freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

雙溝鎮(zhèn)a2o-mbr設(shè)計(jì)方案-wenkub

2023-05-29 00:09:27 本頁面
 

【正文】 hat required is short. What’s more, it has highvolume load and strong –capability of shock load. Membrane Biological Reactor replaces the traditional secondary separation of solid with membrane in order to separate solid and liquid. As the film has high retention rate and it can return the concentrated sludge back to the bioreactor so that the bioreactor can have microorganism with high concentration and a long sludge retention time. Compared with conventional activated sludge process the MBR process can achieve better removal efficiency with shorter hydraulic retention time. The concept of this design is replacing the secondary settling tank in the traditional process with MBR membrane pool. On the basis of the A2 / O biological sewage pool’s removal for nitrogen and phosphorus, membrane pool has the further treatment function. To solve the problem that the content of total phosphorus in effluent is not stable, we add specific pharmaceutical to the intake department of membrane pool for removing phosphorus.The main structures of the treatment process include medium bar screen, sewage pumping station, thin bar screen, Vortextype grit chamber, A2 / O biological pool, MBR membrane pool, Chlorine concentration tank, Storage basins ,sludge dehydration shop etc. In preliminary treatment, the original water enters medium screening in order to remove heavy solids and floatable materials, in case that it influences the working of the following devices and the pipelines. Then it enters vortextype grit chamber, which is used to remove bigger inorganic sand of heavy density after the wastewater is pumped into the thin screening. Afrer this the wastewater goes to the A2 / O biological pool for organics, nitrogen and phosphorus removal .Then the wastewater goes to MBR membrane pool for the remaining organic matter , nitrogen and phosphorus to treat deeply. At last the wastewater enters Chlorine concentration tank and is % of sludge are recycled to the oxidation ditch and the rest are pumped to sludge dehydration shop to discharge after thickening and dehydration.Under this process for wastewater treatment, the effluent standards can reach grade A. Keywords: Sewage treatment, A2/OMBR process,Grade A standards109 第一篇 概述1概述根據(jù)雙溝鎮(zhèn)總體規(guī)劃及相關(guān)資料進(jìn)行城市污水處理工程設(shè)計(jì),具體內(nèi)容有:(1).污水收集管網(wǎng)系統(tǒng)設(shè)計(jì)(2).污水處理工藝設(shè)計(jì)(3).