【正文】
for arbitration which shall be conducted by its Shanghai SubCommission in Shanghai at the Claimant’s option in accordance with the Commission’s arbitration rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties。 如經(jīng)協(xié)商仍未能達(dá)成協(xié)議 , 則應(yīng)提交中國國際經(jīng)濟(jì)貿(mào)易仲裁委員會裁決。 For the PVmodules, Hareon additionally warrants: If within the first ten(10) years from date of sale to the buyer as shown in shipping invoice of Hareon, any PVmodule(s) exhibits a power output less than 90% of the minimum Peak Power at STC1 as specified at the date of delivery in Hareon’s Product information Sheet, within a period of twentyfive(25) years from date of sale to the buyer as shown in shipping invoice of Hareon any PVmodule(s) exhibits a power output less than 80% of the minimum Peak Power at STC1 as specified at the date of delivery in Hareon’s Product information Sheet,provided that such loss in power is determined by Hareon ( at its sole and absolute discretion) to be due to defects in material or workmanship, Hareon will replace such loss in power by either providing to the customer additional PVmodules to make up such loss in power, or by repairing or replacing the defective PV module(s), or by refunding the Purchase Price at the option of Hareon. 3 “Peak Power” is the power in watt peak that a PV module generates in its maximum power point. ”STC” are as follows (a) light spectrum of AM , (b) an irradiation of 1,000 W per m2 and (c) a cell temperature of 25 degree Centigrade. The measurements are carried out in accordance with IEC904 as tested at the juncti