【正文】
on is high, in the second pond, prone to denitrification, produce nitrogen gas, sludge floating。 Denitrification is found, should reduce air, increasing the backflow or mud。 Such as water load should be reduced into water or step back flow。 The sludge age slightly long, sludge aging, also easy to produce foam. With surface spray water or remove foam deforming agent, deforming agent monly used engine oil, kerosene, silicone oil, turnover of ~ mg/L. By increasing the sludge concentration in aeration or reduced air, also can effectively control the bubble. When the wastewater contains surface active material is large, easily removed by foam separation process or other method in advance. Also can consider adding a set of oil removal device. But the most important is the better water management, reduce the high oilbearing wastewater and other toxic wastewater into. Sludge upfloating problem When the oil content in waste water is too large, qualitative light, the whole System in the process of operation can39。 Can be adjusted by adding the nitrogen fertilizer, phosphate fertilizer, mixture of nutrient balance (BOD5: N: P = 100:5)。 at the same time, nitrate and nitrite, ammonia was oxidized to at this point, the mixture in aerobic condition. By aeration zone in the downstream of the aerator, water turbulence state into a state of advection, maintained at a minimum velocity of flow, ensure that activated sludge in a suspended state ( m/s) average velocity. Microbial oxidation process consumes dissolved oxygen in water, until the value to zero in the DO, mixture in hypoxia state. 3. The CD method and application widely in the largespan tunnel, the CRD construction method in this System, BOD degradation is a continuous process, nitrification and denitrification occurred in the same pool. Because of the limitation of structure of the oxidation ditch can be effective for BOD, but phosphorus removal denitrification ability is limited. Carrousel Moseley oxidation ditch the influence factors of biological nitrogen removal Influence factors of phosphorus removal from Carrousel Moseley oxidation ditch is primarily a sludge age, nitrate concentration and substrate concentration. Research shows that when the total sludge age of 8 ~ 10 d, the lion39。[12]().北京,中國建筑工業(yè)出版社,2000[8],化學工業(yè)出版社,2002.[6]中國市政工程西南設計研究院主編::中國建筑工業(yè)出版社,2001 [3]他們在日常的學習生活中給予了我很多幫助,幫我度過了一個個難關,點點滴滴見真情,他們是我的好同學好朋友。其次,感謝三年來給予我教育的老師們。謝 辭在我三個多月的畢業(yè)設計生活中,老師和同學們給予了我很多的幫助,在此我向他們表示衷心的感謝!但從總體來看其運行費用低,勿需投藥;總水力停留時間少于其它同類工藝;在厭氧(缺氧)、好氧交替 在主要處理構筑物的計算階段,本設計主要對污水及污泥工藝中的主要夠處理構筑物進行了設計計算。不過這對我而言也是一筆寶貴的財富,使我有機會綜合運用大學三年所學的專業(yè)知識,全面了解工程設計的一般步驟和常用方法,更使我深刻的體會到了作為一名工程技術人員所應有的科學、嚴謹、認真的精神。1. 