【正文】
Ig ,即:Ie≥Ig由于變壓器短時過載能力很大,雙回路出線的工作電流變化也較大,故其計算工作文關(guān) 220kV 降壓變電所電氣部分初步設(shè)計19電流應(yīng)根據(jù)實際需要確定。電器要能可靠地工作,必須按正常工作條件進行選擇,并按短路狀態(tài)來校驗熱穩(wěn)定和動穩(wěn)定。沈陽工程學(xué)院畢業(yè)設(shè)計18第四章 高壓電氣設(shè)備的選擇電器設(shè)備選擇是發(fā)電廠和變電所設(shè)計的主要內(nèi)容之一。三相短路電流穩(wěn)態(tài)有效值,用來校驗電器和載流部分的熱穩(wěn)定。通常文關(guān) 220kV 降壓變電所電氣部分初步設(shè)計17需要計算下列各種短路電流值。jsX有限電源供給的短路電流先將電源對短路點的等值電抗 ,歸算到以電源容量為基準(zhǔn)的計算電抗 ,然后NS jsX按 值查相應(yīng)的發(fā)電機運算曲線,或查發(fā)電機的運算曲線數(shù)字表,即可得到短路電流周jsX期分量的標(biāo)幺值。標(biāo)么值轉(zhuǎn)為有名值: .3NavnS= *jU?*jS*jI?*jjsXU? 網(wǎng)絡(luò)變換如下圖:Δ/Y 變換沈陽工程學(xué)院畢業(yè)設(shè)計16X1=X13X12/(X13+X12+X23)X2=X12X23/(X12+X13+X23)X3=X13X23/(X13+X12+X23)Y/Δ 變換X12=X1+X2+X1X2/X3X13=X1+X3+X1X3/X2X23=X2+X3+X2X3/X1 等值電源的計算按個別變化變換計算當(dāng)網(wǎng)絡(luò)中有幾個電源時,可將條件相類似的發(fā)電機,按下述條件連接成一組,分別求出至短路點的轉(zhuǎn)移電抗。標(biāo)幺值為各電路元件有名值與基準(zhǔn)值之比。確定短路電流時,應(yīng)按可能發(fā)生最大短路電流的正常接線方式,而不應(yīng)按僅在切換過程中可能并列運行的接線方式;選擇導(dǎo)體和電器用的短路電流,在電氣連接的網(wǎng)絡(luò)中,應(yīng)考慮具有反饋作用的異步電動機的影響和電容補償裝置放電電流的影響;選擇導(dǎo)體和電器時,對不帶電抗器回路的短路點,應(yīng)選擇在正常接線方式時短路電流最大的地點。沈陽工程學(xué)院畢業(yè)設(shè)計14第三章 短路電流計算 短路電流計算的目的:電氣主接線比較;選擇導(dǎo)體和電器;確定中性點接地方式;計算軟導(dǎo)體的短路搖擺;確定分裂導(dǎo)線間隔棒的距離;驗算接地裝置的接觸電壓、跨步電壓;選擇繼電保護裝置和進出整定計算。但當(dāng)設(shè)置了專用旁路斷路器后,設(shè)備的投資和配電裝置的占地面積都有所增加。綜合以上分析,本變電所 220kV 側(cè)選用雙母線接線方式 60kV 側(cè)接線方式的選擇與論證60kV 側(cè)采用雙母線接線和雙母線帶旁路接線。(3)經(jīng)濟性。本變電所用戶較多,負(fù)荷容量較大, 要求供電可靠性較高。但當(dāng)其一段母線故障時,整套配電裝置停止工作,在拉開分段刀閘時恢復(fù)無故障母線工作。單母線分段帶旁路母線的缺點為:接線不夠靈活。(5)在檢修任一進出線回路的斷路器時,將使該回路停電。單斷路器的雙母線接線也有自己的缺點:(1)任一臺斷路器拒動,將造成與該斷路器相連母線上其它回路的停電。(5)擴建方便。當(dāng)某一回路的一組母線隔離開關(guān)發(fā)生故障時,只要將該隔離開關(guān)所在的回路和所連接的母線停電,就可以對該隔離開關(guān)進行檢修,不影響其它回路。 對 220kV 千伏側(cè)接線方式的論證220kV 側(cè)擬采用雙母線接線和單母線分段帶旁路母線接線。 靈活性滿足運行、檢修要求和擴建要求。5)考慮備用容量的有無和大小對主接線的影響發(fā)、送、變的備用容量是為了保證可靠的供電,適應(yīng)負(fù)荷突增,設(shè)備檢修,故障停運情況下的應(yīng)急要求。應(yīng)根據(jù)負(fù)荷的大小和分布,負(fù)荷增長速度以及地區(qū)網(wǎng)絡(luò)情況和潮流分布,并分析各種可能的運行方式,來確定主接線的形式以及所連接電源數(shù)和出線回數(shù)。因此,主接線設(shè)計是一個綜合性問題。將電路中各種電氣設(shè)備統(tǒng)一規(guī)定的圖形符號和文字符號繪制成的電氣連結(jié)圖,稱為電氣主接線圖。容量的確定:P1=20220+10000+20220+5000=55000kwP2=20220+5000=25000kwPmax1=P1*Kp*=Pmax2=P2*Kp*=S1=Pmax1/cosφ1=S1=Pmax2/cosφ2=21250/=S=(S1+S2)*=*=總安裝容量為 根據(jù)以上計算可選擇兩臺型號為 SFPZ463000/220 的有載調(diào)壓變壓器。電力系統(tǒng)采用的繞組連接方式只有 Y 和△,高、中、低三側(cè)繞組組合要根據(jù)工程具體情況確定。