【正文】
on is high, in the second pond, prone to denitrification, produce nitrogen gas, sludge floating。 Denitrification is found, should reduce air, increasing the backflow or mud。 Such as water load should be reduced into water or step back flow。 The sludge age slightly long, sludge aging, also easy to produce foam. With surface spray water or remove foam deforming agent, deforming agent monly used engine oil, kerosene, silicone oil, turnover of ~ mg/L. By increasing the sludge concentration in aeration or reduced air, also can effectively control the bubble. When the wastewater contains surface active material is large, easily removed by foam separation process or other method in advance. Also can consider adding a set of oil removal device. But the most important is the better water management, reduce the high oilbearing wastewater and other toxic wastewater into. Sludge upfloating problem When the oil content in waste water is too large, qualitative light, the whole System in the process of operation can39。 Can be adjusted by adding the nitrogen fertilizer, phosphate fertilizer, mixture of nutrient balance (BOD5: N: P = 100:5)。 at the same time, nitrate and nitrite, ammonia was oxidized to at this point, the mixture in aerobic condition. By aeration zone in the downstream of the aerator, water turbulence state into a state of advection, maintained at a minimum velocity of flow, ensure that activated sludge in a suspended state ( m/s) average velocity. Microbial oxidation process consumes dissolved oxygen in water, until the value to zero in the DO, mixture in hypoxia state. 3. The CD method and application widely in the largespan tunnel, the CRD construction method in this System, BOD degradation is a continuous process, nitrification and denitrification occurred in the same pool. Because of the limitation of structure of the oxidation ditch can be effective for BOD, but phosphorus removal denitrification ability is limited. Carrousel Moseley oxidation ditch the influence factors of biological nitrogen removal Influence factors of phosphorus removal from Carrousel Moseley oxidation ditch is primarily a sludge age, nitrate concentration and substrate concentration. Research shows that when the total sludge age of 8 ~ 10 d, the lion39。