污水處理構(gòu)筑物設(shè)計(jì)(4).污泥處理構(gòu)筑物設(shè)計(jì)(1)《室外排水設(shè)計(jì)規(guī)范》(GB50014—2006); (2)《投資估算指標(biāo)》(第二冊,排水工程)中國建筑工業(yè)出版社; (3)《建筑制圖標(biāo)準(zhǔn)匯編》中國建筑工業(yè)出版社,1996; 區(qū)域概況雙溝鎮(zhèn)中心地理坐標(biāo)為東經(jīng)118176。 total nitrogen contents (TN) ≤ 15mg / L。 total phosphorus contents (TP): / L。 the oxygen demand for biochemistry in the 5 days (BOD5): 317mg / L。市政污水管網(wǎng)收集的污水經(jīng)中格柵攔截較大的懸浮物和漂浮物后,由污水泵房提升至細(xì)格柵和旋流式沉砂池去除比重較大的無機(jī)顆粒,在經(jīng)過生物池脫氮除磷后再通過膜池對污水中剩余的有機(jī)物質(zhì)及氮磷進(jìn)一步降解去除,處理后的污水經(jīng)氯消毒后排放。而膜生物反應(yīng)器用膜組件替代了傳統(tǒng)的二沉池進(jìn)行固液分離,由于膜的高截留率并將濃縮污泥回流到生物反應(yīng)器內(nèi),而使生物反應(yīng)器內(nèi)具有很高的微生物濃度和很長的污泥停留時(shí)間,所以MBR法可以在比傳統(tǒng)活性污泥法更短的水力停留時(shí)間內(nèi)達(dá)到更好的去除效率。設(shè)計(jì)進(jìn)水水質(zhì)為:懸浮物(SS):239mg/L;五日生化需氧量(BOD5):317mg/L;化學(xué)需氧量(CODcr):221mg/L;總氮(TN):32mg/L;總磷(TP):4mg/L;氨氮(NH3N):30mg/L。為改善雙溝鎮(zhèn)的水體環(huán)境,使雙溝鎮(zhèn)的污水能夠得到全面的收集和完善的處理,擬建設(shè)一污水處理廠,設(shè)計(jì)中污水廠服務(wù)的人口為近期5萬人,遠(yuǎn)期11萬人。,。設(shè)計(jì)出水標(biāo)準(zhǔn)達(dá)到《城鎮(zhèn)污水處理廠污染物排放標(biāo)準(zhǔn)》(GB189182002)一級A標(biāo)準(zhǔn),即:懸浮物(SS)≤10mg/L;五日生化需氧量(BOD5)≤10mg/L;化學(xué)需氧量(CODcr)≤50mg/L;總氮(TN)≤15mg/L;總磷(TP)≤;氨氮(NH3N)≤5mg/L。本設(shè)計(jì)的理念是利用MBR膜池代替?zhèn)鹘y(tǒng)工藝中的二沉池,在A2/O生物池對污水進(jìn)行脫氮除磷的基礎(chǔ)上,膜池達(dá)到進(jìn)一步深度處理的效果。在整個(gè)處理工程中,污泥回流比為100%,其余的由污泥脫水機(jī)房濃縮脫水后外運(yùn)。 oxygen demand for biochemistry in the 5 days (BOD5): 317mg / L。 ammonia nitrogen contents (NH3N): 30mg / L. The designed effluent standards can achieve to grade A standards ,which es from Municipal Wastewater Treatment Plant’s Emission Standards of Pollutant (GB189182002).Namely: suspended solids (SS) ≤ 10mg / L。 total phosphorus contents (TP) ≤ / L。18′38″,北緯33176。個(gè)小農(nóng)場。規(guī)劃到2010年雙溝鎮(zhèn)鎮(zhèn)區(qū)人口將達(dá)到5萬人,%,2020年鎮(zhèn)區(qū)人口達(dá)11萬人,%。 水文及水文地質(zhì)境內(nèi)主要河流有窯河、懷洪新河二條大河流,較大的水庫有羅崗、陳澗、李陸、劉符套等水庫。目前,水廠的水取自于深井地下水,日生產(chǎn)能力為5000m3。其他城鎮(zhèn)生活污水直接排入附近河流,嚴(yán)重污染雙溝鎮(zhèn)河流水質(zhì)。根據(jù)《城市排水工程規(guī)劃規(guī)范》表 。根據(jù)《城市給水工程規(guī)劃規(guī)范》 單位工業(yè)用地用水量指標(biāo): m3/(km2根據(jù)所給資料,將雙溝鎮(zhèn)工業(yè)用地定為三類工業(yè)用地定為三類工業(yè)用地, m3/(km2根據(jù)《室外排水設(shè)計(jì)規(guī)范》 城鎮(zhèn)污水的設(shè)計(jì)水質(zhì)應(yīng)根據(jù)調(diào)查資料確定,或參照鄰近城鎮(zhèn)、類似工業(yè)區(qū)和居住區(qū)的水質(zhì)確定。由于我國城市化 進(jìn)程的加快和國民經(jīng)濟(jì)的高速發(fā)展,水環(huán)境污染和水資源短缺日趨嚴(yán)重。雙溝鎮(zhèn)域河流最終均匯入長江,直接影響到長江水質(zhì)。 工程內(nèi)容本工程內(nèi)容是:建設(shè)該鎮(zhèn)污水處理廠,同時(shí)完成管網(wǎng)鋪設(shè)工程,將污水收集后送到污水處理廠進(jìn)行處理。早期的合流制是將排除的水不經(jīng)處理和利用直接就近排入水體,這種排水系統(tǒng)對水體污染嚴(yán)重。排除生活污水、城市污水或工業(yè)廢水。