(PZMAX 為綜合最大負(fù)荷)(3)應(yīng)根據(jù)電力系統(tǒng) 5~10 年的發(fā)展規(guī)劃進行選擇。(4)具有三種電壓的變電所,例如 220kV,110kV,35kV 一般采用三繞組變壓器。當(dāng)裝設(shè)一組單相變壓器時,應(yīng)考慮裝設(shè)備用相,當(dāng)主變超過一組,且各組容量滿足全所負(fù)荷的 75%時,可不裝設(shè)備用相。對大型樞紐變電所,根據(jù)工程的具體情況,應(yīng)安裝 24 臺主變。因此,在確保安全可靠供電的基礎(chǔ)上,確定變壓器的經(jīng)濟容量,提高網(wǎng)絡(luò)的經(jīng)濟運行素質(zhì)將具有明顯的經(jīng)濟意義。 ;無功負(fù)荷率取 。終端變電所主要由地方變電所或發(fā)電廠供電,降壓后直接向各種用電設(shè)備供電本次設(shè)計的變電所是高壓側(cè)為 220kV,低壓側(cè)為 60kV 的終端變電所文關(guān) 220kV 降壓變電所電氣部分初步設(shè)計3第二章 概 論 設(shè)計的基本要求說明本次設(shè)計的為文關(guān) 220kV 降壓變電所電氣部分初步設(shè)計,電壓等級為220/60KV,220KV 側(cè)有兩回進線,60kV 側(cè)有配出線路 12 回,并出線走廊寬闊。有些變電所考慮母線的功率因數(shù)較低,還裝有電力電容器組靜止補償裝置或調(diào)相機等設(shè)備上述設(shè)備中,除控制與信號部分,繼電保護裝置,測量儀表,控制電源和通訊等設(shè)備外,其余部分稱為一次設(shè)備,由一次設(shè)備組成的網(wǎng)絡(luò)系統(tǒng)稱為一次系統(tǒng) 變電所的分類按電壓的升降分類,分為升壓變電所和降壓變電所兩大類。由于本人水平有限,設(shè)計書中難免會有錯誤和不足之處,懇請老師批評指正。同時經(jīng)過變壓器的選擇和變電所所帶負(fù)荷情況,確定本變電所電氣主接線方案和高壓配電裝置及其布置方式,同時根據(jù)變電所的電壓等級及其在電力網(wǎng)中的重要地位進行繼電保護和自動裝置的規(guī)劃設(shè)計,最后通過對主接線形式的確定及所選設(shè)備的型號繪制變電所的斷面圖、平面圖、和主接線圖,同時根據(jù)所繪制的變電所平面圖計算變電所屋外高壓配電裝置的防雷保護。s power industry development soon, since the early 1970s, the first 300 MW unit for a few shipped to the end of 1988, the 600 MW unit has been put into operation, electricity and industrial development on a new level. Capacity building of power plants has reached 2700 MW. 330 ~ 500kv power transmission system is being gradually expanded. To the end of 1991, the total installed capacity of over 150000 MW, the generation capacity has reached billion . Power system is an important energy sector in the national economy, and the electricity substation was designed in the building industry essential to a project. Design familiar with the various protocols and design principles, the design process to address the scale and form of substations, concrete analysis of concrete problems. This paper introduced the buck, Commissioner of 220 kV electric substation of the preliminary design, design tasks from the point of view, is divided into seven steps. That is, 1, choice of the main transformer substation of the models, capacity and number of Taiwan. 2, the design of the electrical substation main connection of the basic form. 3, a shortcircuit current calculation. 