[12]().北京,中國(guó)建筑工業(yè)出版社,2000[8],化學(xué)工業(yè)出版社,2002.[6]中國(guó)市政工程西南設(shè)計(jì)研究院主編::中國(guó)建筑工業(yè)出版社,2001 [3]他們?cè)谌粘5膶W(xué)習(xí)生活中給予了我很多幫助,幫我度過了一個(gè)個(gè)難關(guān),點(diǎn)點(diǎn)滴滴見真情,他們是我的好同學(xué)好朋友。其次,感謝三年來給予我教育的老師們。謝 辭在我三個(gè)多月的畢業(yè)設(shè)計(jì)生活中,老師和同學(xué)們給予了我很多的幫助,在此我向他們表示衷心的感謝!但從總體來看其運(yùn)行費(fèi)用低,勿需投藥;總水力停留時(shí)間少于其它同類工藝;在厭氧(缺氧)、好氧交替 在主要處理構(gòu)筑物的計(jì)算階段,本設(shè)計(jì)主要對(duì)污水及污泥工藝中的主要夠處理構(gòu)筑物進(jìn)行了設(shè)計(jì)計(jì)算。不過這對(duì)我而言也是一筆寶貴的財(cái)富,使我有機(jī)會(huì)綜合運(yùn)用大學(xué)三年所學(xué)的專業(yè)知識(shí),全面了解工程設(shè)計(jì)的一般步驟和常用方法,更使我深刻的體會(huì)到了作為一名工程技術(shù)人員所應(yīng)有的科學(xué)、嚴(yán)謹(jǐn)、認(rèn)真的精神。1. 各處理構(gòu)筑物間連接管渠的長(zhǎng)度:表42各處理構(gòu)筑物間連接管渠的長(zhǎng)度管渠名稱長(zhǎng)度(m)管渠名稱長(zhǎng)度(m)出廠管入河至接觸池90初沉池至沉砂池30接觸池至二沉池20沉砂池至細(xì)格柵20二沉池與反應(yīng)池60細(xì)格柵至提升泵房15反應(yīng)池至初沉池35提升泵房至中格柵15河流洪水位標(biāo)高:113m跌水位:跌水井水位:出水廠管總損失:90=接觸池出水管總損失:20=接觸池出水口的損失:合計(jì):接觸池水位:接觸池進(jìn)口損失;合計(jì):混合池水位:混合池進(jìn)水口損失:混合池入水管總損失:60=二次沉淀池出水口損失:合計(jì):二次沉淀池出水總渠起端水位與集水槽出水口水位相同,二次沉淀池集水槽堰上水頭:自由跌水:合計(jì):二次沉淀池水位:二次沉淀池進(jìn)水頭部的損失:二次沉淀池進(jìn)水管總損失:10=集泥配水井內(nèi)出口損失:合計(jì):集泥配水井內(nèi)井水位:集泥配水井進(jìn)口損失:總損失:25=合計(jì):曝氣池積水槽水位:曝氣池集水槽堰上水頭:自由跌水:合計(jì):曝氣池水位:曝氣池進(jìn)水口損失:合計(jì):曝氣池配水口水位:配水進(jìn)出水損失:合計(jì):配水井井內(nèi)水位:配水井進(jìn)口損失:輻流式初沉池出水管損失:30=輻流式初沉池配水口水位:配水井進(jìn)口損失:沉砂池出水總管損失:20=平流沉砂池出水總渠起端與集水槽出水口水位相同,其水位為:沉砂池出水堰的堰上水頭:自由跌水:合計(jì):沉砂池水位:細(xì)格柵過柵水頭損失:細(xì)格柵前水位:中格柵柵后的水面標(biāo)高中格柵前城市污水主干管的水面標(biāo)高為 ,則中格柵柵后的水面標(biāo)高為:?=,中格柵柵后水深為 ,則污水提升泵所需靜揚(yáng)程為:H′=?=。表41各構(gòu)筑物污水水頭損失計(jì)算表構(gòu)筑物名稱水頭損失(cm)構(gòu)筑物名稱水頭損失(cm)格柵10~25雙層沉淀池10~20沉砂池10~25曝氣池污水潛流池入池25~50輻流沉淀池50~60污水跌入水池50~150厭氧池10~20混合池和接觸池10~302)污水流經(jīng)連接前后兩處構(gòu)筑物管渠(包括配水設(shè)備)的水頭損失。為了降低運(yùn)行費(fèi)用和便于維護(hù)管理,污水在處理構(gòu)筑物之間的流動(dòng),以重力流考慮為宜(污泥流動(dòng)不在此例)。 高程布置方法(1)選擇兩條距離較低,水頭損失最大的流程進(jìn)行水力計(jì)算。而應(yīng)選取經(jīng)常出現(xiàn)的高水位作為排放水位,當(dāng)水體水位高于設(shè)計(jì)排放水位時(shí),可進(jìn)行短時(shí)間的提升排放。 (3)預(yù)處理構(gòu)筑物之間跌水等浪費(fèi)水頭的現(xiàn)象,充分利用地形高差,實(shí)現(xiàn)自動(dòng)流水。污水處理廠污水處理高程布置的主要任務(wù)是:確定各構(gòu)筑物和泵房的標(biāo)高,確定處理構(gòu)筑物之間連接管(渠)的尺寸及其標(biāo)高,確定污水提升泵的揚(yáng)程。設(shè)置液下攪拌機(jī)1臺(tái),功率10kw。