城市及工業(yè)企業(yè)的規(guī)劃廢水的系統(tǒng)稱污水排水系統(tǒng)。一般又能符合城市衛(wèi)生的要求,式城市排水系統(tǒng)體制的發(fā)展方向。同時(shí),流入污水廠的水質(zhì)水量變化小,污水廠的運(yùn)行易于控制。(4)協(xié)調(diào)好與其他管道,、電纜和道路等工程的關(guān)系,考慮好與企業(yè)內(nèi)部管網(wǎng)的銜接。雙溝鎮(zhèn)被分為四個(gè)排水區(qū)域,在各排水區(qū)域內(nèi)各設(shè)一條主干管,將污水收集到區(qū)域的最低點(diǎn),由提升泵將污水送至污水處理廠,進(jìn)行處理。規(guī)范規(guī)定。在街坊和廠區(qū)內(nèi),最小管徑為200mm,街道最小管徑為300mm。(3)《城市排水工程規(guī)劃規(guī)范》(GB503182000)規(guī)范規(guī)定:~;~。當(dāng)排水管遇有翻越高地、穿越河流、軟土地基、長距離輸送污水等情況,無法采用重力流或重力流不經(jīng)濟(jì)時(shí),可采用壓力流。(5) 截流式合流制的截流干管宜沿受納水體岸邊布置。東邊的東環(huán)路主干管服務(wù)的區(qū)域?yàn)榻?jīng)三、經(jīng)四、經(jīng)五、經(jīng)六、經(jīng)七路所包圍的區(qū)域,東南方向雙中路主干管服務(wù)的區(qū)域?yàn)榻?jīng)十路、雙新路所包圍的區(qū)域,東西小街、雙西路上的主干管服務(wù)的面積為東大街、經(jīng)十路、文化路所包圍的區(qū)域,經(jīng)六路上的主干管服務(wù)的是經(jīng)五路、經(jīng)六路、經(jīng)七路、經(jīng)八路、經(jīng)九路所包圍的區(qū)域。兩個(gè)方案中,方案一中,將排水區(qū)域劃分成了四個(gè)區(qū)域,充分考慮了地面高程,管段順著地勢減低的方向鋪設(shè),減小了管段的埋設(shè)深度,同時(shí)也給施工帶來了方便,土方量減少,管網(wǎng)施工投資降低。對于一個(gè)面積較大的鎮(zhèn)來說,整體用一個(gè)主干管也不能夠很好的適應(yīng)城市的發(fā)展規(guī)劃。根據(jù)以上的方案比選,遵循污水管道的布設(shè)原則進(jìn)行污水管道設(shè)計(jì),鋪設(shè)污水收集管網(wǎng),管網(wǎng)布設(shè)見圖“雙溝鎮(zhèn)污水收集管網(wǎng)規(guī)劃圖”。兩種管材布置,均需污水提升泵站。 每一設(shè)計(jì)管段的設(shè)計(jì)流量可能包括三種流量:本段流量q1,轉(zhuǎn)輸流量q2,集中流量q3。②根據(jù)管徑和充滿度求管段的水深,h=D(h/D),將結(jié)果列入表中。2點(diǎn)的管內(nèi)底標(biāo)高等于1點(diǎn)的管內(nèi)底標(biāo)高減降落量。將結(jié)果列入表中。詳見表23表23 污水提升泵站參數(shù)表泵站位置泵設(shè)計(jì)參數(shù)泵 型泵站規(guī)模(臺)流量(L/s)揚(yáng)程(m)節(jié)點(diǎn)47200ZQ371用1備節(jié)點(diǎn)121250Z371用1備節(jié)點(diǎn)124100ZQ381用1備節(jié)點(diǎn)122300TLW500IA1用1備為避免地面坡度較大而導(dǎo)致的管段流速過大、坡度較大的問題,在地面坡度較大的地方設(shè)置了跌水井,可減少開挖的土方量,降低工程的投資。由于該鎮(zhèn)給水排水設(shè)施不完善、城市排水設(shè)施規(guī)劃普及率低。d), m3/(km2d), m3/(km2表34進(jìn)入污水處理廠參考設(shè)計(jì)污水水質(zhì)項(xiàng) 目污水水質(zhì),mg/LCODcrBOD5SSNH3NTPTN生活污水30工業(yè)廢水35025025030很小30總進(jìn)水水質(zhì)31722123930432污水處理廠對污水中的主要污染物的處理程度是確定處理工藝的基本依據(jù),而處理程度主要根據(jù)尾水受納水體的功能劃分及環(huán)境容量,依照國家頒布的有關(guān)排放標(biāo)準(zhǔn)來確定。第二種方案是在傳統(tǒng)的二級生物處理系統(tǒng)中強(qiáng)化生物脫氮,使出水N指標(biāo)穩(wěn)定達(dá)到一級A標(biāo)準(zhǔn),再在后面采用短流程深度處理技術(shù),使出水P指標(biāo)達(dá)到一級A標(biāo)準(zhǔn),最終實(shí)現(xiàn)出水C、N、P達(dá)到一級A標(biāo)準(zhǔn)。本設(shè)計(jì)擬采用上述方案中的一種,且以A2/O同步脫氮除磷工藝為基本工藝,常見的達(dá)污水排放一級標(biāo)準(zhǔn)的污水處理工藝有AA2/O工藝+深度處理、倒置A2/O工藝+深度處理、活性污泥法+膜生物反應(yīng)器(MBR)。 倒置A2/O工藝所謂倒置A2/O即把常規(guī)脫氮除磷系統(tǒng)的厭氧、缺氧環(huán)境倒置過來,可得到更好的脫氮除磷效果。目前倒置A2/O工藝已廣泛應(yīng)用于新建城鎮(zhèn)污水處理廠和老廠脫氮除磷工藝的改造,但在實(shí)際運(yùn)行中常因進(jìn)水碳源不足和工藝控制不合理,致使出水磷含量無法達(dá)到一級A標(biāo)準(zhǔn)。 工藝的比選從工藝流程上來說,根據(jù)目前的實(shí)驗(yàn)研究看,AA2/O工藝中遇到的最主要的問題就是碳源
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1