4, a major electrical equipment choice. 5, the highvoltage power distribution substation planning and design of the devices. 6, the substation protection and automatic devices of the planning and design. 7, Lightning Protection of the substation planning and design, such as seven steps, this paper with the electrical design on a point of order. The design is in school during the last a very important part of a prehensive practice teaching, but also full use of our students have learned basic theories, professional knowledge to practical problems to design (or research) integrated training, is also our future Jobs and to lay the basic practice. Through this design can be enhanced by the knowledge we use to explain the actual capacity and ability to innovate in order to better meet the needs of their work. The design elements associated with the reference to the preparation, the limited level, it is inevitable there will be errors of omission, please refer to the teacher to give more criticism correction. Keyword: substations, transformers, the main electrical wiring and electrical equipment, protection, mine protection.文關(guān) 220kV 降壓變電所電氣部分初步設(shè)計V沈陽工程學(xué)院畢業(yè)設(shè)計VI引 言發(fā)電廠及電力系統(tǒng)專業(yè)的畢業(yè)設(shè)計是培養(yǎng)學(xué)生綜合運用大學(xué)三年所學(xué)理論知識,獨立分析和解決工程實際問題的初步能力的一個重要環(huán)節(jié)。其設(shè)計內(nèi)容結(jié)合相關(guān)的參考文獻進行編寫,由于水平有限,難免會有錯誤疏漏之處,請參閱老師多給予批評指正。進行本變電所繼電保護和自動裝置的規(guī)劃設(shè)計。設(shè)計本變電所電氣主接線的基本形式。電力系統(tǒng)是國民經(jīng)濟的重要能源部門,而變電所的設(shè)計是電力工業(yè)建設(shè)中必不可少的一個項目。 我國的電力工業(yè)發(fā)展也很快,自 70 年代初,第一臺 300MW 機組數(shù)投運至 1988 年底,投產(chǎn) 600MW 機組以來,電力工業(yè)發(fā)展又上了一個新臺階。例如,工廠中的電動機,就是將電能轉(zhuǎn)換成機械能,拖動各種機械;又如我們常用的電燈,是將電能轉(zhuǎn)變?yōu)楣饽?,滿足照明需要。電能有許多優(yōu)點:首先,它可簡便地轉(zhuǎn)變成另一種形式的能量。因此可見,電力工業(yè)在國民經(jīng)濟中占有十分重要的地位,而且電力必須先行,才能滿足工農(nóng)業(yè)發(fā)展的需要。到 1991 年底,全國裝機總?cè)萘恳殉^150000MW,年發(fā)電量已達(dá) 億 kw?h。即,選擇本變電所主變壓器的型號、容量和臺數(shù)。進行本變電所高壓配電裝置的規(guī)劃設(shè)計。通過本次設(shè)計可以增強我們運用所學(xué)知識解釋實際問題的能力和創(chuàng)新能力,以便更好地適應(yīng)工作的需要。 Also, we used the Electric Company, is the power to change solar energy to meet the lighting needs. Second, a highvoltage power transmission lines, but also conveying a very long distance, the distance of electricity supply. In addition, ma