每個(gè)豎管上安設(shè)的空氣擴(kuò)散器的數(shù)目為:每個(gè)空氣擴(kuò)散器的配氣量為:(5)剩余污泥量的計(jì)算tw= Y=其中,F(xiàn)w—(KgMLSS/d) Lr—去除的BOD濃度 tw污泥齡 Q單位(m3/h) 帶入可得:Y=1為了使沉淀池內(nèi)水流更穩(wěn)、進(jìn)出水配水更均勻、存排泥更方便,常采用圓形輻流式二沉池。查表得:水中溶解氧飽和度:空氣擴(kuò)散器出口處的絕對(duì)壓力為: 代入各值得 空氣離開曝氣池面時(shí),氧氣的質(zhì)量分?jǐn)?shù): 式中:——空氣擴(kuò)散器的氧轉(zhuǎn)移效率,取曝氣池混合液中平均氧飽和度(按最不利的溫度條件考慮)為: 按最不利溫度條件考慮,代入各值得水溫在條件下,脫氧清水的充氧量: 取其值代入各值得:相應(yīng)的最大時(shí)需氧量為 曝氣池平均時(shí)供氣量,即 代入各值得去除每的供氣量為:每立方米污水的供氣量為: 曝氣池最大時(shí)需氧量的供氣量: 本系統(tǒng)采用空氣提升器在回流污泥井中提升污泥,空氣量按回流污泥量的倍考慮,污泥回流比。 沉淀池長(zhǎng)度(v=4mm/s,停留時(shí)間t=) 沉淀池總寬度B=== 沉淀池的數(shù)量:取b=6m, n=B/b=, 取n=8 校核長(zhǎng)寬比 L/b=(介于3—5之間) 污泥部分所需總?cè)莘eV已知進(jìn)水SS濃度=200mg/L初沉池效率設(shè)計(jì)50%,則出水SS濃度設(shè)污泥含水率96%,兩次排泥時(shí)間間隔T=2d,污泥容重 每格池污泥所需容積V0V0=179。/s。=(其中α1為進(jìn)水渠展開角)(5)柵槽與出水渠道連接處的漸窄部分長(zhǎng)度=(6)過柵水頭損失(h1) 因柵條邊為矩形截面,取k=3,則 其中ε=β(s/e)4/3 h0:計(jì)算水頭損失 k:系數(shù),格柵受污物堵塞后,水頭損失增加倍數(shù),取k=3 ε:阻力系數(shù),與柵條斷面形狀有關(guān),當(dāng)為矩形斷面時(shí)β=(7)柵后槽總高度(H) 取柵前渠道超高h(yuǎn)1=,則柵前槽總高度H1=h+h1=+=, 柵后槽總高度H=h+h1+h2=++=(8)格柵總長(zhǎng)度L=L1+L2+++++++/tan60176。=(9)每日柵渣量,取KZ=采用機(jī)械清渣。 設(shè)計(jì)參數(shù)設(shè)計(jì)流量:平均流量:Qa=30000m3/d=347 L/S= m3/s生活污水量總變化系數(shù)Kz=(查表)則Qmax=347≈503 L/S= m3/s 泵前中格柵格柵由一組或數(shù)組平行的金屬柵條、塑料齒鉤或金屬篩網(wǎng)、框架及相關(guān)裝置組成,傾斜安裝在污水渠道、泵房集水井的進(jìn)口處或污水處理廠的前端、用來截留污水中較粗大漂浮物和懸浮物。因此,經(jīng)過幾種工藝的比較,決定采用方法 2,即對(duì)污泥進(jìn)行濃縮,脫水處理后,將泥餅外運(yùn),進(jìn)行最終處置。污泥處理要求如下:第一,減少有機(jī)物,使污泥穩(wěn)定化;第二,減少污泥體積,降低污泥后續(xù)處置費(fèi)用;第三,減少污泥中有毒物質(zhì)。輻流沉淀池工藝成熟,適合范圍廣,故采用之??捎米鞒醭脸鼗蚨脸亍?quán)衡比較之后,考慮到擬建污水處理廠的水質(zhì)特點(diǎn),從實(shí)際處理效率和經(jīng)濟(jì)運(yùn)行成本出發(fā),決定采用平流式沉沙池。按柵條的種類可分為鏈條式格柵、弧形格柵、輻射式格柵、轉(zhuǎn)筒式格柵和活動(dòng)?xùn)艞l式格柵。國(guó)內(nèi)工程實(shí)例多,容易獲得工程設(shè)計(jì)和管理經(jīng)驗(yàn)技術(shù)先進(jìn)成熟。進(jìn)水水質(zhì)和出水水質(zhì)的要求是選擇除磷脫氮工藝的一個(gè)重要因素。圖 2—2 氧化溝工藝流程圖 A2/O工藝A2/O工藝是一種實(shí)用化的脫氮除磷工藝。與氧化溝配套的二沉池也有合建或分建等多種形式,其供氧和推流均靠提升式表面曝氣設(shè)備,這種設(shè)備分為早期使用的水平中心軸旋轉(zhuǎn)葉輪和后來出現(xiàn)的卡魯塞爾氧化溝所用的垂直或帶葉片的曝氣器,由于氧化溝水深較淺(一般 3米左右),且流程較長(zhǎng),可以按照曝氣器前作缺氧段,曝氣器后作好氧段的方式設(shè)計(jì)運(yùn)行,提供厭氧菌與好氧菌交替作用的條件,達(dá)到在缺氧段反硝化,在好氧段除BOD及硝化的設(shè)計(jì)目的。圖 2—1 SBR 工藝流程圖 氧化溝工藝氧化溝又名氧化渠或循環(huán)曝氣池,1950 年由荷蘭公共工程研究所研究成功。沉淀工藝:使混合液泥水分離,此時(shí)反應(yīng)器相當(dāng)于二沉池,排放工序:排除曝氣沉淀后產(chǎn)生的上清液,作為處理水排放,一直到最低水位,在反應(yīng)器底部殘留一部分活性污泥作為種泥。綜上,本設(shè)計(jì)決定對(duì)SBR工藝、A 2/O和氧化溝工