c) If you menced construction or reconstruction between July 13, 2001 and May 20, 2003, you must demonstrate initial pliance with either the proposed emission limit or the promulgated emission limit no later than November 17, 2003 or no later than 180 days after startup of the source, whichever is later, according to 167。What test methods and other procedures must I use to demonstrate initial pliance with the emission limits for particulate matter?(a) You must conduct each performance test that applies to your affected source according to the requirements in 167。Q = Volumetric flow rate of stack gas, dry standard cubic foot per hour (dscf/hr)。 andQi= Volumetric flow rate of effluent gas from exhaust stream “i”, dry standard cubic foot per minute (dscfm).(e) For a control device applied to emissions from a blast furnace casthouse, sample for an integral number of furnace tapping operations sufficient to obtain at least 1 hour of sampling for each test run.(f) For a primary emission control device applied to emissions from a BOPF with a closed hood system, sample only during the primary oxygen blow and do not sample during any subsequent reblows. Continue sampling for each run for an integral number of primary oxygen blows.(g) For a primary emission control system applied to emissions from a BOPF with an open hood system and for a control device applied solely to secondary emissions from a BOPF, you must plete the requirements of paragraphs (g)(1) and (2) of this section:(1) Sample only during the steel production cycle. Conduct sampling under conditions that are representative of normal operation. Record the start and end time of each steel production cycle and each period of abnormal operation。s line of sight generally in the direction of the center of the cooler.[68 FR 27663, May 20, 2003, as amended at 71 FR 39586, July 13, 2006]167。(b)(2), you must establish sitespecific operating limits according to the procedures in paragraphs (b)(1) and (2) of this section. You may establish the parametric monitoring limit during the initial performance test or during any other performance test run that meets the emission limit.(1) Using the CPMS required in 167。s value and the 29 previous daily values.(e) To demonstrate initial pliance with the alternative operating limit for volatile organic pound emissions from the sinter plant windbox exhaust stream in 167。 = Conversion factor (dscf/dscm)。 and(2) For each capture system subject to the operating limit in 167。(b)(2), you have established appropriate sitespecific operating limits and have a record of the pressure drop and scrubber water flow rate measured during the performance test in accordance with 167。(d)(2), you have demonstrated initial pliance if the 30day rolling average of the volatile organic pound emissions from the sinter plant windbox exhaust stream, measured during the initial performance test in accordance with 167。(d)(1), you have demonstrated initial pliance if the 30day rolling average of the oil content of the feedstock, measured during the initial performance test in accordance with 167。(a)(1)。 andK = Daily production rate of sinter, tons/hr.(4) Continue the sampling and analysis procedures in paragraphs (e)(1) through (3) of this section for 30 consecutive days.(5) Compute and record the 30day rolling average of VOC emissions for each operating day.(f) You may use an alternative test method to determine the oil content of the sinter plant feedstock or the volatile organic pound emissions from the sinter plant windbox exhaust stack if you have already demonstrated the equivalency of the alternative method for a specific plant and have received previous approval from the applicable permitting authority.[68 FR 27663, May 20, 2003, as amended at 71 FR 39586, July 13, 2006]167。Mc= Average concentration of total gaseous nonmethane organics as carbon by Method 25 (40 CFR part 60, appendix A), milligrams per dry standard cubic meters (mg/dscm) for each day。(d)(1), you must demonstrate initial pliance according to the procedures in paragraphs (d)(1) through (3) of this section.(1) Sample the feedstock at least three times a day (once every 8 hours), posite the three samples each day, and analyze the posited samples using Method 9071B, “nHexane Extractable Material(HEM) for Sludge, Sediment, and Solid Samples,” (Revision 2, April 1998). Method 9071B is incorporated by reference (see 167。(b)(1), you must certify that the system operated during the performance test at the sitespecific operating limits established in your operation and maintenance plan using the procedures in paragraphs (a)(1) through (4) of this section.(1) Concurrent with all opacity observations, measure and record values for each of the operating limit parameters in your capture system operation and maintenance plan according to the monitoring requirements specified in 167。What test methods and other procedures must I use to demonstrate initial pliance with the opacity limits?(a) You must conduct each performance test that applies to your affected source according to the requirements in 167。 andK = Conversion factor, 7,000 grains per pound (gr/lb).(d) If you apply two or more control devices in parallel to emissions from a sinter plant discharge end or a BOPF, pute the average flowweighted concentration for each test run using Equation 2 of this section as follows:Where:Cw= Flowweighted concentration, gr/dscf。 and(2) Compute the processweighted mass emissions (Ep) for each test run using Equation 1 of this section as follows:Where:Ep= Processweighted mass emissions of particulate matter, lb/ton。(a)(2)(ix).167。(d)(2). You must conduct the performance tests within 180 calendar days after the pliance date that is specified in 167。 and the date upon which continuous monitoring systems have been installed and certified and any applicable operating limits have been set, you must maintain a log detailing the operation a