【正文】
new equipment it takes only 5 operator to seal the master carton cabinet preprocess and final assembly bine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partition board plate ining package improvement: change the package material and simplify package way to reduce pack cost(from to RMB) and cut down unpack operation time( saving 12 seconds) with RD to change PCBA process from dispensing process to solder paste process, in order to cut down welding failure rate after wavesoldering. In this case charge of PCBA fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators) to the small order quantity of the product, study the less humanizing process for small products to reduce the change over loss time(38 operators*30minute 20 operator*40minutes=340minutes) and improve 8% of the motion effective rate Reason for Leaving: Not very good economic benifit of the pany,little chance to promote both in position and welfare 【pany name】 (202007 ~ 202006) Company Type: Joint Venture Company Category: Electrical,Microelectronics Job Title: Junior Engineer Positions: Industrial Engineer Job Description: and maintain the standard labor time, perform line balance to improve production capacity capacity assessment: Base on the MPS and the capacity of production line to forecast the workforce requirement the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process the workshop layout and line layout design b