各處理構筑物間連接管渠的長度:表42各處理構筑物間連接管渠的長度管渠名稱長度(m)管渠名稱長度(m)出廠管入河至接觸池90初沉池至沉砂池30接觸池至二沉池20沉砂池至細格柵20二沉池與反應池60細格柵至提升泵房15反應池至初沉池35提升泵房至中格柵15河流洪水位標高:113m跌水位:跌水井水位:出水廠管總損失:90=接觸池出水管總損失:20=接觸池出水口的損失:合計:接觸池水位:接觸池進口損失;合計:混合池水位:混合池進水口損失:混合池入水管總損失:60=二次沉淀池出水口損失:合計:二次沉淀池出水總渠起端水位與集水槽出水口水位相同,二次沉淀池集水槽堰上水頭:自由跌水:合計:二次沉淀池水位:二次沉淀池進水頭部的損失:二次沉淀池進水管總損失:10=集泥配水井內出口損失:合計:集泥配水井內井水位:集泥配水井進口損失:總損失:25=合計:曝氣池積水槽水位:曝氣池集水槽堰上水頭:自由跌水:合計:曝氣池水位:曝氣池進水口損失:合計:曝氣池配水口水位:配水進出水損失:合計:配水井井內水位:配水井進口損失:輻流式初沉池出水管損失:30=輻流式初沉池配水口水位:配水井進口損失:沉砂池出水總管損失:20=平流沉砂池出水總渠起端與集水槽出水口水位相同,其水位為:沉砂池出水堰的堰上水頭:自由跌水:合計:沉砂池水位:細格柵過柵水頭損失:細格柵前水位:中格柵柵后的水面標高中格柵前城市污水主干管的水面標高為 ,則中格柵柵后的水面標高為:?=,中格柵柵后水深為 ,則污水提升泵所需靜揚程為:H′=?=。表41各構筑物污水水頭損失計算表構筑物名稱水頭損失(cm)構筑物名稱水頭損失(cm)格柵10~25雙層沉淀池10~20沉砂池10~25曝氣池污水潛流池入池25~50輻流沉淀池50~60污水跌入水池50~150厭氧池10~20混合池和接觸池10~302)污水流經連接前后兩處構筑物管渠(包括配水設備)的水頭損失。為了降低運行費用和便于維護管理,污水在處理構筑物之間的流動,以重力流考慮為宜(污泥流動不在此例)。 高程布置方法(1)選擇兩條距離較低,水頭損失最大的流程進行水力計算。而應選取經常出現(xiàn)的高水位作為排放水位,當水體水位高于設計排放水位時,可進行短時間的提升排放。 (3)預處理構筑物之間跌水等浪費水頭的現(xiàn)象,充分利用地形高差,實現(xiàn)自動流水。污水處理廠污水處理高程布置的主要任務是:確定各構筑物和泵房的標高,確定處理構筑物之間連接管(渠)的尺寸及其標高,確定污水提升泵的揚程。設置液下攪拌機1臺,功率10kw。每個豎管上安設的空氣擴散器的數目為:每個空氣擴散器的配氣量為:(5)剩余污泥量的計算tw= Y=其中,F(xiàn)w—(KgMLSS/d) Lr—去除的BOD濃度 tw污泥齡 Q單位(m3/h) 帶入可得:Y=1為了使沉淀池內水流更穩(wěn)、進出水配水更均勻、存排泥更方便,常采用圓形輻流式二沉池。查表得:水中溶解氧飽和度:空氣擴散器出口處的絕對壓力為: 代入各值得 空氣離開曝氣池面時,氧氣的質量分數: 式中:——空氣擴散器的氧轉移效率,取曝氣池混合液中平均氧飽和度(按最不利的溫度條件考慮)為: 按最不利溫度條件考慮,代入各值得水溫在條件下,脫氧清水的充氧量: 取其值代入各值得:相應的最大時需氧量為 曝氣池平均時供氣量,即 代入各值得去除每的供氣量為:每立方米污水的供氣量為: 曝氣池最大時需氧量的供氣量: 本系統(tǒng)采用空氣提升器在回流污泥井中提升污泥,空氣量按回流污泥量的倍考慮,污泥回流比。 沉淀池長度(v=4mm/s,停留時間t=) 沉淀池總寬度B=== 沉淀池的數量:取b=6m, n=B/b=, 取n=8 校核長寬比 L/b=(介于3—5之間) 污泥部分所需總容積V已知進水SS濃度=200mg/L初沉池效率設計50%,則出水SS濃度設污泥含水率96%,兩次排泥時間間隔T=2d,污泥容重 每格池污泥所需容積V0V0=179。/s。=(其中α1為進水渠展開角)(5)柵槽與出水渠道連接處的漸窄部分長度=(6)過柵水頭損失(h1) 因柵條邊為矩形截面,取k=3,則 其中ε=β(s/e)4/3 h0:計算水頭損失 k:系數,格柵受污物堵塞后,水頭損失增加倍數,取k=3 ε:阻力系數,與柵條斷面形狀有關,當為矩形斷面時β=(7)柵后槽總高度(H) 取柵前渠道超高h1=,則柵前槽總高度H1=h+h1=+=, 柵后槽總高度H=h+h1+h2=++=(8)格柵總長度L=L1+L2+++++++/tan60176。=(9)每日柵渣量,取KZ=采用機械清渣。 設計參數設計流量:平均流量:Qa=30000m3/d=347 L/S= m3/s生活污水量總變化系數Kz=(查表)則Qmax=347≈503 L/S= m3/s 泵前中格柵格柵由一組或數組平行的金屬柵條、塑料齒鉤或金屬篩網、框架及相關裝置組成,傾斜安裝在污水渠道、泵房集水井的進口處或污水處理廠的前端、用來截留污水中較粗大漂浮物和懸浮物。因此,經過幾種工藝的比較,決定采用方法 2,即對污泥進行濃縮,脫水處理后,將泥餅外運,進行最終處置。污泥處理要求如下:第一,減少有機物,使污泥穩(wěn)定化;第二,減少污泥體積,降低污泥后續(xù)處置費用;第三,減少污泥中有毒物質。輻流沉淀池工藝成熟,適合范圍廣,故采用之??捎米鞒醭脸鼗蚨脸亍嗪獗容^之后,考慮到擬建污水處理廠的水質特點,從實際處理效率和經濟運行成本出發(fā),決定采用平流式沉沙池。按柵條的種類可分為鏈條式格柵、弧形格柵、輻射式格柵、轉筒式格柵和活動柵條式格柵。國內工程實例多,容易獲得工程設計和管理經驗技術先進成熟。進水水質和出水水質的要求是選擇除磷脫氮工藝的一個重要因素。圖 2—2 氧化溝工藝流程圖 A2/O工藝A2/O工藝是一種實用化的脫氮除磷工藝。與氧化溝配套的二沉池也有合建或分建等多種形式,其供氧和推流均靠提升式表面曝氣設備,這種設備分為早期使用的水平中心軸旋轉葉輪和后來出現(xiàn)的卡魯塞爾氧化溝所用的垂直或帶葉片的曝氣器,由于氧化溝水深較淺(一般 3米左右),且流程較長,可以按照曝氣器前作缺氧段,曝氣器后作好氧段的方式設計運行,提供厭氧菌與好氧菌交替作用的條件,達到在缺氧段反硝化,在好氧段除BOD及硝化的設計目的。圖 2—1 SBR 工藝流程圖 氧化溝工藝氧化溝又名氧化渠或循環(huán)曝氣池,1950 年由荷蘭公共工程研究所研究成功。沉淀工藝:使混合液泥水分離,此時反應器相當于二沉池,排放工序:排除曝氣沉淀后產生的上清液,作為處理水排放,一直到最低水位,在反應器底部殘留一部分活性污泥作為種泥。綜上,本設計決定對SBR工藝、A 2/O和氧化溝工