freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

塑料制品廠供配電設(shè)計電力專業(yè)畢業(yè)設(shè)計畢業(yè)論(已修改)

2025-06-23 10:17 本頁面
 

【正文】 1 目錄 論文摘要 ..................................................... 3 第一章 設(shè)計任務(wù) .............................................. 5 設(shè)計要求 .............................................. 5 設(shè)計依據(jù) .............................................. 5 第二章 負荷計算和無功功率補償 ................................. 8 負荷計算 ............................................. 8 無功功率補償計算 ..................................... 9 變壓器選擇 .......................................... 12 總變電所位置和型式的選擇 ............................. 13 第三章 變配電所主接線方案的設(shè)計 .............................. 16 變配電所主接線方案的設(shè)計原則與要求 ................... 16 變配電所主接線方案的技術(shù)經(jīng)濟指標(biāo) ..................... 16 高壓配電所主接線方案 ................................ 16 第四章 短路電流計算及一次側(cè)設(shè)備選擇 .......................... 17 短路電流的計算 ...................................... 17 高壓一次側(cè)設(shè)備選擇與校驗 ............................. 20 各車間變電所車間干線設(shè)備的選擇 ....................... 25 第五章 供配電線路的選擇計算 ................................. 27 總配電所架空線進線 選擇 ............................... 27 10KV 母線的選擇 ..................................... 28 車間變電所高壓進線選擇 .............................. 29 2 車間變電所低壓進線線的選擇 .......................... 32 低壓母線選擇 ....................................... 34 車間變電所車間干線選擇 .............................. 34 第六章 供電系統(tǒng)過電流保護及二次回路方案 ...................... 37 供電系統(tǒng)過電流保護 .................................. 37 變電所二次回路方案 ................................. 42 第七章 防雷接地 ............................................. 43 變電所的防雷保護 ..................................... 43 變電所接地裝置的計算 ................................ 43 謝辭 ........................................................ 45 參考文獻及附錄 .............................................. 46 3 論文摘要 某塑料制品廠車間變電所和配電系統(tǒng)設(shè)計是對工廠供電具有針對性的設(shè)計。設(shè)計對工廠供電方式、主要設(shè)備的選擇、保護裝置的配置及防雷接地系統(tǒng)進行了 相應(yīng) 的敘述,內(nèi)容主要包括高壓側(cè)和低壓側(cè)的短路計算,設(shè)備選擇及校驗,主要設(shè)備繼電保護設(shè)計,配電裝置設(shè)計,防雷和接地設(shè)計等。 本設(shè)計考慮了所有用電設(shè)備并對這些負荷進行了計算。通過計算出的有功、無功和視在功率選擇變壓器的大小和相應(yīng)主要設(shè)備的技術(shù)參數(shù),再根據(jù)用戶對電壓的要求,計算電容器補償裝置的容量,從而得出所需電容器的大小。 根據(jù)與供電部門的協(xié)議,決定總配變電所及配電系統(tǒng)的主接線圖。電氣主接線對電氣設(shè)備的選擇,配電所的布置,運行的可靠性和靈活性,操作和檢修的安全以及今后的擴建,對電力工程建設(shè)和運行的經(jīng)濟節(jié)約等,都由很大的影響。 本設(shè)計在主要設(shè)備的繼電保護設(shè)計和整定計算中,對電力變壓器、真空斷路器等主要設(shè)備的保護配置提出了 要求,明確了保護定值計算方法。 關(guān)鍵詞:變電所,配電系統(tǒng),負荷和短路計算,設(shè)備選型,繼電保護 4 Abstract A plastic products factory workshop substation and electrical system design of the factory is the design of power supply has targeted. Set A program to factory powersupply modes, the main equipment selection, protective device configuration and lightningproof grounding system are detailed narrated, content mainly includes high voltage side and low voltage side short circuit calculation, equipment selection and calibration, the main equipment relay protection design, power distribution equipment design, lightning protection and