freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

重力壩廠房設(shè)計(jì)說(shuō)明書畢業(yè)設(shè)計(jì)(文件)

 

【正文】 70 內(nèi)力計(jì)算 71 .................................................................................................................................................... 73 頂板 73 河床式水電站設(shè)計(jì)及混凝土蝸殼結(jié)構(gòu)計(jì)算 邊墻,按照對(duì)稱配筋 73 .................................................................................................................................................... 73 頂板 74 邊墻 75 參考文獻(xiàn) 76 后記 77 流域概況 閩江西溪為福建省最大河流上游的西支,流經(jīng)福建省十四個(gè)縣市,與閩江北支建溪匯合于 南平市。本人完全意識(shí)到本聲明的法律后果由本人承擔(dān)。 作 者 簽 名: 日 期: 指導(dǎo)教師簽名: 日 期: 使用授權(quán)說(shuō)明 本人完全了解 大學(xué)關(guān)于收集、保存、使用畢業(yè)設(shè)計(jì)(論文)的規(guī)定,即:按照學(xué)校要求提交畢業(yè)設(shè)計(jì)(論文)的印刷本和電子版本;學(xué)校有權(quán)保存畢業(yè)設(shè)計(jì)(論文)的印刷本和電子版,并提供目錄檢索與閱覽服 務(wù);學(xué)??梢圆捎糜坝 ⒖s印、數(shù)字化或其它復(fù)制河床式水電站設(shè)計(jì)及混凝土蝸殼結(jié)構(gòu)計(jì)算 手段保存論文;在不以贏利為目的前提下,學(xué)??梢怨颊撐牡牟糠只蛉?jī)?nèi)容。 沙溪口水電站具備發(fā)電,航運(yùn) ,過(guò)木等的綜合效益,是福建電網(wǎng)的骨干電廠。水輪機(jī)型號(hào)均為 ZZ560LH850,轉(zhuǎn)輪直徑為 ,水輪機(jī)安裝高程 ,發(fā)電機(jī)層高程 ,取安裝場(chǎng)高程與發(fā)電機(jī)層同高。 非溢流壩壩頂高程 93m,上游面坡度為 1:,下游面坡度 1:,溢流壩堰頂高程 。水利水電工程 專業(yè)畢業(yè)設(shè)計(jì) 1 中文摘要 沙溪口水電站計(jì)劃建在福建省南平市上游的西溪上,是閩江流域的一個(gè)梯級(jí)電站,屬于河床式水電站。溢流壩段全長(zhǎng) 340m,設(shè)有 18 孔 溢流 孔,每孔凈寬取為 m,沿主河槽宣泄絕大部分洪水。下游校核洪水位 , 主廠房頂高程為 m, 廠房總長(zhǎng) ,寬 74m。 關(guān)鍵詞 沙溪口水電站、河床式廠房、重力壩、溢流壩、水輪機(jī)、發(fā)電機(jī)、抗滑穩(wěn)定性、揚(yáng)壓力、軸流式水輪機(jī)、發(fā)電機(jī)層結(jié)構(gòu)設(shè)計(jì) 河床式水電站設(shè)計(jì)及混凝土蝸殼結(jié)構(gòu)計(jì)算 Abstract Shaxikou Hydropower Station is prepared to built at Xixi stream, upstream the city of Nanping in Fujian Province. It is one of the cascade development in the Minjiang river basin. It is a powerhouse in river channel. The main structures of Shaxikou Hydropower Station is consist of overflow spillway dam, nonoverflow spillway dam, powerhouse and lock. The dams are concrete gravity dams. The overflow spillway dam lies in the centre of the riverbed. The powerhouse lies on the right, and the lock is located on the left. The top of the nonspillway dam is at an elevation of 93 meters. The upstream of the dam is vertical, the lower slope degree is 1:,and the upper slope degree is 1:. the crest of the weir is at an elevation of meters. The overflow spillway dam is about 340 meters long in total, with 18 openings each of 17 meters wide, discharging most of the flood flow along the main river channel. The normal water lever of the reservoir is meters,while the design flood water level of the reservoir reaches at meters. The checking flood water level is about 91 meters. And the dead water level is only meters. The design crosshead is meters. The project has a total installed capacity of 320MW. It houses four axialflow turbines coupled with generators 8MW each. The type of the turbine is ZZ560LH850. The diameter of the turbine is meters. The runner setting is at an elevation of