freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

施工導(dǎo)流聯(lián)合泄流計算模型及導(dǎo)流方案風(fēng)險分析(文件)

2025-06-01 00:23 上一頁面

下一頁面
 

【正文】 n the joint discharge basis of construction diversion system, using the Montecarlo method to simulate the flood and discharge process, the risk model analyses the distribution of the flood level in front of the cofferdam and dynamic risk under different diversion standard by flood routing model and the cluster analysis model. The case study institutes that the putational model for joint discharge and risk analysis model of construction diversion schemes are reasonable and effective.Key words: construction diversion。施工導(dǎo)流聯(lián)合泄流計算模型及導(dǎo)流方案風(fēng)險分析甄紅鋒1 柴換成2(1. 2. 山東水利職業(yè)學(xué)院 山東 日照 276826)摘 要:通過分別研究明渠導(dǎo)流、隧洞導(dǎo)流以及壩體缺口導(dǎo)流的水力計算,提出切實可行的聯(lián)合泄流水力計算模型。 joint discharge。目前,施工導(dǎo)流工程中所存在的風(fēng)險問題己經(jīng)引起廣泛的重視,并將風(fēng)險與導(dǎo)流標(biāo)淮[1]的選擇聯(lián)系起來進(jìn)行研究。2. 施工導(dǎo)流聯(lián)合泄流水力計算模型作者簡介:甄紅鋒(1973-),男,碩士在讀,山東巨野人,從事水利工程施工與水力學(xué)的教學(xué)研究工作。導(dǎo)流洞還會遇到多層、多條群洞聯(lián)合泄流,同一洞不同時期或不同洞同一時期可能同時存在有壓、半有壓、無壓的復(fù)雜局面。對于漸變流水面線的計算采用分段求和法。 聯(lián)合泄流水力計算模型[5]無論是隧洞群聯(lián)合導(dǎo)流還是缺口與底孔聯(lián)合導(dǎo)流,在已知總泄流量和下游水位的情況下,任何泄水建筑物聯(lián)合泄流必須同時滿足以下兩個條件: (7)式中,為同一上游水位下,一個泄流建筑物的泄流量;為上游水位。(5) 如果圍堰是過水圍堰,則當(dāng)(圍堰擋水設(shè)計流量),n個泄水建筑物泄流且圍堰參與過水。因此,圍堰填筑過程中分月堰前水位超過堰頂高程的可能性為: (8)其中:Z上(t)為第t月上游圍堰堰前水位;H上堰高為第t月上游圍堰堰頂高程。 洪水過程的不確定性分析洪水過程的不確定性主要表現(xiàn)在洪量的不確定和洪水歷時的不確定性。 調(diào)洪演算模型根據(jù)水量平衡方程式: (13)其中,分別為計算時段始、末入庫流量;分別為計算時段始、末出庫流量;分別為計算時段始、末的水庫蓄水量。 導(dǎo)流動態(tài)風(fēng)險計算確定導(dǎo)流圍堰上游水位風(fēng)險,要系統(tǒng)考慮河
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1