and tank wall 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程、絕熱工程 Installation of platform ladder。 painting work Txxx1 儲(chǔ)罐安裝工程 Txxx1 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 罐底組裝、罐頂組裝、罐壁組裝 Asssembly of tank bottom, tank top and tank wall 儲(chǔ)罐焊接 Storage tank welding 罐底焊接、罐頂焊接、罐壁焊接 Welding of the tank bottom, tank top and tank wall 儲(chǔ)罐附屬工程 Subsidiary work of storage tank 平臺(tái)梯子安 裝、內(nèi)浮盤安裝、油漆工程 Installation of platform ladder。 Evaluation of Industrial Installation”GB502521994 《石油化工工程建設(shè)交工技術(shù)文件》( SH35032020) “ Technical Turnover Documents for Construction Completion of Petrochemical Project”SH35032020 《立式圓筒形鋼制焊接油罐施工及驗(yàn)收規(guī)范》( GBJ12xxa1990) “ Code on Construction and Acceptance Inspection of Vertical Type Welded Cylindrical Steel Oil Tank” GBJ12xxa1990 《石油化工設(shè)備安裝工程質(zhì)量檢驗(yàn)評定標(biāo)準(zhǔn)》( SH35142020) “ Standards of Quality Inspection/Evaluation for Installation/Erection of Petrochemical Equipment” SH35142020 3 具體劃分 Job arrangement xxx石化項(xiàng)目 xxx罐區(qū)儲(chǔ)罐安裝工程單位工程、分部工程、分項(xiàng)工程的具體劃分如下: Arrangement for unit work, division work and section work in the construction of the tanks of the intermediate and product tanks of Xxx petrochemicals project is made as follows: xxx罐區(qū)為 1個(gè)單項(xiàng)工程; The intermediate and product tanks area is defined as a single work; 3 每個(gè)儲(chǔ)罐安裝工程為 1個(gè)單位工程; The installation work of each storage tank is defined as a unit work; 每個(gè)儲(chǔ)罐安裝工程劃分為 3個(gè)分部工程:儲(chǔ)罐組裝、儲(chǔ)罐焊接、儲(chǔ)罐附屬工程; The installation work of each storage tank is divided into 3 section work: assembly of storage tank, welding of storage tank, auxiliary work of storage tank; 每個(gè) 5000m3以下的儲(chǔ)罐劃分為 4個(gè)(或 5個(gè))分項(xiàng)工程:儲(chǔ)罐組裝、罐頂組裝、油漆工程、內(nèi)浮盤安裝(其中 9個(gè)儲(chǔ)罐有)、絕熱工程; Each of the storage tanks with volume under 5000 m3 is divided into 4 (or 5) section work: assembly of storage tank, assembly of the tank top, painting work, the installation of internal floating plate of 9 storage tanks thereof, heat insulation work。 1 儲(chǔ)罐安裝工程單位、分部、分項(xiàng)工程的劃分 Unit Work, Devision Work and Section Work For Tank Istallation of the Intermediate and Products Tanks 2 1 目的 PURPOSE 便于 xxx石化項(xiàng)目的 xxx罐區(qū)的施工質(zhì)量管理、交工文件的編制。 The Individual Work of CCC is Intermediate tanks area. 2 依據(jù) Reference 《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》( GB503002020) “ Unified Standard for Quality Acceptance of Construction Work” GB503002020 《工業(yè)安裝工程的質(zhì)量檢驗(yàn)評定統(tǒng)一標(biāo)準(zhǔn)》( GB502521994) “ Unified Standard for Quality Inspection amp。 installation of internal floating deck。 painting work, insulation work 2 單位工程 Unit work 分部工程 Divisional work 分項(xiàng)工程 Section work Txxx5 儲(chǔ)罐安裝工程 Txxx5 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 罐底組裝、罐頂組裝、罐壁組裝 Asssembly of tank bottom, tank top and tank wall 儲(chǔ)罐焊接 Storage tank welding 罐底焊接、罐頂焊接、罐壁焊接 Welding of the tank bottom, tank top and tank wall 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程 Installation of platform ladder。 painting work Txxa21 儲(chǔ)罐安裝工程 Txxa21 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 罐底組裝、罐頂組裝、罐壁組裝 Asssembly of tank bottom, tank top and tank wall 儲(chǔ)罐焊接 Storage tank welding 罐底焊接、罐頂焊接、罐壁焊接 Welding of the tank bottom, tank top and tank wall 儲(chǔ)罐附屬工程 Subsidiary work of Storage tank 平臺(tái)梯子安裝、油漆工程 Installation of platform ladder。 painting work Txxa30 儲(chǔ)罐安裝工程 Txxa30 Installation work of the Storage tank 儲(chǔ)罐組裝 Assembly of Storage tank 罐底組裝、 罐頂組裝、罐壁組裝 Asssembly of tank bottom, tank top and tank wall 儲(chǔ)罐焊接 Storage tank welding 罐底焊接、罐頂焊接、