grounding design, etc. This design is given all electrical equipment and calculated to these load. Through the active, calculate the reactive power and ShiZai power transformer size and corresponding choice of main equipment of technical parameters, again according to user requirements of voltage capacitor pensation devices, calculating the capacity needed, concluded that the size of the capacitors. According to the agreement with the power supply departments, decided to always match the Lord and distribution system for substation hookup. The main electrical wiring for electrical equipment choice, the distribution place of decorate, operation reliability and flexibility, operation and maintenance of safety and future expansion of electrical engineering, construction and operation, saving the economy by influence. This design in the main equipment of relay protection design and setting calculation of power transformer, vacuum circuit breaker protection configuration of such main equipments proposed requirements, clear the protection setting value calculation method. Key Words: Substation,power distribution systems, load and short circuit calculation, equipment selection, relay protection 5 第一章 設(shè)計任務(wù) 根據(jù)本廠所能取得的電源及本廠用電負荷的實際情況,并適當(dāng)考慮到工廠生產(chǎn)的發(fā)展,按照安全可靠、技術(shù)先進、經(jīng)濟合理的要求,確定變電所的位置,確定變電所主變壓器的臺數(shù)、容量與類型,選擇變電所主接線方案及高低壓設(shè)備和進出線,選擇整定繼電保護,確定防雷和接地裝置。最后按要求寫出設(shè)計書, 并繪 出 相關(guān)設(shè)計 圖紙。 工廠總平面圖 圖 11 塑料廠平面布置圖 6 工廠負荷情況 本廠的負荷性質(zhì),生產(chǎn)車間為三班制,部分車間為單班或兩班制,全年最大負荷利用小時數(shù)為 5000h,屬于三級負荷。本廠設(shè)有薄膜、單絲、管材、注射等四個車間,設(shè)備造型全部采用我國最新定型設(shè)備,此外還有輔助車間及其設(shè)施,全廠各車間設(shè)備容量見表 13。 供用電協(xié)議 本廠與電業(yè)部門所簽訂的供用電協(xié)議主要內(nèi)容如下: ( 1) 從電業(yè)部門某 60/100KV 變電站 10KV 架空線向本廠供電,該站距離廠南測 ( 2) 變電站 10KV 配電線路定時限過電流保護裝置的整定時間為 2S 車間變電所的整定時間應(yīng)不大于 1S ( 3) 在總降變電站 10KV側(cè)計量 ( 4) 本廠的功率因數(shù) cos? 要求在 ( 5)電業(yè)部門變電站 10KV 母線為無限大電源系統(tǒng),其短路容量為 200MVA。供電系統(tǒng)圖見圖 12 圖 12 供電系統(tǒng)圖 本廠自然條件 本廠自然條件為: ( 1) 最熱月平均最高溫度為 35176。 C ( 2) 土壤中 ~ 1m 深處一年中最熱月平均溫度為 20℃ ( 3) 年平均雷暴日為 30d ( 4) 土壤凍結(jié)深度為 ( 5) 主導(dǎo)風(fēng)向夏季為南風(fēng) 7 附: 全廠各車間設(shè)備容量及計算用系數(shù) 列表 序號 車間設(shè)備名稱 設(shè)備容量 /KW dK cos? tan? 備注 變電所 1 薄膜車間 1400 2 原料庫 30 3 生活間 10 1 4 成品庫(一) 25 5 成品庫(二) 24 6 包裝材料庫 20 車間變電所 1 單絲車間 1385 2 泵房及其附屬設(shè)備 20 變電所 1 注塑車間 189 2 管材車間 880 變電所 1 備料復(fù)制車間 189 2 生活間 10 1 3 浴室 3 .08 1 4 鍛工車間 30 5 原料生活間 15 1 6 倉庫 15 7 機修模具間 100 8 熱處理車間 150 9 聊焊車間 180 變電 所 1 鍋爐房 200 2 試驗室 125 3 輔助材料庫 110 4 油泵房 15 5 加油站 10 6 辦公室、招待所、食堂 15 表 13 全廠各車間設(shè)備容量及計算用系數(shù) 8 第二章 負荷計算和無功功率補償 負荷計算 各車間、變電所負荷計算(均采用需要系數(shù)法) 附注:各車間、各變電所負荷合計時,同時系數(shù)分別取值: pK?? =; qK?? = 現(xiàn)以 變電所車間負荷計算為例,計算過程如下: 變電所 ( 1) 薄膜車間 有功功率: )1(30P = dK eP = 1400=840KW 無功功率: )1(30Q = 30P tan? =840 = 視在功率: )1(30S =?cos30P=840247。 =1400KVA ( 2) 原料車間 有功功率: )2(30P = dK eP =30 = 無功功率: )2(30Q = 30P tan? = =13Kvar 視在功率: )2(30S =?cos30P=247。 =15KVA ( 3) 生活間 有功功率: )3(30P = dK eP =10 =8K
點擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計相關(guān)推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號-1