meters. The generator floor is at an elevation of meters. And it is the same with the service or erection bay. However, the checking tailwater lever is meters. The top of the powerhouse is at an elevation of 108 meters. And the powerhouse is about meters long and meters wide. 220KV anf 110KV switchyard is located on the platform at the right side of downstream tailrace. The lock with the dimension of 100m 20m (L W depth) is located on the left side of the spillway. Shaxikou Hydropower Station has the prehensive benefits of 水利水電工程 專業(yè)畢業(yè)設(shè)計(jì) 3 generating electricity,shipping transportation, navigation afloating woods and etc.. It has a very important position in the electricity work of Fujian Province. KEYWORDS Shaxikou Hydropowerstation, power house in river channel, concrete gravity dam, over flow dam, binatory, hydrogenerator, stability against sliding, uplift pressure, axial flow type turbine, structure design of generator floor, 畢業(yè)設(shè)計(jì)(論文)原創(chuàng)性聲明和使用授權(quán)說(shuō)明 原創(chuàng)性聲明 本人鄭重承諾:所呈交的畢業(yè)設(shè)計(jì)(論文),是我個(gè)人在指導(dǎo)教師的指導(dǎo)下進(jìn)行的研究工作及取得的成果。 作者簽名: 日 期: 水利水電工程 專業(yè)畢業(yè)設(shè)計(jì) 5 學(xué)位論文原創(chuàng)性聲明 本人鄭重聲明:所呈交的論文是本人在導(dǎo)師的指導(dǎo)下獨(dú)立進(jìn)行研究所取得的研究成果。 作者 簽名: 日期: 年 月 日 學(xué)位論文版權(quán)使用授權(quán)書 本學(xué)位論文作者完全了解學(xué)校有關(guān)保留、使用學(xué)位論文的規(guī)定,同意學(xué)校保留并向國(guó)家有關(guān)部門或機(jī)構(gòu)送交論文的復(fù)印件和電子版,允許論文被查閱和借閱。西溪全長(zhǎng) 349 公里,邵武至順昌段河道坡降 %,已建安沙水電站位于沙溪中游末端,控制集水面積 5184 平方公里。 水文氣象條件 1. 水文氣象情 況 西溪的降水量觀測(cè),解放前從 1935 年開始,但站點(diǎn)少,資料斷續(xù)不全,精度較差。 水文測(cè)驗(yàn):西溪最早于 1938 年 7 月在沙溪的沙縣。至 1978年沙溪沙縣站已積累三十年資料,富屯溪洋口站也有三四十年的實(shí)測(cè)資料。 天然河道水位流量關(guān)系曲線, 1979 年 3 月在花竹站下游約 公里鯉魚洲壩段社壩址上下水尺。降雨量地區(qū)分布有自東南向北遞增的趨勢(shì)。壩區(qū)最低氣溫 ≤ 0 度的天數(shù),全年平均為 天,以一月份出現(xiàn)的機(jī)會(huì)最多。 ( 3)蒸發(fā) 西溪花竹以上流域蒸發(fā)量以邵武,延寧,將樂(lè),清流,永安,沙縣六站觀測(cè)資料為計(jì)算的依據(jù),根據(jù) 1952~1978 年資料 求得,多年平均水面蒸發(fā)量 ,年最大蒸發(fā)量 ,年最小蒸發(fā)量 ,年內(nèi)各月蒸發(fā)量以七月最大,為 ,二月最小為 ,陸地蒸發(fā)量按水量平衡原理推求,多年平均為 ??紤]支池潭徑流系列較短,從 1954 年起才同步,故壩址多年平均流量采用花竹站 1951~1978 年流量系列計(jì)算得為 778 秒立方米,徑流模數(shù)為 萬(wàn)立方米 /秒平方公里。根據(jù) 30 年來(lái)的實(shí)測(cè)資料分析,較大洪水形成原因以及歷史特大洪水大部分均屬與鋒雨造成。 6. 泥沙 壩址沒(méi)有實(shí)測(cè)的資料,考慮采用洋口與沙縣兩站實(shí)測(cè)懸移質(zhì)輸沙率多年平均值,經(jīng)過(guò)年徑流比推算,以洋口與沙縣兩站多年平均侵蝕模數(shù)綜合 分析的成果比較推得壩址懸移質(zhì)年輸沙量約為 公斤 /立方米。北西向和南北向三組,北東向斷層多屬壓性,但也有彈性的,北西向斷層多屬?gòu)埿?。?kù)岔中無(wú)碳酸鹽類巖石分布,故無(wú)滲漏之慮。在綠水坑上游側(cè) 2200 米處,巖層有侏羅系有順坡向斷層構(gòu)成滑動(dòng)面。并要求對(duì)下壩址兩岸壩頭穩(wěn) 定條件及河庫(kù)傾角軟弱夾層分布和力學(xué)性質(zhì)作進(jìn)一步查明,以分析其對(duì)壩基穩(wěn)定的影響。巖性以石英片巖最為堅(jiān)硬,長(zhǎng)英片巖次之,云母片巖最軟,但其抗壓強(qiáng)度一般也有 500kg/cm2。斷層帶由膠結(jié)角礫巖壓碎巖組成,對(duì)工程地質(zhì)條件影響不大。右岸大部由全風(fēng)化和強(qiáng)風(fēng)化所組成 ,其穩(wěn)定坡角建議為 40~45176。 3 壩軸線選定 選定壩址后,對(duì)于原擬訂三條勘探線的勘 1,因上游臨近左河床深潭,潭底最底高程為 米,同時(shí) 1, 2 勘線之間河床深槽存在 F50, F6 等斷裂聚匯帶;3 勘線下游右岸靠近沖溝。 2. 云母片近似平行于理面的一組干抗壓強(qiáng)度值為 公斤 /平方厘米。 根
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報(bào)告相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1